HomeMy WebLinkAboutApplication-PermitGarfield County No. I I
. Building & Sanitation Department
108 8th Street, Suite #401 Glenwood Springs, Co. 81601
Office 945-8212 Inspection Line 384-5003
Job Address: cr 215, Parachute
Locality: 2135-273-00-015
Use of Building: Metal bldg storage f/electric natural gas compressors
Owner: EnCana Oil & Gas
. Contractor: Owner
Amount of Permit: $2,129.41 71~4~~0(
Clerk: _ __,L---.;.. ... _..~=-.;;..=;;..:.._,' =,?..-:-\,::....>.---
Date:
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8'" Street, Suite 401, Glenwood Springs, CO 81601
Phone: 970-945·8212/ Fan: 970·384·3470 / Inspe<::tion Line: 970·384-5003
/07'{d--Paccel/SoheduleNo 2.I~)-27J-(O-O\§.EP 2 8 2007 Permit No:
A SEPARAT!l: EI.ECTR!CAL PERMIT IS REQUIRED AND MUST BE
ISSUED BY THE STATE OF COLORADO.
THIS PERMIT B£COMES NULL AND VOID IF WORK OR CONSTRUCTION
AIJTHORIZED IS NOT COMMENCED WITHJ.,N 180 DAYS, OR, IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMJ~NCED.
l HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AI"'D KNOW THE SAME TO BE TRUE AND CORRECf. ALL
PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE
COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE
GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AIJl'HORITY
TUO~'VItJOJLA~Tll~';!ofiR~CiiAN;jtC~E,NLT o":<EooPiRisO~Vi·;SUI<O;Nri:s(,ooF.o· ANY:R OTHER STATE OR O THE PERFORMANCE
AGREEMENT
PERMISSION IS HER!l:BY GRANTED TO THE APPLICANT AS OWNER, CONTRACl'OR AND/OR THE AGENI' OF THE CONTRACI'OR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITIED TO AND REVIEWED BY THE BUILDING DEPAl<:TMENT.
IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH AI.J, BUILDING CODES AND LAND
USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURI'HER AGREES
THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE I.COATION, ERECflON, CONSTRUCTION, AND USE OF THE
ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME
NULL AND VOlD. THE ISSUANCE OF A PERMT BASED UPON PlANS, SPECIFICATIONS AND OTHE:R DATA SHALL NOT PREVENT THE BUILDING OFFICIAL
FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING
BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGUI.ATION OF
THIS JURISD!CTION. THE l~EVIEW OF SUBM11TED PJ.,ANS AND SPECIFICATIONS AND IN'SPECfiONS CONDUCfED THEREAFTER DOES NOT c(msr!Tl.Tl'E
AN ACCEPTANCE OF ANY RESPONSIBIL!T!ES OR UABLITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSI
BILITY FOR THESE ITEMS AND IMPLEMENTATION DURJNG CONSTRUCTION RESTS SPEClFlCIA!..LY WITH THE ARTICfECT, DESIGNER, BUILDER,
AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATNE AND IN SUPPORI' OF THE OWNERS LNTEREST.
I HEREBY ACKNOWl-EDGE THAT I HAVE READ AND UNDERSTA."iD THE AGREEMENT ABOVE (!NlTIAL): :=? ~
The following items are required by Garfield County for a final inspection:
L A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold
running water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all IBC and IRC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until
all the required items are completed and a final inspection made;
8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway
installation, where applicable; as well as any final sign off by the Fire District, and/or State
Agencies where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE
ABOVE ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupanc~ use and the issuance of a
Certificate of Occupancy for the dwelling under building permit# tJ '] <(;:;;.....,__
Signature
Bpapplicationfeb2006
Date
'
VALUATION FEE DETERMINATION
Applicant
Address
Date
Encruma 0 ( l 'f E;« ~ Subdivision
.:;C;;;R;:.;2;:;1:;;5::....:::...:...:__:.-"-=-,--_..;.---Lot/Block
10/30/2007 Contractor ~~~--------~~--
Finished (Livable Area):
Main
Upper
Lower
Other
Total
Basement:
Unfinished
Square Feet
Valuation
Conversion of Unfinished to Finished
Total Valuation
Garage:
Valuation
Crawl Space
Valuation
Decks/ Patios
Valuation
Covered
Open
Type of Construction:
Occupancy:
F-1
Valuation
Total Valuation
sf
sf
sf
sf X $74.68
0 sf
sf X $41.00
sf X $33.68
sf X $18.00
sf X $9.00
sf X $24.00
sf X $12.00
Commercial
3825 sf X $39.88
sf X
sf X
sf X
sf X
sf X
SIS Cetp. 0 v-> 111€..11-
0.00
0.00
0.00
0.00
0.00
152,541.00
152,541.00
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
FOR
CONSTRUCTION OF
COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS
Including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
And
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite
the issuance of a permit it is important that complete information be provided. When reviewing
a plan and it's discovered that required information has not been provided by the applicant, this
will result in the delay of the permit issuance and in proceeding with building construction. The
owner or contractor shall be required to provide this information before the plan review can
proceed. Other plans that are in line for review may be given attention before the new
information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. Also, please consider
using a design professional for assistance in your design and a construction professional for
construction of your project. Any project with more than ten (10) occupants requires the
plans to be sealed by a Colorado Registered Design Professional.
To provide for a more understandable plan and in order to determine compliance with the
building, plumbing and mechanical codes, applicants are requested to review the following
checklist prior to and during design.
Plans to be included for a Building Permit must be on draft paper at least 18"x 24'"' and
drawn to scale.
I
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade
and original grade line. A section showing in detail, from the bottom of the footing to the top of
the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and
spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building
material. Engineered foundations may be required. Check with the Building Department.
A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must
be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H.
windspeed, wind exposure B or C, and a 36 inch frost depth.
All sheets need to be identified by number and indexed. All of the above requirements must be
met or your plans will be returned.
All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC.
Applicants are required to indicate appropriately and to submit completed checklist at
time of application for a permit:
1. Is a site plan included that identifies the location of the proposed structure, additions or
other buildings, setback easements, and utility easements showing distances to the
property Jines from each comer of the proposed structure prepared by a licensed surveyor
and has the surveyors signature and professional stamp on the drawing? Slopes of 30%
or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan
for the placement of any portion of a structure within 50 ft. of a property line and not
within a previously surveyed building envelope on a subdivision final plat shall be
prepared by a licensed surveyor and have the surveyors signature and professional stamp
on the drawing. Any structure to be built within a building envelope of a lot shown on a
recorded subdivision plat, shall include a copy of the building envelope as it is shown on
the finiLat with the proposed structure located within the envelope.
Yes ·
2. Does the site plan when applicable include the location of the I.S.D.S. (Individual
Sewage Disposal System) and distances to the property lines, wells (on subject property
and adjacent properties), sh·eams or water courses? This information must be certified by
a licensed surveyor with their signature and professional stamyon the design.
Yes No Not necessary for this project -'V,___
3. Are the plans submitted for application review construction drawings and not drawings
that are stamped or marked identifying them as "Not for construction, for permit issuance
only", "Approval drawings only", "For permit issuance only"/or similar language?
Yes No__ Not necessary for this project.__.:_'---
4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a
2
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Colorado Registered Engineer?
Yes No__ Not necessary for this project
Does the site plan indicate the location and direction of the State, County or private road
accessi~ the property?
Yes t/
Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design>
Yes_V_ No Not necessary for this project __
If the building is a pre-engineered structure, is there a stamped, signed engineered
foundattpn plan for this building?
Yes_t/_ No__ Not necessary for this project __
Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and eartJ;J
Yes__ No__ Not necessary for project_V_
Do the plans indicate the size and location of the ventilation openings for the attic, roof
joist Spjj.CeS and soffits?
Yes_V_ No__ Not necessary for this project __
Do the plans include design loads as required under the IBC or IRC for roof
snowlo¢s, (a minimum of 40 pounds per square foot in Garfield County)?
Yes_/_ . No__ Not necessary for this project __
Do the plans include design loads as required for floor loads under the IBC or IRC?
Yes__ No__ Not necessary for this project V
Does the plan include a building section drawing indicating foundation, wall, floor, and
roof CO!)Struction?
Yes_V_ No__ Not necessary for this project __
Is the wind speed and exposure design included in the plan?
Yes L No__ Not necessary for this project __
Does the building section drawing include size and spacing of floor joists, wall studs,
ceiling jeists, roof rafters or joists or trusses? . .
Yes_/_ No__ Not necessary for this proJeCt __
Does the building section drawing or other detail include the method of positive
connecyon of all columns and beams?
Yes_V__ No__ Not necessary for this project __
3
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Does the elevation plan indicate the height of the building or proposed addition from the
undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or
the top~ a flat roof? (Check applicable zone district for building height maximum)
Yes_i/_ No__ Not necessary for this project __
Does the plan include any stove or zero clearance fireplace planned for installation
including make and model and Colorado Phase II certifications or Phase II EPA
certification?
Yes No Not necessary for this project /
Does the plan include a masonry fireplace including a fireplace section indicating design
to comply with the IBC or IRC? /
Yes__ No__ Not necessary for this project_\/_
Does the plan include a window schedule or other verification that egress/rescue
windows from sleeping rooms and/or basements comply with the requirements of the
IBC oriRC?
Yes Not necessary for this project V No
Does the plan include a window schedule or other verification that windows provide
natural light and ventilation for all habitable rooms? /
Yes__ No__ Not necessary for this project_V_
Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally
used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub
enclosures and specify safety glazing for these areas?
Yes__ No__ Not necessary for this project_L
Do the plans include a complete design for all mechanical systems planned for
installation in this building?
Yes__ No Not necessary for this project /
Have all areas in the building been accurately identified for the intended use?
(Occupancy as identified in the IBC Chapter 3) /
Yes__ No__ Not necessary for this project--"t/c.___
Does the plan indicate the quantity, form, use and storage of any hazardous materials that
may be in use in this building? /
Yes__ No__ Not necessary for this project_V_
Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
4
Yes No Not necessary for this project ~
26. Do the plans indicate the location and dimension of restroom facilities and if more than
four employees and both sexes are employed, facilities for both ;exes?
Yes__ No__ Not necessary for this project_./_
27. Do the plans indicate that restrooms and access to the building are handicapped
accessible? /
Yes__ No Not necessary for this project __
28. Have two (2) complete sets of construction drawings been submitted with the
applicajion?
Yes v No
29. Have you designed or had this plan designed while considering building and other
construytion code requirements?
Yes_.,(_ No__ Not necessary for this project __
30. Does the plan accurately indicate what you intend to construct and what will receive a
final inm\ection by the Garfield County Building Department?
Yes V · No ----
31. Do your plans comply with all zoning rules and regulations in the County related to your
zone district? For corner lots see supplemental section 5.05.03 in the Garfield County
Zoning Resolution for setbacks.
Yes v' No __ _
32. Do you understand that approval for design and/or construction changes are required
prior to ;he implementation of these changes?
Yes v No ----
33. Do you understand that the Building Department will collect a "Plan Review" fee from
you at the time of application and that you will be required to pay the "Permit" fee as
well as any "Septic System" or "Road Impact" fees required, at the time you pick up your
buildinjil permit?
Yes;/ No ----
34. Are you aware that you are required to call for all inspections required under the IBC
including approval on a final inspection prior to receiving a Certificate of Occupancy
and ocs;upancy of the building?
Yes v No ----
35. Are you aware that the Permit Application must be signed by the Owner or a written
authority be given for an Agent and that the party responsible for the project must
5
36.
37.
38.
39.
40.
41.
42.
comply yith the Uniform Codes?
Yes_V__ No __
Are you aware that you must call iu for an inspection by 3:30 the business day
before the requested inspection in order to receive it the following business day?
Inspections will be made between 7:30a.m. and 3:30p.m. Monday through Friday.
Inspections are to be called in to 384-5003.
Are you aware that requesting inspections on work that is not ready or not accessible
will resylt in a $50.00 re-inspection fee?
Yes_\/_ No ___ _
Are you aware that prior to issuance of a building permit you are required to show proof
of a driveway access permit or obtain a statement from the Garfield County Road &
Bridge Department stating one is not necessary? You can contact the Road & Bridge
Department at 625-8601.
Yes / No ___ _
Do you understand that you will be required to hire a State of Colorado Licensed
Electrician and Plumber to perform installations and hookups? The license number will
be required at time of inspection.
Yes V No ___ _
Are you aware, that on the front of the building permit application you will need to fill in
the Parcel/ Schedule Number for the lot you are applying for this permit on prior to
submittaj.,ofthe building permit application? Your attention in this is appreciated.
Yes V No ___ _
Do you know that the local fire )listric! may require you to submit plans for their review
of fire safety issues? V No (Please check with the
building department about this requirement)
Do you understand that if you are planning on doing any excavating or grading to the
property prior to issuance of a building permit that you will be required to obtain a
grading pyrmit?
Yes--"~~'----
6
I hereby acknowledge that I have read, understand, and answered these questions to
the best of my ability.
Signature
(evenings)
Project Name:_:21 . .6Ai>:!;;z=~·~ff1~==:::_ _______ _
Project Address: q , ... :;\, "'"\!.-o" L.o~'"'~'J '?-o.,J.->--\ ')
Note:
St..!)\-, "'2.\. 2-o C) ·:r
Date
If you answered "No" on any of these questions you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in
issuing the permit are to be expected. Work may not proceed without the issuance of the permit.
*If you have answered "Not necessary for this project" on any of the questions and it is
determined by the Building Official that the information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, please expect the
following:
A. The application may be placed behind more recent applications for building permits in
the review process and not reviewed until required information has been provided and the
application rotates again to first position for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
*If you answered "No" to this question the circumstances described in the question could result
in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued.
Bpcomm
Feb2005
7
PLAN REVIEW CHECKLIST
Applicant f.AJc trN It--
Building
v{ngineered Foundation
_Lbriveway Permit ~;t:<-•~ pt~-w-J..
~Surveyed Site Plan
~Septic Permit and Setbacks
~Gradetropography 30%
~Attach Residential Plan Review List
/ Minimum Application Questionnaire
-L;t-subdivision Plat Notes
~Fire Department Review Z aluation Determination/Fees
_L_Red Line Plans/Stamps/Sticker
~Attach Conditions
-V-Application Signed
J Plan Reviewer To Sign Application
_0arcel/Schedule No.
J1L_ 40# Snow load Letter-Manf. Hms.
· "/ Soils Report
GENERAL NOTES:
Date _ _L)...,O:..:._-_...I-'-1 -'-c;~7 __ _
Planning/Zoning
~roperty Line Setbacks ;31. '7" fl<:..n.e"J ,
CloS<k" f~r JS':o>p~.o..
V 30ft Stream Setbacks
~Flood Plain
v/J3uilding Height
~Zoning Sign-off
_cjz._Road Impact Fees
-4-HOA/DRC Approval
_Voradetropography 40%
~Planning Issues Stt.P ApfO.Civ'<-¢
~Subdivision Plat Notes
Assessor's Parcel NJ)_ f3 S-:273· 60-oiS
Date /! /~/ 0 7 I 7 DING PERMIT CARD
Job Address ..Ll..s::::O:..<::::t::-=::::~:.:;:2~~~2(.l.;..L_J...!::.~~~~~GJ~~!?,;_1fo::._:3~5:::___,,.-~7>17~--~r;-h:rl"\
Owner~ {J;J { kf!!sA) ~ Address CtL;;tJ:j ~ ,fp~~e #a ?l{~ ~ G.;;l. ~
Contractor ~ . Address~ M ~ Phone # d.85-;{ K>6 7
_____ Rear _____ RH _____ LH _____ Zoning --'----
INSPECTIONS
Weatherproofing __________ _
Mechanical ____________ _
Electrical Rough (State) ________ _
Electric:~! F,iral .LState) .
Final ·:?< · .?-f• 1 U /Checklist Completed? }...__/{)?
Certificate Occupancy # CaLl 0:5
Date :2-· 2...:2 · 1 0
Septic System # __!JO;-f-/!...!lt ________ _
Date ___________ _
Underground Plumbing _____ _
Rough Plumbing _______ _
Framing ___________ _
Insulation __________ _
Roofing ___________ _
Final ___ -.-:-tl"t-------
Other cf,i~ -iJ(B
NOTES
Drywall ___________ _
Gas Piping _________ _
(continue on back)
24 HOURS NOTICE REQUiRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date JssuedJJ{.~f.!r.J ..... Zoned Arca ....•.•..............•.•.•..... Permit No •.• ../Q .. "lY:.b..
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDIATELY BECOME NULL AND VOID.
use \ji;\\J.t st~uqe b\t\\1, F /nk~c, '11Ci\\)rol '<~,ClS Q:>'ffit;>l(e.5'l><::'l'f0
Address or Legal Description • ( C ff, \";), f's:lltt.\\'.'ll..J\6
Owner h'l\fu\'1(\ C\\\.. h:(\t\0 Contracj"ourL--'.C;.,lc!J\),.),_'Sl:ill;<!:LC _____ _
Setback<;. Front Side Side Rear
Tbis Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing [V\'l1J1 ~ 1~-q.o~ ~ Driveway
Foundation Jl-)o·b'l ~
Underground Plumbing Insulation
Rough Plumbing Drywall
Chimney & Vent Electric Final (by State Inspector)
Gas Piping Final.;>. -·'/-!0 0-f<X.N_,.;o
Electric Rough (By State Inspector) Septic Final
Framing Notes:
(To include Roof in place and Windows
and Doors installed).
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING-
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
For inspections Call384-5003 108 8th Street Glenwood Springs, Colorado
APP~DO NOT DESTROY TillS CARll
Date II By <tl} U C €
IF PLAanE-COVEhJTH CLEAR PLASTIC
Letter of Transmittal
To: Jeffrey Schaefer Transmittal #: 9
Date: 10/19/2007
aJRPORATE OFFICES
2665 Westhollow Drive
Houston. Texas 77082-1846
(261) 531-2800
Fa>t [281) 531-2888
EnCana Oil & Gas (USA), Inc.
Republic Plaza Job: 2300 EnCana Oil & Gas (USA) Inc.
370 17th Street
Suite 1700 Reference: 078876912000551
Denver, CO 80202
Ph: 720-876-5524 Fax: 720-876-6524
Subject: Revised IFC Drawings -Compressor Building -Parachute, CO
WE ARE SENDING YOU
r Shop drawings
r Copy of letter
·Document Type
r;r Attached
r: Prints
r• Change order
Copies Date
r: Via:
r Plans
r Specifications
No.
r Samples
r;r E-mail
DescriPtion
Drawing 10/15/07 2300-01A1 REV 1 SPECS, ACCESSORIES AND COLOR/FINISH CHART ------------·-•••----·-·--••·---·-__ , __ , ____ , _____ , __________ ,,_,,,,_ --·•M•~~-------~-••••••-•"·o-••••-··---------• ---•"•''' ----~"·••--••••-
Drawing 1 1 0/15/07 2300-01 A2 REV 1 FLOOR PLAN
···---··-·····----········-·-··· .. ···· ........ ___ -------· -·---·--·-·------··-·--··-·-"""""" ·-----···-·······-----------------·-·--·--.. ---......
Drawing 1 10/15/07 2300-01A3 REV 1 ELEVATIONS
Drawing 1 10/15/07 2300-01A4 REV 1 ELEVATIONS
Drawing 1 1 0/15/07 2300-01 A5 REV 1 CROSS SECTION ____ .... _
Drawing 1 8/23/07 2300-01A6 REV 1 SECTIONS
Drawing 8/23/07 2300-01A7 REV 1 SECTIONS
Drawing 10/15/07 2300-01F1 REV 1 ANCHOR BOLT PLAN
Drawing 10/18/07 2300-01F2 REV 1 BASE PLATES DETAILS, SECTIONS AND
·--·---·--... ····----____ -------·--·······-·····f3EACTlON.§_ ............................................... -----·--·
THESE ARE TRANSMITTED as checked below:
r For approval .•1"0 !\1;i!\'J·~·"'~··.· '\'<
r For your use r Approved as noted
r As requested r Returned for corrections
r For review and comment Br :.jii~uW!~f.QQri:ilfuctioh 1
'"' ~I:,. ,• ·· . ;: •. •i·-·,.•· · .... ,., .. : .. o.' ·.'·'·-·'<:·~ .:· ;. ·. ". ·:.:'. · ·, ·
r FOR BIDS DUE
Remarks:
Distribution: Mike Rasch (SISCORP)
From: Mike Rasch (SISCORP)
r Resubmit_ copies for approval
r: Submit_ copies for distribution
r Return _ corrected prints
If enclosures are not as noted, kindly notify us at once. Page 1 of 1
Le1:ter of Transmittal
To: Jeffrey Schaefer Transmittal#: 10
Date: 1 0/30/2007
CORPORAIE OFFICES
2665 Westhollow Drive
Houston, Texas 77062-1646
(281) 531-2600.
Fax: (281) 531-2888
EnCana Oii & Gas (USA), Inc.
Republic Plaza Job: 2300 EnCana Oil & Gas (USA) Inc.
370 17th Street
Suite 1700 Reference: 078876912000551
Denver, CO 80202
Ph: 720-876-5524 Fax: 720-876-6524
Subject: Revised IFC Drawing -Compressor Building -Parachute, CO
WE ARE SENDING YOU P' Attached r Via:
r Shop drawings r· Prints r Plans
r Copy of letter r Change order r Specifications
Document Type Copies Date No.
Drawing 10/18/07 .2300-01A5 REV 2
r• For approval
r For your use r Approved as noted
r As requested r Returned for corrections
r For review and comment
r FOR BIDS DUE
Remarks:
Distribution: Mike Rasch (SISCORP)
From: Mike Rasch (SISCORP)
r Samples
P' E-mail
Descriotion
CROSS SECTION
r Resubmit _copies for approval
r Submit_ copies for distribution
r Return_ corrected prints
If enclosures are not as noted, kindly notify us at once. Page 1 of 1
COLORADO STATE ELECIRICAL BOARD
INSPECTION REPORT I CORRECTION NOTICE
Date Received: 16-APR-09 Permit Number: 661189
Contractor/HomeOwner: MURDOCK ELECTRJC INC
10652 CR 215 Address:
Type of Inspection: Final
Action: Accepted
Comments or Corrections: New vent system to be under new permit
1) make sure control panel is not in C1D21ocation (fuses)
Inspectors Name: Cyrus Tuchscher
Phone Number: 970-625-5085 Date: 16-APR-09
COLORADO STATE ELECTRICAL BOi\RD
DEPARTMENT OF REGULATORY AGENCIES
1580 Logan St Suite 550
Denver, Colorado 80203-1941
Phone: (303) 894-2985 ·
https://www.dora.state.co.us/pls/real/Ep _Web _Inspection_ G UI .Process _Page
\ 07l42-'* 9:7 0 :;-+
tlcJ50
10/27/2009
THUNDER MOUNTAIN TESTING
••• 2973 F. Road • Grand Junction, CO 81504
(970) 256-9965/ Cell (970) 210-7008 I FAX (970) 314-7067
Encauta Oil & Gas
2717 Cord 215, Suite 1000
Parachute, CO 8163 5
ATTN: Mr. Rick Barnett
RE: Compressor Building
CR215
Parachute, Colorado
Dear Mr. Barnett,
December 9, 2009
Permit #10742
As requested, structural steel special inspection was conducted per the IBC 2006 Edition -Chapter
17: Structural Tests and Special Inspection and Garfield County requirements. I arrived on site at 1:30PM.
I met with you to review project requirements and high strength bolting specifications. The pre-
manufactured metal building fabricator for this project is SIS Corporation ill Houston, Texas. The steei
erector for this project is Dynamic Service Inc. in De Beque, Colorado.
Visual inspection was conducted at the Roof Framing Plan level on the'!." & 7/8" ASTM A325
High Strength beam to beam, beam to column, and crane rail bolted connections. Project bolt tension
requirements indicate "Turn-of -Nut" method as referenced· hr approved projectdrawings·provided·by SIS··
Corporation: Job No. 2300-01, File No. 2300-0 !A 1 Rev. 0 dated 7117/09. As a minhnum, 10% of all
connections, but not less than two bolts per connection were inspected for prop()r bolt tension requirements
and match marking techniques as stated in IBC requirements for periodic inspection: Table 1704.3, Item
2.b. Inspection was conducted at grid line E-G & 1 -4. All bolted connections inspected were observed to
be adequately tensioned to project requirements.
Respectfully Sub~~-d, p~ //
.?(//_ //} y;J. I ;/}I
-<::/#t7f<rJTI I !fl:it(
,;;.-Scott L. Maxwell ·
ICC Certified #0863569-Sl & S2
Thunder Mountain Testing
DYNAMIC
o.; C I~ V I C. C <..;.
January 19. 2009
Encana Oil & Gas
Mr. Rick Barnett
2717 County Road 21 5
\)arachute, CO
Reference: Miclclle Fork Compressor Station: Compressor BuildingH->-Strength-8-oJt
Torque Test
Ill o t-;<.~
The following are results of a torque test administered by Dynamic Services, of the hi-
strength bolts in the above mentioned building. The procedure used was a Turno:fthe-Nut
process._ Procedure is as follows:
I. Hanel tighten all stllJctural nuts and bolts with wrench or impacnvrench.
' Mark all nuts and bolts with paint marker in one straight line ii-om bolt to nut.
J. Hammer wrench nuts another~~ turn, as allowed to see \vith t11arki.ng. \.'it'i.e ...
4. Torque wrench nuts to see resulting poundage.
Results are as follows:
I. Column to Rafter connections= 310 lbs.
2. Rafter to Rafter connections = 3 I 0 lbs.
). Crane Beam connections
4. Wind 8cnt connections
= 2~0 lbs.
= 280 lbs.
If you have any questions regarding the results of this test or the test itself~ please reel
i'ree to contact me at 307-IJ79-6442.
)U~
i\t\:a Superin:dcnt /Western Slupc Drstrict
Dynmnic Serv\c~::s
Parcel Detail Page 1 of 5
Garfield County Assessor/Treasurer
Parcel Detail Information
t\$§e§SoJ:/Ire4!ilJmLPmpertyScilcrcl! I Assessor Subset Query I Ass~soLS.11les Search
Clerk:&cJSemrdeLReGeJ?tionSe~JrGh
Basic Bui]ding_Characteristics I Tax Infonnation
Parcel Detail I Value Detail I Saleu;>etilcil I Residential/Commercial Improvement Detail
Land Detail I Photographs
I TaxArea II Account Number II Parcel Number II Mill Levy I
I o26 II R460005 II 213527300015 II 36.682 I
Owner Name and Mailing Address
IENCANA OIL & GAS (USA) INC.
C/0 LOGAN & FIRMINE
3615 S. HURON STREET, SUITE 200
!ENGLEWOOD, co 80110 I
Legal Description
lsECT,TWN,RNG:27-5-96 DESC: SEC 2 I
ILOT 4(NET 27.16A) ALSO A TR IN SEC I
12&11 DESC: CONT 341.07 A SEC 3 S2NE, I
ls2NW, S2 LOT 1(40.82A) DESC: I
I2(40.69A) 3(40.57A) 4(40.44A) SEC 4 I
ls2NE, S2NW, DESC: S2, LOT 1(40.33A)
I2(40.21A) 3(40.11A) 4(39.99A) DESC:
ISEC 5 S2NE, S2NW, S2 LOT 1(39.80A)
I2(39.52A) DESC: 3(39.24A) 4(38.96A)
!SEC'S 8,9,10 ALL SEC 14 W2NE, DESC: I
INW, S2 SEC 15 W2NE, NENE, NW, S2
lsEC 16 ALL SEC DESC: 17 E2 SEC'S
121,22,23,24 ALL SEC 25 TR
137(107.06A) DESC: LOTS 1(37.84A)
I2(37.42A) 6(6.55A) 7(11.27A) N2NE,
http:/ /www.garcoact.com/assessor/parcel.asp?Parce1Number=2135273000 15 9/28/2007