Loading...
HomeMy WebLinkAboutApplication-PermitGarl'ield County Building & Planning Department 108 Bth Street Suite 401 Glenwood Springs, CO 81601- Phone: (970)945-8212 Fax: (970)384-3470 Project Address Parcel No. Subdivision Section Township Range DR SW1/4 Sec33, T5S, R96W, CO 213532100009 Owner Information Address Phone Cell Berry Petroleum I Marathon Oil 950 17th ST Denver CO 80202- (303)825-3344 Contractor(s) OPD Proposed Construction I Details FEES DUE Fee Commercial Building Fee Plan Check Fee Total: Monday, July 6, 2009 Phone Primary Contractor (281)371-7500 Yes Amoullt $223.25 $145.11 $368.36 Valuation: Total Sq Feet: FEES PAID $ 12,977.28 288 lnv.Total Paytype · Amt Paid Amt D!le lnv # BLC0-6-09-19514 $ 368.36 Check# 5913 Check# 5910 $81.22 $287.14 $0.00 Required Inspections: Fo• lnspootlons ooll' 1 {970)384-5003 Inspection IVR See Permit Record Building Department Copy 2 I 2 3 4 5 6 7 8 9 10 II 12 GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8111 Street, Suite 401, Glenwood Springs, Co 81601 Phone: 970-945-8212 I Fax: 970-384-3470 I Inspection Line: 970-384-5003 www.garficld~county.com Parcel No: (this information is available at the assessors office 970-945~9134) 2135-321-00-009 Job Address: (if an address has not been assigned, please provide Cr, Hwy or Street Name & City) or and legal description SW 1/4, Section 33, Township 5 South, Range 96 West of the 6th P.M. Lot No: Block No: Subd./ Exemption: Owner: (prope!1)1 owner) Maili71 Address: Ph: Berry Petro/Marathon Oil 950 1 h StSte2400DenverC080202 (303) 825-3344 Contractor: Mailino-Address: Ph: OPD POB 81 0 Katy, TX 77 492 281-371-7500 Architect I Engineer: Mailing Address: Ph: Jerry Divin P.E. POB 810 Katy, TX 77492 281-371-7500 St§ Ft. of Building: 28 S~ Ft. or Acres of Lot: 88 acres Hei~ht: 9'-4' :• s¥~i'~§~'W&i\"Jl~~.~~~r&£fli.la~~it~~£al5t~itilff!lf~if~i~DY ;;J> Describe Work: Construction of a storage building. Please contact Phil Vaughan 970-625-5350 w/questions Class of Work: eJNew o Alteration o Addition Garage: Septic: o Attached 0 Detached o ISDS Driveway Permit: Owners valuation of Work: $33,000.00 $ NOTICE AltPh; Alt Ph: 281-371-5947 AltPh: No. of Floors: 1 o Community Authority. 1l1is application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. Ifthe signature below is not that of the Owner, a separate Jetter ofauthority, signed by the Owner, must be provided with this Application. Legal Aceess. A Building Permit cannot be issued without proof of legal and adequate access to the property for p<uposes of inspections by the Building Department. Other Permitw. Multiple separate permits may be reqtlired: (l) State Electrical Permit, (2) County ISDS Permit, (3) anotherpenuitrequired for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION I hereby certify that I have read this Application and that the information contained above is true and correct. I tmderstand that the Building Department accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Department. In consideration of the issuance ofthc Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, ISDS regulations and applicable land usc regulations (County Regu!ation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, ifthe location, constmction or use ofthe structurc(s) and fucility{ics), described above, arc not in compliance with County Rcgulation(s) or any other applicable law. I hereby grant pennission to the Building Department to enter the property, described above, to inspect the work. I further acknowledge that the issuance oftl1e Building Permit docs not prevent tl1e Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or usc of the StnlCturc{s) or faci!ity(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections ofthc work by the B11i!ding Department do not constitute an acceptance of responsibility or liability by the County ()f errors, omissions ()r discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE NOTICE & CERTIFICATION ABOVE: ~ 61 ~"''~"'-b~~ 6/29/09 OWNERS SIGNATUR~ DATE STAFF USE ONLY Special Conditions: I d-. C)")'). l.R' Adjusted Valuation: Plan Check Fee: l'l':l , Ji Permit Fee: tfr!-.,j, ~ Manu home Fee: Mise Fees: II "' ~!)69.l)~ ~.~ • H ISDS Fee: Total Fees: 3bR.3b Fees Paid: Balance Due: 3'1.'}.} BP No & lssuc Date: ISDS No & Issued Date: ~D+ .. IY =toq~ ~t~-"};(; . §12.~~ Setbacks: OCCGroup: ConstType: ~it f-1 VB B\0~ ,·· ~ ~ APPROVAL ••-. DATE p~\~J~~- APPROVAL •-~1 DATE . The following items are required by Garfield County for a final Inspection: 1) A final Electrical Inspection from the Colorado State Electrical Inspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to all IBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. 6/29/09 OWNERS SIGNATURE DATE Bapplicationdecember2007 Building Plan Review Description of Work: Storage building #12 for Non-hazardous materials Bin#: 0 Location Address: co Case Manager: Ken Smith Plan Case Number: BLDG-6-09-5969 Parcel: 213532100009 Application Date: 06/2912009 Building v _____ Engineered Foundation _____ Driveway Permit ----''--_Surveyed Site Plan _____ Septic Permit and Setbacks _____ G.radefropography 30% _____ ,Attach Residential Plan Review List J _____ Minimum Application Questionnare _____ ,Subdivision Plat Notes _____ Fire Department Review _____ V·aluation Determination/Fees -----1Red Line Plans/Stamps/Sticker _____ .Attach Conditions o/ ____ __,Application Signed ,/ _____ ,Plan Reviewer To Sign Application / _____ ,Parcel/Schedule No. 15* ___ ll' ___ .40# Snowload Letter -Manu. Homes ___ J __ ,Soils Report Tuesday, June 30, 2009 Contacts Owner: Berry Petroleum I Marathon Oil Applicant: Berry Petroleum I Marathon Oil Applicant Phone: (303)825-3344 Email: Planning/Zoning / -----'-'Property Line Setbacks _____ .30ft Stream Setbacks _____ ,Flood Plain \) _____ ,Building height ___ J_~oning Sign-off _____ ,Road Impact Fees ____ ___.HOAIDRC Approval _____ G.radefropography 40% _____ ,Planning Issues -----!Subdivision Plat General Comments: GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a pe1mit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and dming design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressme treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. l A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be in compliance with the 2003 IBC, IPC, IMC, IFGC, and IFC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the prope1ty lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes._X __ _ 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes Not necessary for this project _x __ 3. Does the site plan indicate the location and direction of the State, County or private road accessing the property? YesX 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes Not necessary for this project_X __ 5. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For pennit issuance only" or similar language? YesX Not necessary for this project __ _ 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the building code or per stamped engineered design? Y esX __ Not necessmy for this project __ 2 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Y es_X __ Not necessary for this project __ 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes __ Not necessary for project_X __ 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Y es_X __ Not necessary for this project __ 10. Do the plans include design loads as required under the IBC or IRC for roof snow loads, (a minimum of 40 pounds per square foot in Garfield County)? YesX __ Not necessary for this project __ II. Do the plans include design loads as required for floor loads under the IBC or IRC? Y es_X __ Not necessary for this project __ 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? YesX __ Not necessary for this project __ 13. Is the wind speed and exposure design included in the plan? Yes_X __ Not necessary for this project __ 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes~_ Not necessary for this project __ 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes_X __ Not necessary for this project __ _ 16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Check applicable zone district for building height maximum) YesX __ Not necessary for this project __ 3 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes __ Not necessary for this projectX __ 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes __ Not necessary for this project_X __ 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC or IRC? Yes __ Not necessary for this projectX __ 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Y esX __ Not necessary for this project __ 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? YesX __ Not necessary for this project __ 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? YesX __ No Not necessary for this project __ _ 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) Yes_X __ Not necessary for this project __ _ 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? YesX __ Not necessary for this project __ 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes __ Not necessary for this projectX __ 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes __ Not necessary for this project_X __ 4 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes __ Not necessary for this projectX __ 28. Have two (2) complete sets of construction drawings been submitted with the application? YesX 29. Have you designed or had this plan designed while considering building and other construction code requirements? YesX 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? YesX 31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For corner lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks. Yes_X __ 32. Do you understand that approval for design and/or construction changes are required prior to the implementation of these changes? YesX __ 33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? YesX __ 34. Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? YesX 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Codes? YesX 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30a.m. and 3:30p.m. Monday through Friday. Inspections are to be called in to 384-5003. YesX __ 5 3 7. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re-inspection fee? Yes_X __ 38. Are you aware that prior to submittal of a building permit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right of way; a County Road and Bridge permit; a Colorado Dept. of Highway Permit including a Notice to Proceed; a permit from the federal govemment or any combination. You can contact the Road & Bridge Department at 625-8601. See Phone book for other agencies YesX __ 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. YesX 40. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/ Schedule Number for the lot you are applying for this permit on prior to submittal of the building permit application? Your attention in this is appreciated. YesX __ 41. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Y esX __ (Please check with the building department about this requirement) 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes _x__ Not necessary for this project __ 43. Did an Architect seal the plans for your commercial project? State Law requires any commercial project with occupancy of more than 10 persons as per Section 1004 of the IBC to prepare the plans and specifications for the project. Yes Not Necessary for this project _x ____ _ 44. If you anticipate obtaining a water tap from the City of Rifle, please provide a letter indicating that the City will provide water service. No building permit application will be accepted without such a letter. Yes 6 I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. 6/29/09 Signature Date 970-625-5350 Phone: ______ ( days); _________ .(evenings) , Jackrabbit Compressor Station-Storage Bldg. #12 Project Name: D SW1/4,S33,T5S, R96W, 6th P.M. Project Address: ______________ _ Note: On any of these questions you may be required to provide this information. If required information is not supplied, delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessaty to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the petmit. C. Delay in proceeding with construction. BpcommDec2007 7 BUILDIN PERMIT GARFIELD COUNTY, COLORADO INSPECTION WILL NOT BE MADE UNLESS TH~S CARD IS ~OSTEO ON TIHE JOIB • Date lssued_J___..__,o (j...,_~~q ___ Permit No.Bu;O =ftrffi ·I CFf 2 AGREEMENT In consideration of the issuance of the permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structured for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building department and IMMEDIATELY BECOME NUll AND VOID. Use~6'-''B~u:::6""""""--'#:"~l -~ ~-----------­ Address or legal Description SW IJ41 ~~,..,S"'-11'""~-=-q-'--"~"-"'-"'----------- :::~:~~:=LtJN Contractor_DPD This Card Must Be Posted So It Is Plainly Visible From The Street Until Final Inspection INSPECTION RECORD Footing Driveway Foundation I Grouting Insulation CJ-JJ-1ft ~ Underground Plumbing Drywall Rough Plumbing E'ectrk finaD {by State inspedor) (Prior to Final) Rough Mechanical Septic Final Gas Piping FINAl 5-25-/0 ~')??~ Electric Rough {by State lnspe;::1l:or) (You Must Call For Flnallnsp~ction) (Prior to Framing) Notes Framing (to include Roof in place & Windows & Doors installed & Firestopping in place) APPROVED Date THIS PERMIT IS NOT TRANSFERABLE F<l< Inspection Call970-384·5003 Office 970-945~8212 108 8th Street, Suite 401 . Glenwood Springs, Colorado 81601 oq DO NOT DESTROY THIS CARD ~= PROTECTP:~!ft~!!!AGE (DO NOT lAMINATE) COLORADO STATE ELECTRICAL BOARD 1580 Logan Street, Suite 550 Denver, CO 80203-1941 PERMIT#: 665154 Permit Holder: PYRAMID CORPORATION 2375 LELAND AVE GRAND JUNCTION 815050000 Inspection Report Date Inspected: 02/26/2010 Phone: (970) 257-0800 Fax: ( ) -Email: kelly.nicholes@pyramidcorporation.com Site Owner: LAT 39 34'14.331" LONG 108 10'45.763" MARATHON OIL/BERRY PETROLEUM Status: Accepted Parachute, Garfield County, Phone: Inspection type: Complete Final Partial lnspection:N NEW COMMERCIAL Trim Permit:N Inspector: Cyrus Tuchscher 970-625-5085 Corrections: 1) Plaquard for NEG article still needs to be installed 210.5(C) Premises wiring system has branch circuits supplied from more than one nominal voltage system, each ungrounded conductor of a branch circuit shall be identified by phase or line and system at all termination, connection, and splices 2) Control room will require a new permit and inspections 3) Any added heat trace will require new permit and inspections 4) Installer on site making corrections for item #1 above 5) No building permit card available 6) Electric final OK Comments: 3/24/2010 Page 1 West Slope Testing & Inspection LLC 3177 Glendam Dr. Grand Junction, CO 81504 Phone:970-434-6988 Cell: 970-260-2844 Inspection Report Dates: 9-29-09 & 11-30-09 Client: Phil Vaughan Construction Management Inc. Report#10 Page 1 of 1 Project: Enterprise Gas Processing LLC Jack Rabbit Compressor Station Address: Garden Gulch Rd. Building Permit No.: 1092 Storage Building # 12 General Contractor: OPD Inspection of shop fabrication or field work at job site: Field Report: Visually inspected the high strength bolting at the end wall frame column & rafter connections. Also randomly tested a minimum of two bolts per connection for proper tightness. Verified that the flange & rod/cable bracing was installed. The high strength bolting inspected above appeared to be in significant conformance with the drawings & details, and appeared to meet the quality requirements of the AISC Specification for Structural Joints Using ASTM A325 or A490 Bolts. To the best of my knowledge this completes the special inspections of the high strength bolting & steel frame details as outlined above at the Storage Building #12. Inspector/Technician: Douglas E Young West Slope Testing & Inspection LLC 3177 Glendam Dr. Grand Junction, CO 81504 Phone: 970-434-6988 Cell: 970-260-2844 Inspection Report Dates: 9-29-09 & 11-30-09 Client: Phil Vaughan Construction Management Inc. Report #10 Page 1 of 1 Project: Enterprise Gas Processing LLC Jack Rabbit Compressor Station Address: Garden Gulch Rd. Building Permit No.: 1092 Storage Building #12 General Contractor: OPD Inspection of shop fabriCation or field work at job site: Field Report: Visually inspected the high strength bolting at the end wall frame column & rafter connections. Also randomly tested a minimum of two bolts per connection for proper tightness. Verified that the flange & rod/cable bracing was installed. The high strength bolting inspected above appeared to be in significant conformance with the drawings & details, and appeared to meet the quality requirements of the AlSC Specification for Structural Joints Using ASTM A325 or A490 Bolts. To the best of my knowledge this completes the special inspections of the high strength bolting & steel frame details as outlined above at the Storage Building #12. ?'ilm~·, Inspector/Technician: Douglas E Young B·:~;l~, /. ·~ .... CVfl, Parcel Detail Page 1 of3 Garfield County Assessor/Treasurer Parcel Detail Information A~ses.~m:Lireasurer J>ropertx .. .S.e!!rch I Assessor Sl!.b~etQ.lJ.eD' I AssessoLfuile~_S_e.l!r.ch Clerk.8cRecor.deLReceptiQJ1.Seo.rch Parc.eLD.e.t!!il I Y.alue Det!!il I S!!le~D-~llil I Resideuti!!!LC.om,mer.Ci<lUmp..rQ.YemeD.tD..e1!!il Land De.lliil I J>hotographs I Mill L.eYY.ReYe!llJes.D.et!!il I Tax Area II Account Number II Parcel Number II 2008 Mill Levy I I o26 II R260149 II 2m321oooo9 II 38.941 I Owner Name and Mailing Address !BERRY PETROLEUM COMPANY & !MARATHON OIL COMPANY 11999 BROADWAY STE 3700 !DENVER, CO 80202 Assessor's Parcel Description (Not to be used as a legal description) isECT,TWN,RNG:32-5-96 DESC: SEC 29 ls1/2SW, Sl/2SE, SEC 32 Nl/2NE, lsWNE, NW, DESC: Nl/2SW, SESW, SE, !SEC 33 SW BK:0256 PG:0504 IRECPT:762688 RECPT:751856 IRECPT:751853 RECPT:747980 IRECPT:743398 RECPT:743336 IRECPT:743335 RECPT:741635 IRECPT:740786 RECPT:738784 IRECPT:738783 BK:1863 PG:0987 IRECPT:7ll208 BK:1863 PG:0984 IRECPT:7ll207 BK:1863 PG:0981 IRECPT:711206 BK:1853 PG:367 IRECPT:709024 BK:0946 PG:0588 http://www.garcoact.com/assessor/parcel.asp?ParcelN umber=213 5321 00009 I I I I I I I I I I 7/6/2009 Parcel Detail Page 2 of3 IIBK:0946 PG:0590 BK:0662 PG:0311 II Location I Physical Address: IITWN 5 RGE 96 SEC 29,32,-I I Subdivision: I I I Land Acres: 11880 I' I Land Sq Ft: 110 I Section II Township II Range I I 32 II 5 II 96 I 2009 Property Tax Valuation Information II Actual Value II Assessed Value I I Land: II 15,29011 4,4301 I Improvements: II Oil 0 I Total: II 15,29011 4,4301 A(lditig_nal Value Detail Most Recent Sale Sale Date: 1112/17/2007 Sale Price: 111,215,000 Basic Building Characteristics Number of Residential 0 Buildings: Number ofCommllnd 0 Buildings: No Building Records Found Tax Information I Tax Year II Transaction Type II Amount I I 2008 II Tax Payment: Second Half II ($82.56)1 I 2008 II Tax Payment: First Half II ($82.56)1 II II http://www.garcoact.com/assessor/parcel.asp?Parce1Number=213532100009 716/2009 Parcel Detail I 2008 II Tax Amount II $165.121 I 2007 II Tax Payment: Second Half II ($77.04)1 I 2007 II Tax Payment: First Half II ($77.04)1 I 2007 I Tax Amount II $154.081 I 2006 Tax Payment: Second Half II ($32.10)1 I 2006 Tax Payment: First Half II ($32.10)1 I 2006 Tax Amount II $64.201 I 2005 I Tax Payment: Whole II ($64.32)11 I 2005 II Tax Amount II $64.321 I 2004 II Tax Payment: Whole II ($72.86)1 I 2004 II Tax Amount II $72.861 2003 II Tax Payment: Whole II ($78.12)1 2003 II Tax Amount II $78.121 2002 II Tax Payment: Whole II ($74.80)1 2002 II Tax Amount II $74.801 2001 Tax Payment: Whole II ($79.80)1 2001 Tax Amount II $79.801 2000 Tax Payment: Whole II ($96.28)1 2000 Tax Amount II $96.281 1999 Tax Payment: Whole I ($74.04)1 1999 Tax Amount I $74.041 MillLS)Y)'KeYenuesDetail Top oL!-'age Asses_sor Dilt&b&se .Se.an::.hQptiolts I J reasmerJ2at.!!l:mse.S.e.&<ch_Qption!l Clerk & .. Recor.deLDatabAse.Searc_h__Qp1LQ!ls Page 3 of3 The Garfield County Assessor and Treasurer's Offices make every effort to collect and maintain accurate data. However, Good Turns Software and the Garfield County Assessor and Treasurer's Offices are unable to warrant any of the information herein contained. Copyright © 2005 -2008 Good Turns Software. All Rights Reserved. Database & Web Design by Goo_dTurns Software. http://www.garcoact.com/assessor/parcel.asp?ParcelNumber=213 5321 00009 7/6/2009