Loading...
HomeMy WebLinkAboutApplication-PermitGarfield County No. lObt-Y Building & Sanitation Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Office 945-8212 Inspection Line 384-5003 Job Address: 4389 cr 215, Parachute Locality: _________ __::2:..:1..:..7=-1-.::::33:.:2:_-0::..:0:_-0::..:1:.:::9 _____ -,--___ _ Use of Building: MCC metal bldg 2 (williams train3) Owner: Williams production RMT company Contractor: TPI Industrial Inc · ----------------~~~~~~--------------- Amount of Permit: $1,658.17 \ObtLl No. --~~~~------- Date: \ ()-IJ{h{)t Clerk: -d t\i\t\oJ Assessor's Parcel No. d,\1\-3'3d.-CD-c> \C\ Date }()-()~-Qi- I!III.JII.DINO PERMIT CARD Job Address 4"5bC! Cf" ~\S-·'P\'\t\Vle Owner h)\\\1(1/!MS tJXOOt.tllOit\ {<VVI-1- ContractorWI lV\~Uffi \Cll \'I\<: Address l !)'3? Cf ~ \ ":>-~hv\e Address.d,l-{1\ t\U!:'flc\ -G·'S'. Phone # ib'l:5-q'\S)--,_ Phone # »,LP.>-Lj(,l-[1\ ~Se~t~ba~c4kf{,s:~~Ero~r~ntf=:Jk'!l1\ii\r Rear RH ____ LH ____ Zoning ___ _ T\}l \\'tltbtl ttil \:1'1 \lJI!ioW\Stl'OIV\:":S INSPECTIONS HCS:. ~ B\dt\2.. Soils Test • Footing &w...de 6iA1t1"" ~""" Foundation f-/8-t;fr&w-- Grout-------------- Underground Plumbing ______ _ Rough Plumbing _______ _ Framing _____________ _ Insulation------------ Roofing----------------- Drywall ---------------Gas Piping __ __:__ __________ _ Weatherproofing _______________ _ Mechanical _____________ _ Electrical Rough (State) _______ _ Electrical Final (State) ________ _ ~Final :J-9-/() /Checklist comp[eted? __ _ -"{/' Certificate Occupancy# ~(Q~L/Llo(,Qj""-!-l ____ _ Date 2.. · 2..2. IV Septic System# _____________ _ Date-------------Final ____________ _ Other -------------------- NOTES (continue on back) D t " W r'llr'ctMs Truin 3 -/lll C C /31rlt:. ") I roJec.-' ?-.,.._C . t,.cf: Sht:iVIA I!Ja/£;. GARFIELD COUNTY BUILDING PERMIT APPLICATION °"' q'70 ;;!.<[:., t.fG'(?--- 108 8"" Street, Suite 401, Glenwood Spdn&:•, CO 81601 Phono1 970-945-8212 I Fax: 970-384-3470 /lil•pootion Line! 970-384-5003 Permit No: -+~~"=""';f_._·L-_\1_ __ ParceljSchedule No: ~ /2/-3 3:J. -190 ,_ {J/9 A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OF COLORADO. THIS PERMIT BE,COMES NULL AND VOID IF WORK OR CONSTRUCflON AUTHORIZED IS NOT COMMENCED WITHLN 180 DAYS, OR, IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. l HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME 1'0 BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS GOVERNiNG THIS 1YPE OF WORK WILL BE COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES !'lOT PRESUME TO GIVE AUTHORJ1Y TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL CONSTRUCTION OR THE PERFORMANCE /OO'( <f'S AGREEMENT PERMISSION IS HEREBY QRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS· DETAILED ON PLANS AND SPECIFICATIONS SUBMITIED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SiGNER. HEREBY AGREES 1'0 COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMlT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION 'OF ERRORS IN SAID PLANS, SPBCIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF A!'fY RESPONSIBILITIES OR LIABLITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSI BlLITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTROCTlON RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS LNTEREST. .):~ p ~~~ f I HEREBY ACKNO'-~~:g~:o:rD UNDERSTAND THE AGREEMENT ABOVE (IN!T!ALO ~·· ct.Qbrl C't:: Qt~q $6ijq .sg-$ \O~.'ZF-\ [l'i'OJW l'IOJ/ flO'S\ll4fi) The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all IBC and IRC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign offby the Fire District, and/or State Agencies where applicable. 9. If you will be connecting to a public water and/or sewer system, proof of the tap fees have been paid and the connections inspected by the service provider prior to issuance of a C.O. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. -- ****A CERTIFICATE OF OCCUPANCY MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy\ )tS;l. and the issuance of a Certificate of Occupancy for the dwelling under building permit # U::;J-Lj 'dtw_ S'gnature Bpapplicationoctober2006 I Date VALUATION/FEE DETERMINATION Applicant W. \\, W1l\ 5 M t C.. Address __ 4-'-"'7-"'&'-'1'--_,c.,.l2"'-2"'-'-l _.5: __ _ Date __ ~9o...:-:...2:...'7~· -::.;o.,_'J-1----- Finished (Livable Area): Main Upper Lower Other Basement: Total Square Feet Valuation Unfinished Conversion of Unfinished to Finished Plan Check Fee for Conversion Valuation Garage: Valuation Crawl Space: Valuation Decks/Patios: Covered Valuation Open Valuation Total Valuation Subdivision ·- Lot/Block - Contractor ·r (J;r. GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department, Please review thls document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treatedplates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC. Applicants are required to Indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location. of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property Jines from each comer of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp ou the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the finLlat with the proposed structure located within the envelope. Yes 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp 9B the design. Yes No Not necessary for this project _V,___ 3. Does the site plan indicate the location and direction of the State, County or private road acces~ the property? Yes 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? 2 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Yes __ _ No __ Not necessary for this project / Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for pennit issuance only", "i)Pproval drawings only", "For petmit issuance only" or similar language? Yes__L No__ Not necessary for this project. __ _ Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the unifonn building code or per stamped engineered d ' ? es1gn'/ Yes-IL-No __ Not necessary for this project __ If the building is a pre-engineered structure, is there a stamped, signed engineered found7 plan for this building? Yes No__ Not necessary for this project __ Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and ea/ Yes__ No__ Not necessaty for project Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes__ No__ Not necessary for this project_L Do the plans include design loads as required under the IBC or IRC for roof snowl;r, (a minimum of 40 pounds per square foot in Garfield County)? Yes No __ . Not necessary for this project __ Do the plans include design loads as required for floor loads under the IBC or IRC? Yes_L No__ Notnecessaryforthisproject __ Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes_L No__ Not necessary for this project __ Is the wind speed and exposure design included in the plan? Yes_£ No__ Not necessary for this project __ Does the building section drawing include size and spacing of floor joists, wall studs, ceiling ysts, roof rafters or joists or trusses? Yes__ No__ Not necessary for this project __ Does the building section drawing or other detail include the method of positive connection of all colunms and beams? Yes_L No__ Not necessary for this project __ 3 16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Check applicable zone district for building height maximum) Yes_L No__ Not necessary for this project __ 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes__ No__ Not necessary for this project / 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes__ No__ Not necessary for this project_L 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC oriRC? Yes __ No __ Not necessary for this project_L 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes__ No__ Not necessary for this project V 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specifY safety glazing for these areas? Yes---tL" No__ Not necessary for this project __ 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes__ No Not necessary for this project ,/ 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) Yes__j,{ No__ Not necessary for this project. __ _ 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes__ No__ Not necessary for this project V 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes__ No__ Not necessary for this project V 4 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes__ No__ Not necessary for this project~ 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes__ No__ Not necessary for this project_L 28. Have two (2) complete sets of construction drawings been submitted with the applica7? Yes No __ 29. Have you designed or had this plan designed while considering building and other construction code requirements? Yes-----J..L No__ Not necessary for this project __ 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes_£ No __ 31. Do your plans comply with aU zoning rules and regulations in the County related to your zone district? For comer lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks. Yes .V No __ _ 32. Do you understand that approval for design and/or construction changes are required prior to the implementation of these changes? Yes___£ No __ 33. Do you understand that the Building Department will coJiect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? Yes_..L, No __ 34. Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and occup;mcy of the building? Yes __ v_ No __ 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be giveri for an Agent and that the party responsible for the project must comply with the Uniform Codes? Yes.:.£ No __ 5 36. Are you aware that you must call in for an Inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30a.m; and 3:30p.m. Monday through Friday. Inspections are to be called in to 384-5003. 'I e S 37. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re-inspection fee? Yes_/ No. ___ _ 38, Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge DepartmenJ at 625-860 I. Yes rL_ No ____ _ 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time 6f inspection. Yes 1/ No ___ _ 40. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/ Schedule Number for the lot you are applying for this permit on prior to submittal of the building permit application? Your attention in this is appreciated. Yes L~ No ___ _ 41. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes No (Please check with the building department about this requirement) 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes_JL. __ _ 43. Did an Architect seal the plans for your commercial project? State Law requires any commercial project with occupancy of more than I 0 persons as per Section I 004 of the IBC to prepare the plans and specifications for the project. Yes ~/ No Not Necessary for this project ____ _ I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. ttJ tJ..d<v--- 6 Phone:9lo .9-'/3-'/0tf;;L (days); 970 ;)<(3-'fG<f 9-(evenings) Project Name: tA,)/i/t'qms Ty-;q;v-.. 3-/1/lCC. Bfc!y-:2 Project Address: '{).'3'} CR !),IS/ ?af<:??h .. fe, CO Note: If you answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. *If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Ce1iificate of Occupancy" not being issued. Bpcomm October 2006 7 PLAN REVIEW CHECKLIST Applicant \AJ\ \ '\ ~ ~ Date q-:;} 7-oJ Building hngineered Foundation ..J4z_Driveway Permit / . Ot t~.:W ~Surveyed Site Plan 1 ~ ":)0 ~Septic Permit and Setbacks ~ Gradefropography 30% 4-Attach Residential Plan Review List ~Minimum Application Questionnaire J4t,__Subdivision Plat Notes k)L_Fire Department Review _L'valuation Determination/Fees -LRed Line Plans/Stamps/Sticker _tJt__Attach Conditions ~plication Signed ~Plan Reviewer To Sign Application 7r'arcel/Schedule No. J44,_ 40# Snow load Letter-Manf. Hms. _/soils Report GENERAL NOTES: Planning/Zoning _b'roperty Line Setbacks ~ -:;-d -¥30ft Stream Setbacks ......LL_Flood Plain / p hiP~...{-S V-_Q _\/ __ Building Height u~ ~Zoning Sign-off t4t-Road Impact Fees ~HOAIDRC Approval _Loradetropography 40% --< . oeJ\---ttuJ. 'i--zc.-o 1 ___iL_Planmng Issues 5 v..f D \( ~Subdivision Plat Notes Page 1 of 1 Shawn Wallace From: To: Cc: Sent: Subject: Shawn: "Fiore, Tom (E&P)" <Tom.Fiore@Williams.com> "Shawn Wallace" <tpishawn@earthlink.net> "Miller, Eric (E&P)" <Eric.Miller@Williams.com> Monday, September 10, 2007 11:05 AM Authorization This e-mail will act as authorization for TPI to represent Williams Production RMT and Bargath Inc., in securing building permits for the buildings associated with the Expansion of Parachute Ill Gas Plant. This will include, but not be limited to the New Amine Building, MCC and the Expansion of the existing Compressor Building. Shawn; let me know if you need anything else. Thanks. Tom Fiore Williams Production RMT Office 970 263-27 43 Cell 970 210-1641 9/10/2007 Division of Registrations ( \ , \\'\ I n Page 1 of 2 "--:) ""_,..-\ \'~ \~ '-'<)"'~'\ ~:, \~~.~\ {"'"'~ \\ \J( s- Colorado Tfla omc1a1 stale web ~~mtal 4 { o b 1 b View Permit 638531 Requestor Site Division of Registrations Electrical and Plumbing Permits Online Company Name: PYRAMID CORPORATION First Name: LAWRENCE Last Name: GOODMAN Address: 2375 LELAND AVE City: GRAND JUNCTION State: CO Zipcode: 815050000 Phone: (970) 257-0800 Fax: ()- Email Address: kelly.nicholes@pyramidcorporation.com License Number: 6700 Property Type: PRIVATE Property Owner: WILLIAMS PARACHUTE 3.5 Job Site Address;.. 1 62'3 OIU 15 '/ 1---'f1' cr (!_ /!_ z I ..s:- City: PARACHUTE State: CO Zipcode: County: GARFIELD Power: •NONE Building Type: OTHER Construction Type: NEW Mise Construction: Cost of Materials I Labor$: 2073000 Inspections Inspected Date Type Status 05/15/2009 FINAL ACCEPTED 02120/2009 FINAL REJECTED 11/10/2008 FINAL REJECTED 10/0312008 ROUGH IN ACCEPTED PARTIAL https:/ /www .dora.state.co. us/pls/real!ep _web _permit_gui.show _page?p _user_ type=ELEC... 5/18/2009 Division of Registrations Page 2 of2 09/24/2008 ROUGH IN ACCEPTED 09/22/2008 ROUGH IN ACCEPTED PARTIAL 09/05/2008 FINAL ACCEPTED PARTIAL 09/05/2008 FINAL ACCEPTED PARTIAL 08/29/2008 FINAL ACCEPTED PARTIAL 08/20/2008 FINAL ACCEPTED PARTIAL 07/22/2008 ROUGH IN ACCEPTED PARTIAL 06/12/2008 ROUGH IN ACCEPTED PARTIAL 06/10/2008 ROUGH IN ACCEPTED PARTIAL 05/27/2008 ROUGH IN REJECTED PARTIAL 04/17/2008 ROUGH IN ACCEPTED PARTIAL 04/07/2008 ROUGH IN ACCEPTED 03/28/2008 ROUGH IN ACCEPTED PARTIAL Status/Actions Permit Number: 638531 Type: ELECTRICAL Status: CLOSED Opened: 01/29/2008 Expiration Date: 08/01/2009 Closed: 05/16/2009 Replaces: NONE Replaced By: NONE • Questions? Check out the Definitions Page or Frequently Asked Questions fFAQl. • Please take our Survey to tell us about your experience with the online permits site. Generated: 05/18/2009 08:31 a.m. Federal Home Page II State Horne Page II Department Home Page Top of Page Privacy Statement I Disclaimer Technical Assistance: E-mail Information Technology Section E-Mail the Division of Registrations i5SO Broadway, Suite 1500 Denver, CO 80202 (303} 894~2985-Phone (303) 894·23 'lO -Fax Relay Colorado (T1Y (Engiish & Spanish), Voicl't, VCO, ASCII, STS Assistance Numbers) https://www.dora.state.co.us/pls/real!ep _web _permit_gui.show _page?p _user_ type=ELEC... 5/18/2009 May 12 09 12:20p Scott l. Maxwell 970-314-7067 ;ot11 THUNDER MOUNTAIN TESTING ••• 2973 F. Road • Grand Junction, CO 81504 (970)256-9965 I Cell (970) 2111-7008/FAX (970) 314-7067 Exterran 20602 East 81" Street Broken Arrow, OK 74115 ATTN: Mr. Jim Akins RE: POOP 113 MCC #2 Bnildlng 4289CR215 Parachute, CO Dear Mr. AkillS, March 31, 2008 Pennit#l0674 As requesled, structural steel special inspection was conducted per tbe IBC 2000 Edition -Chapter 17: Strucwral Tests and Special Inspection and Garfield County tequirements. I arrived on site at 9:00AM. 1 met with Mr. Ron Byrd with Exterrao to review proje<:t requirements and specifications. The project steel erector is TPI Commercial Construction In Grand Junction, Colorado. Project drawings indicate ''Tum-of- nuf' method for bolt tensioning as defined in the AISC 9"' Edition: Manual of Steel Construction. Approved drawings on site utilized for inspection were provided by B & C Steel in Seottsbluft; NE.: Job 114643 dated 5/12/06. Visual inspecUon was condw:ted at the Roof Framing Plan level on the 518" & '1.<" ASTM A325 High Strength beam to beam and beam to column bolted connections. As a minimum, 1 0"/o of all connections, but not less than 2 bolts per connection were inspected for proper tensioning and bolt match marldng teclmiques as slated in IBC requirements for period!~ inspection. Inspection was conducted at grid line A-C & 1 -S. Bolts Inspected were observed to be acceptable with proje<:t bolt tension requirements. Cc: David Pena -Exterran p.3 May 12 09 12:20p Scott L. Maxwell 970-314-7067 THUNDER MOUNTAIN TESTING ••• Z973 F. Road + Grand Junction, CO 815(14 (970)256-9965/ Cdl (97&) 21~7008/ FAX (970) 314-7067 Exlemm 20602 East 81" Slreel Broken An"ow, OK 74115 ATTN: Mr.1im Akins RE: PCGP #3 MCC #2 Building 4289CR21S Parachute, CO Dear Mr. Akins, March 31' 2008 Pennlt#l0674 As requested, structural steel special inspection was conducted per the !BC 2000 Edition • Chapter 17: Slrucrural Tests and Special Inspection and Garfield County requirements. I arrived on site at 9:00 AM. I met with Mr. Ron Byrd with Exterron to review projll(;t requirements and specifi<:atious.. Tho project steel erector is TPI Commercial Construction in Grand Junction, Colorado. Projea drawings indicate "Tum-of- nut" method for bolt tensioning as defined in the AISC 9" Edition: Manual of Steel Conslruction. App«>ved drawings on site o.Wlized fur inspection were provided by B & C Steel in ScolD;bluff. NE.: Job 114643 dated S/12/06. Visual inspection was conducted at the Roof Framing Plan level on the 5/8" & '4" ASTM A325 High Strength. beam to beam and beam to column bolted connections. As a minlmum, 10% of all connections, but not less titan 2 bolts per connection were inspected for proper tensioning and bolt match marking techniques as stated in IBC requirements for periodic inspection. Inspection was conducted at grid line A-C & 1 -5. Bolts Inspected were observed to be awceptable with project bolt tension requirements. Cc: David Pena -ExtemDI p.3 Parcel Detail Page 1 of 4 Garfield County Assessor/Treasurer Parcel Detail Information Ass_essorLireasnreLPmpeiiYSean;:h I A~_s~_s_sor S\l])_seLQuery I AssessoLSale$_S_e!!xeh Clerk&_Rec;;orderReeeptionSern:c.:h Parcel Petail I Value Petail Sales J2etail I R_esjdential/Commerciallmprovement Detail Land Detail I Photographs I Tax Area II Account Number II Parcel Number II Mill Levy I I 026 II R008109 II 211m2ooo19 II 36.682 I Owner Name and Mailing Address jWILLIAMS PRODUCTION RMT COMPANY I jc;o LOGAN & FIRMINE I j3615 S HURON ST, STE 200 I jENGLEWOOD, CO 80110 I Legal Description jSECT,TWN,RNG:33-6-96 DESC: A TR IN I jSEC 4 7-96 SECS 27, 28, 29, 32, 33, I j34. PRE:R260381 PRE:R005786 BK:714 I lPG: 1 BK:702 PG:411 BK:682 PG:294 I jBK:658 PG:762 BK:657 PG:419 BK:641 I jPG:759 BK:640 PG:l31 BK:630 PG:883 I jBK:377 PG:l06 BK:355 PG:266 BK:326 I jPG:220 BK:275 PG:1 BK:268 PG:119 I jBK:134 PG:98 BK:125 PG:41 BK:1129 I jPG:l16 BK:1795 PG:96 RECPT:697033 I jBK: 1793 PG:599 RECPT:696730 BK: 1780 I jPG:407 RECPT:694080 BK:1731 PG:127 I jRECPT:683317 BK:1668 PG:426 I jRECPT:66984 BK:1655 PG:230 I jRECPT:666856 BK:1621 PG:903 I http://www .garcoact.comlassessor/parcel.asp?Parce1Number=2171332000 19 9/13/2007 Parcel Detail Page 2 of 4 jRECPT:659636 BK:1617 PG:263 I IRECPT:658768 BK: 1587 PG:440 IRECPT:652080 BK: 1582 PG:31 jRECPT:651031 BK:l300 PG:448 IRECPT:591324 BK:l300 PG:439 IRECPT:591323 BK:1300 PG:43l IRECPT:591322 BK: 1300 PG:421 IRECPT:591321 BK:l300 PG:414 I jRECPT:591320 BK:1300 PG:410 I IRECPT:591319 BK:l300 PG:392 I IRECPT:591318 BK:l300 PG:389 I IRECPT:591317 BK:l204 PG:993 I IRECPT:568682 BK: 1263 PG:299 I IRECPT:583146 BK: 1205 PG:9 I IRECPT:568684 BK:l205 PG:1 I IRECPT:568683 BK: 1187 PG: 176 I IRECPT:563403 I Location I Physical Address: I I Subdivision: I I Land Acres: 111333.01 I I Land Sq Ft: llo I Section II Township II Range I I 33 II 6 II 96 I Property Tax Valuation Information II Actual Value II Assessed Value I I Land: II 7,48011 2,1701 I Improvements: II Oil 0 I Total: II 7,48011 2,1701 Sale Date: 1!1 0/3112001 Sale Price: l/1 ,536,000 Basic Building Characteristics http://www .garcoact.cornlassessor/parcel.asp?ParcelNumber=2171332000 19 9113/2007 P;rrcel Detail I I I I I I I Number of Residentiallo Buildings: Number of Commllnd lo Buildings: No Building Records Found Tax Information Tax Year II Transaction Type 2006 II Tax Payment: Second Half 2006 II Tax Payment: First Half 2006 II Tax Amount 2005 II Tax Payment: Second Half 2005 II Tax Payment: First Half 2005 II Tax Amount 2004 II Tax Payment: Second Half 2004 II Tax Payment: First Half 2004 II Tax Amount 2003 II Tax Payment: Second Half 2003 II Tax Payment: First Half 2003 II Tax Amount 2002 II Tax Payment: Second Half 2002 II Tax Payment: First Half 2002 II Tax Amount 2001 II Tax Payment: Second Half 2001 II Tax Payment: First Half 2001 II Tax Amount IQ~lDf Page II Amount I II ($40.36)1 II ($40.36)1 II $80.721 II ($40.43)1 ($40.43)1 $80.861 ($46.50)1 ($46.50)1 II $93.ool II ($49.86)1 II ($49.86)1 I $99.721 ($47.74)1 ($47.74)1 $95.481 ($50.93)1 II ($50.93)1 II $101.861 Asse5sm: ... Ratal:Jase SeiiTGhOptions I Treilsur_eJ:.Rt1t.al:Jase Search Ortions C1erk&RecorderRatAl:JaseSeil.rGh0ptions ""G""'ar""'fie"'l,d.Countv Home Page Page 3 of 4 The Garfield County Assessor and Treasurer's Offices make every effort to collect and maintain accurate data. However, Good Turns Software and the Garfield County Assessor and Treasurer's Offices are unable to watTant any of the information herein contained. http://www .garcoact.cornlassessor/parcel.asp?P;rrce!Number=217!332000 19 9/13/2007