Loading...
HomeMy WebLinkAboutStructural Engineer Report 01.10.2013THUNDER MOUNTAIN TESTING 2970 Ronlin Avenue, Grand Junction, Colorado 81504 Office (970) 256-9965 Cell (970) 210-7008 Fax (970) 314-7067 Encana Oil & Gas 2717 CR 215, Suite 1 000 Parachute. CO 81635 ATTN: Mr. Rick Barnett RE: Encana Story Gulch Compressor Station Compressor Building Expansion 8801 Sprague Gulch Road Rifle, Colorado Dear Mr. Barnett. 1am_:to 10, 2013 Permit// BLCO-7-12-256 I As requested, structural steel special inspection was conducted per the IRC 2009 Edition - Chapter 17: Structural Tests and Special Inspection and Garfield County requirements. 1 arrived on site at 12:00 PM. I met with Mr. Many Ruggles with Encana to review project requirements and high strength bolting specifications. The pre -manufactured metal building fabricator for this project is Clear Creek Construction in Oklahoma City, OK. The steel erector for this project is Clear Creek Construction in Oklahoma City, OK. and also Elkhorn Construction in DeBeque. CO. Prior to my arrival 1 received and re%iewed a copy of an engineering clarification report dated 11-30-12 from Mr. BilI Rose P.E. with Group W Engineering. Inc in Lakewood, CO. referencing acceptance of the "tack" welds on the crane rail beams as referenced in my 10-26-12 report. Please refer to the attached report for project documentation. Visual re -inspection was conducted at the Roof Framing Plan level on the repairs to the overhead crane rail splice plates and bolts as referenced in my 10-26-12 report. Inspection was conducted at grid line A — D & 6 — 9. Crane rail splice plates and bolts were observed to be properly installed. Res •.a .tf ly Sub r itted. Lo l" lax ►tfl W AWS CW1 ti91040201 ICC Certified #0863569 -SI & Thunder Mountain Testing Scoti L Maxwell CW1 91040201 0C1 EXP 4/112015