Loading...
HomeMy WebLinkAboutApplicationG[fxy- held �'o u i -z 02 108 8" Street, Suite 40!, Glenwood Springs, CO 81601 Ph: 970-945-8212 F.r.•970-384-3440 Inspection Line.888-868-5306 www.garfield-county.com BUILDING PERMIT APPLICATION _ 1 Parcel No: (thisin oratation is available at the assessors office 970-945-9134) 41 3 —3a4/0a-0 ' Lot No: Block No: Subd./ Exemption: 2 Job Address: lien adt .ss has not been assigned ease prof e CR• 11H) c r $rreee1 Wane t • Cyfy))r and legal description 3 Owner: (properly owner) r'j-4c is C'h,r;S FinleYS Mailing Address: 0772 cAny0n Crect4Or- 1W S Ph: 976 -9"z8 -973y.4 Alt Ph: Contra or: + l j real h Cte. kay.ct. Mailing Address: (3768 Ca.ny on (Areegar- 61/4-0S Ph: 970-37' -W65 5- Alt Ph: 5 Manufactured home installer: Mailing Address: Ph: Lic ii: 6 Architect:( Mailing Address: Ph: Alt Ph: 7 Engineer; (tik Mailing Address: Ph: Alt Ph: 8 Sq. Ft. of Building:Sq. 67G Fl. Ft. or Acres of Lot: Height: tat -a" No. of Floors: cYte 9 Use of Building: L8'Residential ❑Commercial DOther Class of Work: ❑New DAlteration DAddition DRepair ❑Demo DMove 10 Describe Work: �.r e t: , eac1 ;err I I Garage: ®"Attached ❑Detached S tic: ❑ISD5 ❑Community Type of Heat: ❑Nat. Gas ❑Propane ❑Electric ❑Other 12 Driveway Permit: Owners valuation of Work: -� 1) CP C.)0 NOTICE :Authority. This application fora Building Permit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must he provided with this Application. Legal Access, A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Department. Other Permits. Multiple separate permits may be required: (I) State Electrical Permit, (2) County ISDS Permit, (3) another permit required for use on the property identified above. e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned fora period of 180 I hereby certify and specifications Assuming completeness the submittals in consideration Code, ISDS construction 1 hereby grant Building Official of County Regulation(s) Review of this or discrepancies. limitation my I HEREBY days after commencement. CERTIFICATION that I have read this Application and that the information contained above is true and correct. I understand that the Building Department accepts the Application. along with the plans and other data submined by me or on my behalf (submittals), based upon my certification as to accuracy. of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on reviewed by the Building Department. of the issuance of the Building Permit, 1 agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building regulations and applicable land use regulations (County Regulation(s)). 1 acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location. or use of the structure(s) and facility(ies), described above. are not in compliance with County Regulation(s) or any other applicable law. permission to the Building Department to enter the property, described above, to inspect the work. 1 further acknowledge that the issuance of the Building Permit does not prevent the from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance: or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation or any other applicable law. Application, including submittals, and inspections of the work by the Building Department do not constitute an acceptance of responsibility or liability by the County of errors, omissions As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without architect designer, engit 'cr tnd) or builder. CKNOWLEDGE T ss I. • + UNDERSTAND THE NOTICE & CERTIFICATION ABOVE: w RS SIGNATURE DATE/' - 3P 1(}-A '1 1..-85- — b 3 •13 STAFF USE ONLY Special Conditions: Adjusted Valuation: 15;5-69;06 Plan Check Fee: /72.41 / Permit Fee: 2,65. if Manu home Fee: Mise Fees: ----_ ------ Total Total��FFjeess:: �^ '3 Z 6 Fees Paid: f v .5 i Balance Due: 3s/7. ! f BP BPP1/�N}to��& Issue Da�tee�: ISDS No & Issued Date: I/! - Rl` f/-r#/)i' Setbacks:? C F25, e 1 d, 5 77 OCC Croup ,., 0 c 1 Const Type: ,i Zoning: u f) foG D . li�i /04 �'!� P DE d /iwA /71,9/1.z-- AP OVALRDATE APPROVAL DATE Building Plan Review Description of Work: Garage & Carport addition Bin #: Location Address: 772 CANYON CREEK DR GLENWOOD SPRINGS, CO 81601 General Information Contacts Case Manager: David Bartholomew Plan Case Number: BLDG -10-12-7407 Parcel: 212325324020 Application Date: 10/11/2012 Owner: Stephen & Christine Ehlers Applicant: Stephen & Christine Ehlers Applicant Phone: (970)928-9734 Email: N/A 1A Building Engineered Foundation Driveway Permit Surveyed Site Plan Septic Permit and Setbacks Grade/Topography 30% Attach Residential Plan Review List Minimum Application Questionnare NjA Subdivision Plat Notes Fire Department Review Valuation Determination/Fees Red Line PlanslStampslSticker Attach Conditions N,'4 N1' Application Signed Plan Reviewer To Sign Application Parcel/Schedule No. 40# Snowload Letter - Manu. Homes Soils Report Planning/Zoning ` Property Line Setbacks 30ft Stream Setbacks ` Flood Plain / Building height Toning Sign -off Road Impact Fees HOA/DRC Approval Grade/Topography 40% f Planning Issues Subdivision Plat General Comments: Tuesday, October 16, 2012 Vf44-40ii /3 5-6Y, 00 deemed cee z 65: z5- ,7 -//z- 5Ti1Z 4( 7 ''f Pal - 9-b. 5"./ Applicant: Job Address: Subd- Lot/block: FEE ESTIMATE FOR S/F STICK BUILT HOMES (ALL FEES ARE ESTIMATES UNTIL FINAL PLANS ARE REVIEWED) AV FINISHED LIVING SPACE: sf X 74.68= UNFINISHED BASEMENT: sf X 41.00= CRAWL SPACE: sf X 9.00= GARAGE: /.-Y z6 ' 490 sf X 18.00= ° . i UNCOVERED PATIO/DECK: sfX12.00= 11,680�� COVERED PATIO/DECK: sf X 24.00= MISC: CAeperrf /(P)( 0.3 ` 3Z2- 475 X 7 }Z.too 8611 MISC: TOTAL VALUATION: THIS SECTION WILL BE DETERMEND BY GARFIELD COUNTY BUILDING & PLANNING PLAN REVIEW FEE: PERMIT FEE: TOTAL: SEPTIC= PERMIT: PERC: NOTE: If any required information is missing, delays in issuing the permit are to be expected. If determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The building department will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Septic or Road Impact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand, and will abide by the requirements of this checklist. Signature of Owner Date Garfield County Building & Planning 108 8th Street, Suite 401 Glenwood Springs, CO 81601 Phone: 970-945-8212 Fax: 970-384-3470 www.garfield-county.com