HomeMy WebLinkAboutApplication - Permit.L
~(Q)[PJW
Garfield County No. I-\63'=F5]
Building & Sanitation Department
108 8th Street, Suite #401 Glenwood Springs, Co. 81601
Office 945-8212 Inspection Line 384-5003
Job Address: Sect 2,Twn 7, Rng 96, Cr 215
Locality: 2409-022-00-148
Use of Building: Gas Compressor Bldg/ callabran compressor Bldg
Owner: (owner) American S~da, LLP/ tJ_.ease) Williams production
Contractor: TPI lndustrial
Amount of Permit: $3,690.97
postage
. total
$5.00
$3,695.97
Date: 'D-6-0+
~ ..
-1
C.oflf,;ef: GARFIELD COU:'ITY BUILDING PERMIT APPLICATION
5 1. tAJa t fa~e 108 8 "Street, Suite 401, Glenwood Springs, co 81601
q~~l-':'4'3· '/ b <-{ ~ \~<:_~~70-945-8212/ Faxo 970-384-3470 /ln•peetlon Llneo 970-384-5003
PermitNo:VJ"l.J ., .. , .. ,,, Parcel/Schedule No: J.<{O'J-0();).-tJO -1</fS'
Ad<i~pss:/• '1 Mil"s nor-t"/-., ""' i,'f'i.f.;l,l{i}from f>c:.f"<'IC/.«1""e1 i-"rt'h Jef't" awl""' d,'r-+ r('"Q
S.5 c.r-Gek .,..,/ r,.rr> ht. Fr«ve( ,9.3 IVIt1«.> to s/f"e -;¥ur-th sick€' o.P -·~-0
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE
ISSUED BY THE STATE OF COLORADO.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WlTHLN 180 DAYS, OR, IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 180 DAYS AT ANY TIME AF'T'ER WORK IS COMMENCED.
! HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL
PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE
COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. 1'HE
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORI'fY
TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL CONSTRUCTION OR THE PERFORMANCE
OF
P-1
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACfOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND !..AND
USE REGULATIONS ADOPTED BY GARFIELD COUN'IY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRSAS AMENDED. THE SIGNER FURTHER AGREES
THAT IF THE ABOVE: SAID ORDINANCE:S ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE
ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME
NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL
FROM THEREAFfER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING
BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN JN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF
THIS JURISDICTION. THE REVIEW OF SUBMl'ITED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE
AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUN'IY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSI
BILI'fY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIO ER, BUILDER,
AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST.
~\a~-P
8-6-o-:t-
I HEREBY ACKNOWLEDGE THAT l HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL'.,"'-----
Ci. qbl" Pfeq;;e__ see
J$&4~·e'
!) Le<:i>e ajv-&eMe.-. r
2) A-uflwr 1-t::ctft'<>, Le tf er
Pict v ree
l-~-+
C(.Cf'~1-=t-
$1~fl.l. +Li
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, and/or State
Agencies where applicable.
9. If you will be connecting to a public water and/or sewer system, proof of the tap fees have been
paid and the connections inspected by the service provider prior to issuance of a C.O.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****A CERTIFICATE OF OCCUPANCY MAY TAKE UP TO 5 BUSINESS DAYS TO BE
PROCESSED AND ISSUED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF
OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A
C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS
FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit # \0:333
~ ~?~~~~~2~----
Signature
Bpapplicationoctober2006
Date
... ·•·
VALUATION/FEE DETERMINATION
fJn41fJ! ~orlCI. ojo -;r:-'1'111 S:eV'v,'cu 0eet.se.cf fo I)Jiflia(l){.s P~.
Applicant w, \\,CA-N>'"> ( ttl\1\'~cV\ Subdivision -
Address CVI-H) Lot/Block
Date 7-I 0 • cY] Contractor T p r ~US-/v' i Cv I
Finished (Livable Area):
Main ~.,..l vvv.J~
Upper
Lower
Other
Basement:
Total Square Feet ·
Valuation
Unfinished
2f 0 C:)LI X 3'\ s-s--
32\ jq)-_'5)--
Conversion of Unfinished to Finished
Plan Check Fee for Conversion
Valuation
Garage:
Valuation
Crawl Space:
·Valuation
Decks/Patios:
Covered
Valuation
Open
Valuation
Total Valuation
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite
the issuance of a permit it is important that complete information be provided. When reviewing
a plan and it's discovered that required information has not been provided by the applicant, this
will result in the delay of the permit issuance and in proceeding with building construction. The
owner or contractor shall be required to provide this information before the plan review can
proceed. Other plans that are in line for review may be given attention before the new
information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the
plans to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan and in order to determine compliance with the
building, plumbing and mechanical codes, applicants are requested to review the following
checklist prior to and during design.
Plans to be included for a Building Permit must be on draft paper at least lS"x 24"" and
drawn to scale.
I
J
"1
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade
and original grade line. A section showing in detail, from the bottom of the footing to the top of
the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and
spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building
material. Engineered foundations may be required. Check with the Building Department.
A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must
be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H.
windspeed, wind exposure B or C, and a 36 inch frost depth.
All sheets need to be identified by number and indexed. All of the above requirements must be
met or your plans will be returned.
All plans submitted must be incompliance witb the 2003 IBC, IPC, IMC and IFGC.
Applicants are required to indicate appropriately and to submit completed checklist at
time of application for a permit:
I. Is a site plan included that identifies the location of the proposed structure, additions or
other buildings, setback easements, and utility easements showing distances to the
property lines from each corner of the proposed structure prepared by a licensed surveyor
and has tbe surveyors signature and professional stamp on the drawing? Slopes of 30%
or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan
for tbe placement of any portion of a structure within 50 ft. of a property line and not
within a previously surveyed building envelope on a subdivision final plat shall be
prepared by a licensed surveyor and have the surveyors signature and professional stamp
on the drawing. Any structure to be built within a building envelope of a lot shown on a
recorded subdivision plat, shall include a copy of the building envelope as it is shown on
the fin:zcat with the proposed structure located within the envelope.
Yes
2. Does tbe site plan when applicable include the location oftbe I.S.D.S. (Individual
Sewage Disposal System) and distances to the property lines, wells (on subject property
and adjacent properties), streams or water courses? This information must be certified by
a licensed surveyor with their signature and professional stamp on the design.
Yes No Not necessary for this project Nl'r
3. Does the site plan indicate the location and direction of the State, County or private road
access, the property?
Yes
4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a
Colorado Registered Engineer?
2
Yes __ _ No __ Not necessary for this project /
5. Are the plans submitted for application review construction drawings and not drawings
that are stamped or marked identifYing them as "Not for construction, for permit issuance
only", "Approval drawings only", "For permit issuance only" or similar language?
Yes 1/ No__ Not necessary for this project. __ _
6. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design~
Yes · No__ Not necessary for this project __
7. If the building is a pre-engineered structure, is there a stamped, signed engineered
foundatign plan for this building?
Yes_V_ No__ Not necessary for this project __
8. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth~........----
Yes__ No__ Not necessary for project~
9. Do the plans indicate the size and location of the ventilation openings for the attic, roof
10.
II.
joist spaces and soffits? . _ -~
Yes__ No__ Not necessary for this project_!IWF __
Do the plans include design loads as required under the IBC or IRC for roof
snowloads, (a minimum of 40 pounds per square foot in Garfield County)?
YesL No__ Not necessary for this project __
Do the
1
/s include design loads as required for floor loads under the IBC or IRC?
Yes No__ Not necessary for this project __
12. Does the plan include a building section drawing indicating foundation, wall, floor, and
roof constyJCtion?
Yes __ v_ No__ Not necessary for this project __
13. Is the wind speed and exposure design included in the plan?
Yes_L No__ Not necessary for this project __
14. Does the building section drawing include size and spacing of floor joists, wall studs,
ceiling joists, roof rafters or joists or trusses?
Yes2 No__ Not necessary for this project __
15. Does the building section drawing or other detail include the method of positive
connection of all columns and beams?
Yes_t,L. No__ Not necessary for this project __
3
16.
17.
18.
19.
20.
21.
22.
23.
24.
i 25. -,
Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or
the top La flat roof? (Check applicable zone district for building height maximum)
Yes No__ Not necessary for this project __
Does the plan include any stove or zero clearance fireplace planned for installation
including make and model and Colorado Phase II certifications or Phase II EPA
certification?
Yes __ No Not necessary for this project_L
Does the plan include a masonry fireplace including a fireplace section indicating design
to comply with the IBC or IRC?
Yes__ No__ Not necessary for this project~
Does the plan include a window schedule or other verification that egress/rescue
windows from sleeping rooms and/or basements comply with the requirements of the
IBC oriRC?
Yes __ No __ Not necessary for this project /
Does the plan include a window schedule or other verification that windows provide
natural light and ventilation for all habitable rooms? /
Yes__ No__ Not necessary for this project____!,(_
Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally
used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub
enclosureS)lnd specify safety glazing for these areas?
Yes __ /_ No__ Not necessary for this project __
Do the plans include a complete design for all mechanical systems planned for
installation in this building?
Yes__ No __ _ Not necessary for this project ./
Have all areas in the building been accurately identified for the intended use?
(Occupanry-as identified in the IBC Chapter 3)
Yes~ No__ Not necessary for this project. __ _
Does the plan indicate the quantity, form, use and storage of any hazardous materials that
may be in use in this building? /
Yes__ No__ Not necessary for this project __
Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan? ./
Yes__ No__ Not necessary for this project __
4
26. Do the plans indicate the location and dimension of restroom facilities and if more than
four employees and both sexes are employed, facilities for bo/es?
Yes__ No__ Not necessary for this project
27. Do the plans indicate that restrooms and access to the building are handicapped
accessible?
Yes__ No__ Not necessary for this project~
28. Have two (2) complete sets of construction drawings been submitted with the
applica/
Yes No ___
29. Have you designed or had this plan designed while considering building and other
cons~/n code requirements?
Yes No___ Not necessary for this project __
30. Does the plan accurately indicate what you intend to construct and what will receive a
final inspection by the Garfield County Building Department?
Yes~ No __
31. Do your plans comply with all zoning rules and regulations in the County related to your
zone district? For corner lots see supplemental section 5.05.03 in the Garfield County
Zoning Resolution for setbacks.
Yes~ No __ _
32. Do you understand that approval for design and/or construction changes are required
prior to the implementation of these changes?
Yes~ No ___
33. Do you understand that the Building Department will collect a "Plan Review" fee from
you at the time of application and that you will be required to pay the "Permit" fee as
well as any "Septic System" or "Road Impact" fees required, at the time you pick up your
building ;ermit?
Yes_\/_ No __
34. Are you aware that you are required to call for all inspections required under the IBC
including approval on a final inspection prior to receiving a Certificate of Occupancy
and oc;;yPancy of the building?
Yes___ No __ _
35. Are you aware that the Permit Application must be signed by the Owner or a written
authority be given for an Agent and that the party responsible for the project must
comply w)th the Uniform Codes?
Yes_L_ No __
5
36.
37.
38.
39.
40.
41.
42.
43.
Are you aware that you must call in for an inspection by 3:30 the business day
before the requested inspection in order to receive it the following business day?
Inspections will be made between 7:30a.m. and 3:30 p.m. Monday through Friday.
Inspections are to be called in to 384-5003. f~!.
Are you aware that requesting inspections on work that is not ready or riot accessible
will resu~in a $50.00 re-inspection fee?
Yes __ V_ No ___ _
Are you aware that prior to issuance of a building permit you are required to show proof
of a driveway access permit or obtain a statement from the Garfield County Road &
Bridge Department stating one is not necessary? You can contact the Road & Bridge
Departmf11t at 625-8601.
Yes ./ No ____ _
Do you understand that you will be required to hire a State of Colorado Licensed
Electrician and Plumber to perform installations and hookups? The license number will
be required at time of inspection.
Yes ~~ No _____ _
Are you aware, that on the front of the building permit application you will need to fill in
the Parcel/ Schedule Number for the lot you are applying for this permit on prior to
submittal of the building permit application? Your attention in this is appreciated.
Yes b~ No ______ _
Do you know that the local fire ~ict may require you to submit plans for their review
of fire safety issues? Yes No (Please check with the
building department about this requirement)
Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a
grading permit?
Yes /
Did an Architect seal the plans for your commercial project? State Law requires any
commercial project with occupancy of more than 10 persons as per Section 1004 of the
IBC to pref31!re the plans and specifications for the project.
Yes !L_ No Not Necessary for this project ____ __
I hereby acknowledge that I have read, understand, and answered these questions to
the best of my ability.
6
Date
Phone: '17v J<f 3-'fa, <{Jdays); 17 0 Jl-<{3-<ffo C( ::Z (evenings) •
Project Address:_2e:ec..::::..::e.::_-'~='.Lfe-'--,r-'i2"-'rt-"'a"-'n'--"------
Note:
If you answered "No" on any of these questions you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in
issuing the permit are to be expected. Work may not proceed without the issuance of the permit.
*If you have answered "Not necessary for this project" on any of the questions and it is
detennined by the Building Official that the information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, please expect the
following:
A. The application may be placed behind more recent applications for building permits in
the review process and not reviewed until required information has been provided and the
application rotates again to first position for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
*If you answered "No" to this question the circumstances described in the question could result
in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued.
Bpcomm
October 2006
7
May22, 2007
Garfield County Building Department
108 8th Street
Suite 401
Glenwood Springs, CO 81601
Subject: Authorization to Act as agent of WILLIAMS COMPANIES, INC.
Dear Sirs/Madams:
This letter authorizes Shawn). Wallace ofTPI Industrial, Inc. to act as an agent of
WILLIAMS COMPANIES, INC. for the specific purpose of making application to
Garfield County for building permits as follows:
• Clough compressor station
• Callahan compressor station
• Jangles compressor station
• Hayes compressor station
This authorization includes signing of these specific building permit applications on
behalf of Williams.
Please call if you have any questions.
Thank you,
Lee Harris
(970)216-0358 ~~
-!
PLAN REVIEW CHECKLIST
U II r.y\.t~t .
Applicant LA_;,\\ ,c.v-vV)_ ~ SodoDate :J -10-o']
Building Planning/Zoning
_bgineered Fo~ndation
V Driveway Permit f:X: •·s l
,/ Surveyed Site Plan q ~ ~ fratJJ>_'
~Septic Permit and Setbacks
#Grade!Topography 30%
~Attach Residential Plan Review List
~Minimum Application Questionnaire
· }LLL_subdivision Plat Notes
.u/.kFire Department Review
/Valuation Determination/Fees .
LRed Line Plans/Stamps/Sticker
pAttach Conditions
V Application Signed
\./'Plan Reviewer To Sign Application
dParce!/Schedule No. L~ ',J C, \ .Q
J42:'40# Snowload Letter-Manf. Hms.
-LL_ Soils Report
GENERAL NOTES
08/09/2007 05:15 9702577453 CRONK CONSTRUCTION PAGE 01
1129 ·24· Road CRONK
CONSTRUCTION
INCORPORATED
• Grand Junction, CO 81505
970•245·0577, 970·257·7453 (fax)
August 9, 2007
CERTIFICATE OF INSPECTION AND ACCEPTANCE
Regarding: Engineered Foundation
For: Williams Production
Callahan Station
Parachute, CO
Contractor: Fowler Concrete Construction inc.
785·1 /2 -22-Road
Grand Junction, CO 81505
970-640-51 16
The foundation of reference was inspected and was found to conform with the plans and
specification set forth in the engineered foundation plan for the aforementioned property prepared
on June 23, 2007. Copies of the engineered plan may be obtained from the undersigned design
engineer.
INSPECTION LOG
Item
footing pads
grade beam
Date
07/24/07
08/01/07
-rl~J (}f7
Thomas A. Cronk, P.E.
1129 -24-Road
Grand Junction, CO 81505
970-245-0577
June 26, 2008
' TPI Industrial
CRONK
CONSTRUCTION
INCORPORATED
2471 River Road, Unit A
Grand Junction, CO 81505
970-243-4642 (wk), 970-242-5330 (fax)
• 1129 ·24· Road
Grand Junction, CO 81505
970·245·0577, 970·257·7453 (fax)
Concerning: erection of steel structure for Callahan Station, Parachute, CO 81635
The erection of the steel structure at the above referenced project was inspected by CCI Engineering on
06/01/08 .. The structure has been erected in accordance with the structural steel plans furnished by the
manufacturer.
Please call if you have additional questions concerning this issue. Thank you .
. '
.... ··,..-..
SEAL
Thomas A. Cronk, Colorado License No. 28322
Date b<e>,;, J
PAGE 1 OF 1
. '.! ---·-__ j.L
No. !031-5 Assessor's Parcel No. ~J>l·{o:l -Q~ -OJ-\t{)$'
~ Date '8 -b~o+
BUILDING PERMIT CARD ~. 'f>\d~of fd .
. o.z.. ~\k.5 C'JO~;) rre~ t ® ?'~ V.:U~ Tb sib
')JJ\UlliMS \)JQ?l.U\A~V\ I ~MEI,\.Ct.lV\ -,.octq Address 10~ cr ~ tS flc,nul&>hone # 2,f>~-Cf~R
--
•',.. t•~MNYI''""Y Address ~4tl EWR(id Q. 6-S Phone #2.43-464~
Setbacks: Front Rear RH LH Zoning ____ _
Qo\\nbfrol OftS (Dfn~~'SC.r ~\uct INSPECTIONS
SoilsTest ?? • ~
Footing --"~"'-""~'W"'~""""l::-----":F?F"'---
Foundation Pkh
Grout __________ ~---------------
Underground Plumbing--------
Roug.h Pl~a ~-~ Fram1ng~reeA#:~ti 7~
Insulation 7
Roofing---------------
Drywall ----------------
Gas Piping----------------
NOTES
Weatherproofing __________ _
Mechanical ____________ _
Electrical Rough (State) '"/t-o ~ ..
Electr~al Final (State>---------;~
Final '(-3-o?t /Checklist Comgleted? /)iV;-
Certificate Occupancy # _,J5'-F--Lq-'=s--'l,.,.-~---
Date ) () W rfiC. 7 · ?f· Df
Septic System# __________ _
Date ------------Final ___________ _
Other---------------
(continue on back)
INSPECTION WIU. NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued •• !~ .... Zoned Area ............................... Permit No.JQ.~.T~ ....... .
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit·may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID.
Use Gt,;:, <X>'fAt>re.'b'IDC-{cnV.c¢,fon Cl'IVV\~'bl!Qr 'cltl8)
Address or Legal Description•-;-------:-:-;=or------==------
Owner P.vnenrtlll'\ fulCAjuliUlri!M.'> \)fW.ll~ctor--r€\ lWU~\xlt>.L
Setbacks Front Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing z;:,~. Driveway
Foundation ).,eiftr V,. ::}r:L.
Underground Plumbing Insulation
Rough Plumbing Drywall
Chimney & Vent Electric Fioal (by Stare lnspectorfi?t, §ec..
Gas Piping Final 7-.5-e€ EM
Electric Rough (By State Inspector) Septic Final -n--
Framing~ :R,t Notes:
(To include R of in place and Win ws
and Doors installed).
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING-
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
For Inspections Call384-5003 108 8th Street Glenwood Springs, Colorado
APPROVED DO NOT DESTROY THIS CARD
Date 8-6-ol By Fe
IF PLACED UTSIDE • COVER WITH CLEAR PLASTIC
RIGHT-OF-WAY AND EASEMENT LEASE
AGREEMENT
!CALLAHAN COMPRESSOR FACILITY
STATE OF COLORADO
COUNTY OF GARFIELD
KNOW ALL MEN BY THESE PRESENTS, that Solvay Chemical Inc., a
Delaware corporation ( hereinafter referred to as "Grantor"), 2717 County Road
215, Parachute, CO 81635, for and in consideration of the sum of TEN
DOLLARS AND OTHER VALUABLE CONSIDERATION to the Grantor in hand
paid by Williams Production RMT Company, a Delaware corporation (hereinafter
referred to as "Grantee"), 1069 County Road 215, Parachute, CO 81635, does
hereby grant and convey, without warranty of title, either expressed or implied, to
said Grantee, its successors and assigns, an easement to locate, survey and
resurvey, construct, entrench, replace, maintain and operate a natural gas
compressor station with appurtenances thereto, (said compressor station and
appurtenances, being hereinafter sometimes called the "Facilities") in the SE '4
NE '4 of Section 3, Township 7 South, Range 96 West of the 6 1" Principal
Meridian, Garfield County, Colorado, being more particularly described as
follows:
Beginning at the Southeasterly corner of the Callahan compressor site, whence
a found 1920 GLO Brass Cap in place for theE% corner of said Section 3 bears
S 47°34'30" E a distance of 660.15 feet; thence N 14°18'14" W a distance of
200.00 feet; thence S 75°41' 46" W a distance of 431.23 feet to an existing
20" natural gas pipeline; thence S 47°34'30" E a distance of 260.54 feet along
said pipeline to the Northerly edge of an existing access road; thence along the
Northerly edge of said access road the following four courses: S 83°16'36" E a
distance of 47.63 feet; thence N 73°09'52" E a distance of 85.85 feet; thence N
61°01'41" E a distance of 122.63 feet; thence N 75°41'46" E a distance of 39.24
feet to the point of beginning, containing 1.82 acres, more or less. This is for the
sole purpose of installing and operating a natural gas compressor station
designated by survey heretofore made by Grantee, hereinafter described as
Exhibit "A" attached hereto. Upon completion of construction, Grantee shall
furnish Grantor a reasonable as-built survey description of the facilities.
Grantee shall be responsible for obtaining any and all permits required by
local, county, state or federal agencies prior to commencement of construction.
Prior to construction, Grantee shall pay ro Grantor additional consideration
in the amount of fifteen hundred dollars ($1500.00) as payment for the first
partial year of the Lease Agreement and fifteen hundred dollars ($1500.00)
annually, commencing January 1, 2006, due and payable by January 30 of each
calendar year for the continued life of the Lease.
Grantee shall notify Grantor at least fifteen (15) days prior to commencing
or allowing any construction within the specified 1.89 acre easement.
All ingress and egress to and from, and access on and along said Right-of-
Way will be coordinated between the Grantee and the Grantor. Grantee shall
conduct the construction, inspection, repairs and maintenance in a manner that
will cause the least practicable damage and inconvenience to Grantor.
Subject to termination as provided herein, the rights and obligations shall
be continuous. Should Grantee or its successors and permitted assigns fail to
use the Facilities for the compression of natural gas for any continuous period of C
twenty-four months, the rights granted herein to Grantee shall terminate.
Grantee may, at any time or from time to time, remove Facilities and Upon
permanent abandonment or termination as provided herein, shall execute and
' --:-!
record a re-conveyance and release. Upon termination Grantee shall restore
and reclaim all land included within the Easement affected by Grantee's activities
to its equivalent prior condition. Such restoration and reclamation shall include,
but not be lirn\ted to, the removal of Facilities located on the surface of the
ground.
If in the sole opinion of Grantor such Easement, including any Facilities, or
the operations of the Grantee thereon, interferes with any present or reasonably
near-term operations of Grantor or any related company, Grantee agrees to
relocate such Easement including any related Facilities to a location on nearby
lands of Grantor mutually agreeable to Grantee and Grantor. Grantee retains
the right to relocate to other lands not owned by Grantor. If such Easement is
relocated to lands owned by Grantor then such easement shall exist under the
same terms as this agreement. Any relocation to other lands of the Grantor shall
be completed within 180 days of agreement of a mutually acceptable alternate.
location, or if Grantee elects to relocate to lands not owned by Grantor, within
180 days of such election. Grantee shall have sixty (60) days from such request
of Grantor to make such election. After such relocation, Grantee shall as soon
as practicable restore the Easement lands to their condition existing prior to
construction of the easement, according to law and the further terms of this
agreement. Grantee will provide Grantor at the completion of relocation and end
of Grantee's ~se, a release of that portion of the lands previously occupied and
used by Grantee, but not used by Grantee after such relocation. All relocation
shall be at the sole risk, cost and expense of Grantee.
Grantor reserves the right for itself, its assigns, and subsequent grantees to
the use of enjoyment of said Right-of-Way, Easements and Facilities, provided
such use shall not unreasonably interfere with Grantee's rights hereunder,
including the right to have Grantor's or its assigns' facilities across/through the
Easement in such a manner which shall not unreasonably interfere with
Grantee's then existing use of its Easement. No such facility shall cross
Grantee's Easement without Grantee's prior consent, which shall not be
unreasonably withheld. Grantor shall notify Grantee at least thirty (30) days prior
to commencing or allowing construction of any such crossing which Grantor
proposes to install or construct and shall be entitled to install or construct such
crossing unless Grantee, within ten (10) days after receipt of such notice,
specifies a reasonable alternative depth or route, in which case the Grantor, shall
use the alternative depth or route so specified. Grantee's silence shall be
deemed consent.
Whether or not taxes, assessments or public charges are separately
assessed against Grantee, it shall pay taxes, assessments or public charges
levied or imposed upon its Right-of-Way and Easement or upon other personal
property, improvements or fixtures owned or placed by it within the Right-of-Way
and Easement subject to its right to contest same, provided that in no event shall
Grantee permit its Right-of-Way and Easement to be sold for tax purposes. In
the event said taxes, assessments or public charges are not separately
assessed, then promptly following written notice from Grantor, Grantee shall
reimburse Grantor for any taxes, assessments or public charges attributable to
its Right-of-Way and Easement.
Grantee shall keep its Right-of-Way and Easement free and clear of all
liens or encumbrances at all times, subject to its right to contest same, provided,
however, that the lien and encumbrance of Grantee's general mortgage and
indenture shall not be affected by this provision, if said mortgage is subordinated
to Grantee's obligation under this Right-of-Way and Easement.
Grantee shall have the non-exclusive right to mark the location of its
Right-of-Way and Easement by suitable markers set on the ground.
2
Grantee. shall construct, operate, and maintain its Easement in a safe,
clean, lawful ~nd workmanlike·· manner and in accordance with accepted industry
standards including, but not limited to, the following:
I
a. No private vehicles will be allowed on Solvay property.
b. Laydown areas will be subject to Solvay approval and will be within
Construction Easement as much as possible.
c. No new roads are to be constructed. Current roads will be maintained
and cleaned up, before and after construction, to Grantor's satisfaction.
d. All applicable permits must be obtained by Grantee in a timely
fashion.
e. Following any such construction, Grantee shall rehabilitate the
Easement lands. Except for that area where easement encroaches on
irrigated fields, rehabilitation instructions will be as follows: The slopes
shall be graded back to be stable and fertilized, seeded and mulched foi
revegetation. On the overall easement a seed mixture shall be as listed,
fertilized as listed and some areas of critical concern shall require
mulchi~g.
Seed Mixture Required Per Acre:
Species
Western Wheatgrass
Basin Wild rye
Sideoats
Alkali Sacaton
Fertilizer Required Per Acre:
250 bulk pounds 46-0-0
Origin
Rosana
Magnar
Vaughn
Pounds Pure Live
Seed per Acre
4.0
2.0
2.0
1.0
Irrigated fields will be reseeded to rnatch existing established crops.
Any agricultural lessee of affected property shall be reimbursed for actual
loss of production due to construction or operations.
f. Grantee agrees to obtain and maintain insurance acceptable to
Grantor which is primary to any other insurance or self~insurance and
which narnes Grantor as additional insured with respect to liability arising
out of Grantee's performance hereunder and includes a Severability of
Interest Clause (Cross Liability) which Additional Insured Endorsement
shall not exclude or restrict coverage based upon the alleged or actual
negligence of the Additional Insured. Such insurance shall at a minimum
include:
1. Commercial General Liability Insurance Form or the equivalent with the
Amendment Aggregate Limits of Insurance Endorsement CG25031185
covering Grantee's contingent liability, Premises Operations, Completed
Operations and Products Liability, Contractual Liability, and if requested
by the Company, liability arising from explosion, collapse, or underground
property damage, all with a minimum combined single limit of $1,000,000
each occurrence, $2,000,000 Aggregate for Bodily Injury and Property
Damage including personal injury.
2. Comprehensive Automobile Liability Insurance or Business Auto Policy
covering all owned, hired, or otherwise operated non~owned vehicles with
a minimum combined single limit of $500,000 each occurrence for Bodily
Injury and Property Damage.
3
3. Workers Compensation insurance as required by law, covering all states
of operation, and Employers Liability Insurance with a minimum of
$1 ,000,000 each occurrence.
I
Grantor reserves the right to change its minimum insurance requirements.
Before commencement of construction, Grantee shall furnish Grantor with
Policies or Certificates of Insurance acceptable to Grantor confirming
compliance herewith and providing that no coverage will be canceled or
materially changed prior to 30 days advance written notice to Grantor.
Subrogation against Grantor shall be waived as respects all of the
insurance policies set f<;>rth above (Including but not limited to policies of
any subcontractor). An Alternate Employer Endorsement may be
substituted for the Additional insured Endorsement only with respect to
Workers Compensation Insurance and Employer's Liability insurance.
The insurance required hereunder in no way limits or restricts Grantee's
obligations under the "Indemnity" section below. Further such insurance
shall be in no way limited by any limitation expressed in the "Indemnity"
section below, nor any limitation placed on the indemnity therein given as
a matter of law. No deductible or self-insurance is permitted without
written approval of Grantor.
g. Gr~ntee agrees to release, protect, defend, indemnify, and hold
Grantor, its parent, its subsidiary and/or affiliate companies, and the
respective employees, officers, directors, or agents thereof, free and
harmless from and against any and all claims, liability, demands, and
causes of action of all kinds, including but not limited to claims of damage
to or loss of property of Grantor or others, illness or death (herein after
"Claims") arising out of Grantee's performance hereunder, whether
Grantor is negligent, actively, passively, or not at all, or Grantor is alleged
or proven to be absolutely or strictly liable or to have breached any duty or
warranty (express or implied) except to the extent such Claims are shown
by final judgment to have been caused by the sole active negligence or
willful misconduct of Grantor. The insurance requirements herein shall
not be construed to limit this indemnity. it shall be effective to the
maximum extent permitted by applicable law. Grantee shall be solely
responsible for the defense of any and all Claims hereunder including, but
not limited to, Claims by any employee of Grantee or any employee of
Grantee's subcontractor alleging the willful misconduct or sole active
negligence of Grantor. The parties agree that should any court of
competent jurisdiction determine that the Indemnity required herein
exceeds, in extent, scope or amount that which is permitted by applicable
law, such indemnity shall be construed, interpreted, and enforced so as to
preserve the maximum indemnity which is permitted thereby.
Notices under this Agreement made by one party to the other in writing by
properly addressing and placing such notice postage prepaid in the United
States mails, by telegram, by telex, or by delivery in person to the following
addresses:
TO GRANTOR:
Solvay Chemical Inc.
2717 County Road 215
Parachute, GO 81635
Fax: (970) 285-6393
TO GRANTEE:
Williams Production RMT Company
1089 County Road 215
Parachute, Colorado 81635
Fax: (970) 285-9573
4
A notice,given under any provision hereof shall be deemed given only when
received by the Party to whom such notice is directed, except that any notice
given by Unit~d States registered or certified mail or by telegraph properly
addressed to the Party to whom given, with all postage and charges prepaid,
shall be deemed given to and received by the Party to whom directed
seventy-two (72) hours after such notice is filed with an operating telegraph
company for immediate transmission by telegraph.
The address of each Party as set forth shall be deemed its proper address
until ten (1 0) days after the other party's receipt of notice of the giving party's
new address.
This Right-of-Way and Easement shall be governed by and construed in
accordance with the laws of the State of Colorado.
The covenants contained in this Right-of-Way and Easement shall survive
any assignment, surrender or termi'nation of the Right-of-Way and Easement,
and this Right-of-Way and Easement shall be binding upon the successors and
permitted assigns of both parties hereto.
This Rig[lt-of-Way and Easement and the rights hereunder shall not be
assigned by Grantee without the prior written approval of the Grantor, which
approval shall not be unreasonably withheld.
The failure of either party to insist on strict performance of any of the
Rights-of-Way and Easements, covenants, terms and conditions hereof shall not
be deemed a waiver of any rights or remedies that such party may have for any
subsequent breach, default or nonpertormance.
5
' Executed on the dates shown in the acknowledgments, but effective for all
purposes as c1f February 25, 2005.
~(_ By: /;;Z.tf!t~/-. Solvay Chem~icals Inc.
Va olotoochin
Its: Director of Environmental and
Diversified Products
Williams Production RMT Company
By: ~~A~~bk
Its: District Manager
6
Acknowledgment page for that Right-of-Way and Easement Agreement with
effective date ,of February 25, 2005:
COUNTY OF GARFIELD
ss.
STATE OF COLORADO
II ,. tV! .tl I
Before me, on this oU day of -"'n'fp!.JrL.,l..l '----• 2005, the foregoing
instrument was executed by ___ _,V.,a"-'1 z,o.,lo"'t"'o"oc"'h.,in"------------
known to me to be the duly authorized Director of Environmental and
Diversified Products of Solvay Chemical Inc., Grantor, and acknowledged
said execution to be the signer's free and voluntary act and deed on behalf of
said Grantor, for the uses and purposes ·therein set forth.
Witness my hand and official seal.
ifkvezd£; ;;(j;ffiJcM
Notary Public
COUNTY OF GARFIELD
STATE OF COLORADO
ss.
"' ",1-1\ . I Before me, on this<)(,\-,: day of__:_11-4'f>'-'\2..""'-' L---' 2005, the foregoing
instrument was executed by ___ _,S"'te'"v"e'-'J"-. .,S,oxvc"'h"a"'k~--------
known to me to be the duly authorized District Manager of
Williams Production RMT Co., Grantee, and acknowledged said execution to be
the signer's free and voluntary act and deed on behalf of said Grantee, for the
uses and purposes therein set forth.
Witness my hand and official seal.
My commission expires:
7
ExHI61T "A"
F"ROPOt:;I!C ll>I!CTION ~ COMF"RIE€>1>010! t?;ITI! ._iN
AMERICAN ll>OCA F"FO!OF"iiRTY
Jched hereto and made a port hereof that certain Right-Of-Way Grant doted the
,---' ? __ th day of t::d?~r3-• 20o£'trom American Soda, LLP to Williams :reduction RMT
SECTION 3
COMPRESSOR SITE
1.82 oc.
N75'41'46"E
39.24'
P.O.B. -------ot>-0 ...----ss~ --_-. ,._cc£ --0.\S~~---
1-.
_?"nE: S16"39'10"E-860.15' TO
-
\
THE £1/4 COR SEC 3, 1920 GLO
BRASS CAP
----------/--------
/ /-----
/
® GM #42-3
>MPRESSOR SITE LEGAL DESCRIPTION:
parcel of land, for· the construction and molntonace of a compressor slotlon, situated In the SE1/4 N£1/4 of
1ctlon 3, Township 7 South, Range 96 West of tho 6th P.M., Garfield County, Colorado, being more portlculorly
1scdbed os follows:
'Qfnn!ng ot the southeasterly corner of the compressor site, when<::<~ the El/4 corner of sold Section 3 bears
16'39'10" E a distance of 860.15 feel; thence N 14'18'14" W o distance of 200.00 feet; tl"lence
75'4-1'46" W o distance of 4-31.23 feet to on existing 20·~ natural gas pipeline; thence S 4-7'34'30~ E a
stance of 260.54 feet along sold pipeline tq an access rood; thence along the said access rood the following
>ur courseg: S 83"18'38" E a distance of 47.63 feet; thence N 73'09'52~ E a distance of 85.85 feet; thence N
\'01'41" E a distance of 103.82 feet; thence N 75'41'46" E a distance 39.24 feet to the point of beginning,
mta!n!ng 1.62 acres, more or less.
CONE>TRUCTION ll>URViiYt?;, INC.
<ZI<ZII2 ll>UNFO!IIl>IE 6L.VC.
Willi~
~~
1058 COUNTY ROAD 215
PARACHUTE, COLORADO, 81635 I> II.. T, CO 81~1;2
('ill1<ZIJ81~-!;1&3 SCALE: 1" "" 100' DATE: 09/21/04
Parcel Detail Page I of 5
Garfield County Assessor/Treasurer
Parcel Detail Information
AsSS<S$91:/IreilSl!BlrPmpertY.Sear>eh I Assessor Subse.LQuery I Assess91:.Sales Search
Clerk& Remr4eLRe>eePtioiJ Sear<::h
Parcel Detail I V alu_e Detail Sales Detail I Residential/Commercial_ Improvement Detail
Land Detail I PJ1o1Qgraphs
I Tax Area II -Account Number II Parcel Number II Mill Levy I
I 026 II R005391 II 240902200148 II 36.682 I
Owner Name and Mailing Address
jAMERICAN SODA, LLP I
jc/0 ITM SERVICES I
jPO BOX 672346 I
jHOUSTON, TX 77267-2346 I
Legal Description
jsECT,TWN,RN0:2-7-96 DESC: A TR IN I
-jSECS 34 & 35 OFT 6 S ROE 96 W & I
jSECS 1-3OFT 7 S ROE 96 W CONT I
j998.98 AC. EXCEPT THE ROW FOR CORD I
1215 AS DESC IN 657/419, I
j658/762,702/411-435,714/01-13.
jEXCEPT A TR OF LAND CONT. 45.28 AC.
jAS DESC IN BK 1187 PO 176. EXCEPT
jA TR OF LAND CONT 66.49 AC AS DESC
jiN BK 1876/353 PRE:R260370
jPRE:R260092 AND/THRU:T TO:R260054
jPRE:R260337 AND/THRU:& TO:R260345 I
jsUC:R043840 BK:1130 P0:972 I
jRECPT:545908 BK:l130 P0:971 I
jRECPT:545908 BK: 1130 P0:970 I
http://www~garcoact.com/assessor/parcel.asp?Parce!Number=240902200148 7/5/2007
Parcel Detail Page 2 of 5
/RECPT:545908 BK: 1130 PG:969 I
IRECPT:545908 BK:0641 PG:0759 I
IBK:0640 PG:0131 BK:0630 PG:0883 I
/BK:0377 PG:0106 BK:0355 PG:0266 I
IBK:0326 PG:0220 BK:0275 PG:0001
IBK:0268 PG:0119 BK:0134 PG:0098
IBK:1763 PG:707 RECPT:690412 BK:1754
IPG:451 RECPT:688248 BK:1749 PG:859
IRECPT:687237 BK:1749 PG:854 I
IRECPT:687236 BK: 1737 PG:698 I
/RECPT:684756 BK: 1721 PG:239 I
IRECPT:681164 BK:1706 PG:861 I
IRECPT:678265 BK:1694 PG:204 I
/RECPT:675714 BK: 1663 PG:206 I
IRECPT:668724 BK:1663 PG:200 I
IRECPT:668723 BK:1607 PG:742 I
IRECPT:656645 BK: 1602 PG:397 I
/RECPT:655356 BK:1587 PG:440 I
/RECPT:652080 BK: 1577 PG:313 I
IRECPT:650061 BK:1556 PG:828 I
IRECPT:645428 BK:1526 PG:227 I
IRECPT:638027 BK:1515 PG:151 I
IRECPT:635788 BK:1515 PG:145 I
IRECPT:635787 BK:1462 PG:657 I
IRECPT:626049 BK:l351 PG:551 I
IRECPT:602574 BK:1351 PG:548 I
IRECPT:602573 BK:l333 PG:754 I
/RECPT:598256 BK:1209 PG:429 I
IRECPT:569904 BK:1209 PG:419 I
IRECPT:569903 BK:l203 PG:391 I
IRECPT:568109 BK:1203 PG:381 I
/RECPT:568108 BK:l187 PG:176 I
IRECPT:563403 BK: 1129 PG:50 I
/RECPT:545331 BK:0846 PG:0952 I
/BK:0682 PG:0294 I
Location
http://www. garcoact.cornl assessor/parcel.asp ?Parce!N umber=240902200 148 7/5/2007
Parcel Detail Page 3 of 5
I Physical Address: 112717 215 COUNTY RD PARACHUTEj
I Subdivision: I
I Land Acres: 11928.17 I
I Land Sq Ft: Jio
I Section II Township II Range I
2 II 7 II 96 I
Property Tax Valuation Information
II Actual Value II Assessed Value I
I Land: II 1,571,82011 455,8401
I Imerovements: II 4,546,77011 1,318,5601
I Total: II 6,118,59011 1,774,4001
Sale Date: 1!4125/2002
Sale Price: IJ2o,ooo
Basic Building Characteristics
Number of Residential
lo I Buildings:
Number of Comm!Ind
114 I Buildings:
I Commercial/Industrial Building Occurrence 1 Characteristics I
I TOTAL HEATED AREA: 115,746 I
I
ABSTRACT CODE·IIMANUFCTRNG/PROCESNG-• IMPS I
I ARCHITECTURAL STYLE: lloFFICE I
I EXTERIOR WALL: IIcoN BLOCK I
I ROOF COVER: IIBUILT-UP I
I ROOF STRUCTURE: IJsTEEL FRAM I
I INTERIOR WALL: IIDRYWALL I
I FLOOR: IJsHT VINYL I
I HEATING FUEL: IlGAS I
I HEATING TYPE: IIFORCED AIR I
STORIES: JSTORIES 1.0 I
BATHS: 2
http://www. garcoact.com/ assessor /parcel. asp ?ParcelN umber=240902200 148 7/5/2007
Parcel Detail
UNITS: I
YEARBUILT: J1982
Tax Information
I Tax Year II Transaction Type II Amount I
2006 II Tax Payment: Second Half I ($32,126.10)
2006 II Tax Payment: First Half ($32, 126.1 0)
2006 II Tax Amount $64,252.201
2005 II Tax Payment: Second Half ($32, 190.90)1
2005 II Tax Payment: First Half I ($32,190.90)1
2005 II Tax Amount II $64,381.801
2004 II Tax Payment: Second Half II ($37,518.75)1
2004 II Tax Payment: First Half II ($37,518.75)1
2004 II Tax Amount II $75,037.501
2003 Tax Payment: Whole II ($109,897.52)1
2003 Tax Abatement I ($1 05,591.26)1
2003 Tax Amount $215,488.781
2002 Interest Charge $16,394.411
2002 Tax Payment: Whole ($409,860.24)1
I 2002 Interest Payment II ($16,394.41)1
I 2002 I Tax Amount II $409,860.241
I 2001 Tax Payment: Whole II ($437,197.90)1
I 2001 Tax Amount II $437,197.901
I 2000 Tax Payment: Whole II ($429,485.26)1
I 2000 I Tax Amount II $429,485.261
I 1999 II Tax Payment: Whole II ($24,262.86)1
I 1999 II Tax Amount II $24,262.861
Top .. ot'P<!ge
Assessor Database Se<Arch.Qpjjons I Treasurer.D.i!t<J.base Search Options
Clerk & Record<'<LDatabase Search OptioJJ.li
Qm'fie!d .. CmJntyHomePAge
Page 4 of5
The Garfield County Assessor and Treasurer's Offices make every effort to collect and maintain
accurate data. However, Good Turns Software and the Garfield County Assessor and Treasurer's Offices
http://www. garcoact.corn/ assessor/parcel. asp ?Parce!N umber=240902200 148 7/5/2007