Loading...
HomeMy WebLinkAboutApplication-PermitGarfield County No. I I . Building & Sanitation Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Office 945-8212 Inspection Line 384-5003 Job Address: cr 215, Parachute Locality: 2135-273-00-015 Use of Building: Metal bldg storage f/electric natural gas compressors Owner: EnCana Oil & Gas . Contractor: Owner Amount of Permit: $2,129.41 71~4~~0( Clerk: _ __,L---.;.. ... _..~=-.;;..=;;..:.._,' =,?..-:-\,::....>.--- Date: GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8'" Street, Suite 401, Glenwood Springs, CO 81601 Phone: 970-945·8212/ Fan: 970·384·3470 / Inspe<::tion Line: 970·384-5003 /07'{d--Paccel/SoheduleNo 2.I~)-27J-(O-O\§.EP 2 8 2007 Permit No: A SEPARAT!l: EI.ECTR!CAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OF COLORADO. THIS PERMIT B£COMES NULL AND VOID IF WORK OR CONSTRUCTION AIJTHORIZED IS NOT COMMENCED WITHJ.,N 180 DAYS, OR, IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMJ~NCED. l HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AI"'D KNOW THE SAME TO BE TRUE AND CORRECf. ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AIJl'HORITY TUO~'VItJOJLA~Tll~';!ofiR~CiiAN;jtC~E,NLT o":<EooPiRisO~Vi·;SUI<O;Nri:s(,ooF.o· ANY:R OTHER STATE OR O THE PERFORMANCE AGREEMENT PERMISSION IS HER!l:BY GRANTED TO THE APPLICANT AS OWNER, CONTRACl'OR AND/OR THE AGENI' OF THE CONTRACI'OR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITIED TO AND REVIEWED BY THE BUILDING DEPAl<:TMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH AI.J, BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN LN 30.28.201 CRS AS AMENDED. THE SIGNER FURI'HER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE I.COATION, ERECflON, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOlD. THE ISSUANCE OF A PERMT BASED UPON PlANS, SPECIFICATIONS AND OTHE:R DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGUI.ATION OF THIS JURISD!CTION. THE l~EVIEW OF SUBM11TED PJ.,ANS AND SPECIFICATIONS AND IN'SPECfiONS CONDUCfED THEREAFTER DOES NOT c(msr!Tl.Tl'E AN ACCEPTANCE OF ANY RESPONSIBIL!T!ES OR UABLITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSI BILITY FOR THESE ITEMS AND IMPLEMENTATION DURJNG CONSTRUCTION RESTS SPEClFlCIA!..LY WITH THE ARTICfECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATNE AND IN SUPPORI' OF THE OWNERS LNTEREST. I HEREBY ACKNOWl-EDGE THAT I HAVE READ AND UNDERSTA."iD THE AGREEMENT ABOVE (!NlTIAL): :=? ~ The following items are required by Garfield County for a final inspection: L A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all IBC and IRC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupanc~ use and the issuance of a Certificate of Occupancy for the dwelling under building permit# tJ '] <(;:;;.....,__ Signature Bpapplicationfeb2006 Date ' VALUATION FEE DETERMINATION Applicant Address Date Encruma 0 ( l 'f E;« ~ Subdivision .:;C;;;R;:.;2;:;1:;;5::....:::...:...:__:.-"-=-,--_..;.---Lot/Block 10/30/2007 Contractor ~~~--------~~-- Finished (Livable Area): Main Upper Lower Other Total Basement: Unfinished Square Feet Valuation Conversion of Unfinished to Finished Total Valuation Garage: Valuation Crawl Space Valuation Decks/ Patios Valuation Covered Open Type of Construction: Occupancy: F-1 Valuation Total Valuation sf sf sf sf X $74.68 0 sf sf X $41.00 sf X $33.68 sf X $18.00 sf X $9.00 sf X $24.00 sf X $12.00 Commercial 3825 sf X $39.88 sf X sf X sf X sf X sf X SIS Cetp. 0 v-> 111€..11- 0.00 0.00 0.00 0.00 0.00 152,541.00 152,541.00 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24'"' and drawn to scale. I Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property Jines from each comer of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the finiLat with the proposed structure located within the envelope. Yes · 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), sh·eams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamyon the design. Yes No Not necessary for this project -'V,___ 3. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only"/or similar language? Yes No__ Not necessary for this project.__.:_'--- 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a 2 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Colorado Registered Engineer? Yes No__ Not necessary for this project Does the site plan indicate the location and direction of the State, County or private road accessi~ the property? Yes t/ Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design> Yes_V_ No Not necessary for this project __ If the building is a pre-engineered structure, is there a stamped, signed engineered foundattpn plan for this building? Yes_t/_ No__ Not necessary for this project __ Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and eartJ;J Yes__ No__ Not necessary for project_V_ Do the plans indicate the size and location of the ventilation openings for the attic, roof joist Spjj.CeS and soffits? Yes_V_ No__ Not necessary for this project __ Do the plans include design loads as required under the IBC or IRC for roof snowlo¢s, (a minimum of 40 pounds per square foot in Garfield County)? Yes_/_ . No__ Not necessary for this project __ Do the plans include design loads as required for floor loads under the IBC or IRC? Yes__ No__ Not necessary for this project V Does the plan include a building section drawing indicating foundation, wall, floor, and roof CO!)Struction? Yes_V_ No__ Not necessary for this project __ Is the wind speed and exposure design included in the plan? Yes L No__ Not necessary for this project __ Does the building section drawing include size and spacing of floor joists, wall studs, ceiling jeists, roof rafters or joists or trusses? . . Yes_/_ No__ Not necessary for this proJeCt __ Does the building section drawing or other detail include the method of positive connecyon of all columns and beams? Yes_V__ No__ Not necessary for this project __ 3 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top~ a flat roof? (Check applicable zone district for building height maximum) Yes_i/_ No__ Not necessary for this project __ Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes No Not necessary for this project / Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? / Yes__ No__ Not necessary for this project_\/_ Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC oriRC? Yes Not necessary for this project V No Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? / Yes__ No__ Not necessary for this project_V_ Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes__ No__ Not necessary for this project_L Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes__ No Not necessary for this project / Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) / Yes__ No__ Not necessary for this project--"t/c.___ Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? / Yes__ No__ Not necessary for this project_V_ Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? 4 Yes No Not necessary for this project ~ 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both ;exes? Yes__ No__ Not necessary for this project_./_ 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? / Yes__ No Not necessary for this project __ 28. Have two (2) complete sets of construction drawings been submitted with the applicajion? Yes v No 29. Have you designed or had this plan designed while considering building and other construytion code requirements? Yes_.,(_ No__ Not necessary for this project __ 30. Does the plan accurately indicate what you intend to construct and what will receive a final inm\ection by the Garfield County Building Department? Yes V · No ---- 31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For corner lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks. Yes v' No __ _ 32. Do you understand that approval for design and/or construction changes are required prior to ;he implementation of these changes? Yes v No ---- 33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your buildinjil permit? Yes;/ No ---- 34. Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and ocs;upancy of the building? Yes v No ---- 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must 5 36. 37. 38. 39. 40. 41. 42. comply yith the Uniform Codes? Yes_V__ No __ Are you aware that you must call iu for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30a.m. and 3:30p.m. Monday through Friday. Inspections are to be called in to 384-5003. Are you aware that requesting inspections on work that is not ready or not accessible will resylt in a $50.00 re-inspection fee? Yes_\/_ No ___ _ Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes / No ___ _ Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. Yes V No ___ _ Are you aware, that on the front of the building permit application you will need to fill in the Parcel/ Schedule Number for the lot you are applying for this permit on prior to submittaj.,ofthe building permit application? Your attention in this is appreciated. Yes V No ___ _ Do you know that the local fire )listric! may require you to submit plans for their review of fire safety issues? V No (Please check with the building department about this requirement) Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading pyrmit? Yes--"~~'---- 6 I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. Signature (evenings) Project Name:_:21 . .6Ai>:!;;z=~·~ff1~==:::_ _______ _ Project Address: q , ... :;\, "'"\!.-o" L.o~'"'~'J '?-o.,J.->--\ ') Note: St..!)\-, "'2.\. 2-o C) ·:r Date If you answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. *If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued. Bpcomm Feb2005 7 PLAN REVIEW CHECKLIST Applicant f.AJc trN It-- Building v{ngineered Foundation _Lbriveway Permit ~;t:<-•~ pt~-w-J.. ~Surveyed Site Plan ~Septic Permit and Setbacks ~Gradetropography 30% ~Attach Residential Plan Review List / Minimum Application Questionnaire -L;t-subdivision Plat Notes ~Fire Department Review Z aluation Determination/Fees _L_Red Line Plans/Stamps/Sticker ~Attach Conditions -V-Application Signed J Plan Reviewer To Sign Application _0arcel/Schedule No. J1L_ 40# Snow load Letter-Manf. Hms. · "/ Soils Report GENERAL NOTES: Date _ _L)...,O:..:._-_...I-'-1 -'-c;~7 __ _ Planning/Zoning ~roperty Line Setbacks ;31. '7" fl<:..n.e"J , CloS<k" f~r JS':o>p~.o.. V 30ft Stream Setbacks ~Flood Plain v/J3uilding Height ~Zoning Sign-off _cjz._Road Impact Fees -4-HOA/DRC Approval _Voradetropography 40% ~Planning Issues Stt.P ApfO.Civ'<-¢ ~Subdivision Plat Notes Assessor's Parcel NJ)_ f3 S-:273· 60-oiS Date /! /~/ 0 7 I 7 DING PERMIT CARD Job Address ..Ll..s::::O:..<::::t::-=::::~:.:;:2~~~2(.l.;..L_J...!::.~~~~~GJ~~!?,;_1fo::._:3~5:::___,,.-~7>17~--~r;-h:rl"\ Owner~ {J;J { kf!!sA) ~ Address CtL;;tJ:j ~ ,fp~~e #a ?l{~ ~ G.;;l. ~ Contractor ~ . Address~ M ~ Phone # d.85-;{ K>6 7 _____ Rear _____ RH _____ LH _____ Zoning --'---- INSPECTIONS Weatherproofing __________ _ Mechanical ____________ _ Electrical Rough (State) ________ _ Electric:~! F,iral .LState) . Final ·:?< · .?-f• 1 U /Checklist Completed? }...__/{)? Certificate Occupancy # CaLl 0:5 Date :2-· 2...:2 · 1 0 Septic System # __!JO;-f-/!...!lt ________ _ Date ___________ _ Underground Plumbing _____ _ Rough Plumbing _______ _ Framing ___________ _ Insulation __________ _ Roofing ___________ _ Final ___ -.-:-tl"t------- Other cf,i~ -iJ(B NOTES Drywall ___________ _ Gas Piping _________ _ (continue on back) 24 HOURS NOTICE REQUiRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date JssuedJJ{.~f.!r.J ..... Zoned Arca ....•.•..............•.•.•..... Permit No •.• ../Q .. "lY:.b.. AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. use \ji;\\J.t st~uqe b\t\\1, F /nk~c, '11Ci\\)rol '<~,ClS Q:>'ffit;>l(e.5'l><::'l'f0 Address or Legal Description • ( C ff, \";), f's:lltt.\\'.'ll..J\6 Owner h'l\fu\'1(\ C\\\.. h:(\t\0 Contracj"ourL--'.C;.,lc!J\),.),_'Sl:ill;<!:LC _____ _ Setback<;. Front Side Side Rear Tbis Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing [V\'l1J1 ~ 1~-q.o~ ~ Driveway Foundation Jl-)o·b'l ~ Underground Plumbing Insulation Rough Plumbing Drywall Chimney & Vent Electric Final (by State Inspector) Gas Piping Final.;>. -·'/-!0 0-f<X.N_,.;o Electric Rough (By State Inspector) Septic Final Framing Notes: (To include Roof in place and Windows and Doors installed). ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING- WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE For inspections Call384-5003 108 8th Street Glenwood Springs, Colorado APP~DO NOT DESTROY TillS CARll Date II By <tl} U C € IF PLAanE-COVEhJTH CLEAR PLASTIC Letter of Transmittal To: Jeffrey Schaefer Transmittal #: 9 Date: 10/19/2007 aJRPORATE OFFICES 2665 Westhollow Drive Houston. Texas 77082-1846 (261) 531-2800 Fa>t [281) 531-2888 EnCana Oil & Gas (USA), Inc. Republic Plaza Job: 2300 EnCana Oil & Gas (USA) Inc. 370 17th Street Suite 1700 Reference: 078876912000551 Denver, CO 80202 Ph: 720-876-5524 Fax: 720-876-6524 Subject: Revised IFC Drawings -Compressor Building -Parachute, CO WE ARE SENDING YOU r Shop drawings r Copy of letter ·Document Type r;r Attached r: Prints r• Change order Copies Date r: Via: r Plans r Specifications No. r Samples r;r E-mail DescriPtion Drawing 10/15/07 2300-01A1 REV 1 SPECS, ACCESSORIES AND COLOR/FINISH CHART ------------·-•••----·-·--••·---·-__ , __ , ____ , _____ , __________ ,,_,,,,_ --·•M•~~-------~-••••••-•"·o-••••-··---------• ---•"•''' ----~"·••--••••- Drawing 1 1 0/15/07 2300-01 A2 REV 1 FLOOR PLAN ···---··-·····----········-·-··· .. ···· ........ ___ -------· -·---·--·-·------··-·--··-·-"""""" ·-----···-·······-----------------·-·--·--.. ---...... Drawing 1 10/15/07 2300-01A3 REV 1 ELEVATIONS Drawing 1 10/15/07 2300-01A4 REV 1 ELEVATIONS Drawing 1 1 0/15/07 2300-01 A5 REV 1 CROSS SECTION ____ .... _ Drawing 1 8/23/07 2300-01A6 REV 1 SECTIONS Drawing 8/23/07 2300-01A7 REV 1 SECTIONS Drawing 10/15/07 2300-01F1 REV 1 ANCHOR BOLT PLAN Drawing 10/18/07 2300-01F2 REV 1 BASE PLATES DETAILS, SECTIONS AND ·--·---·--... ····----____ -------·--·······-·····f3EACTlON.§_ ............................................... -----·--· THESE ARE TRANSMITTED as checked below: r For approval .•1"0 !\1;i!\'J·~·"'~··.· '\'< r For your use r Approved as noted r As requested r Returned for corrections r For review and comment Br :.jii~uW!~f.QQri:ilfuctioh 1 '"' ~I:,. ,• ·· . ;: •. •i·-·,.•· · .... ,., .. : .. o.' ·.'·'·-·'<:·~ .:· ;. ·. ". ·:.:'. · ·, · r FOR BIDS DUE Remarks: Distribution: Mike Rasch (SISCORP) From: Mike Rasch (SISCORP) r Resubmit_ copies for approval r: Submit_ copies for distribution r Return _ corrected prints If enclosures are not as noted, kindly notify us at once. Page 1 of 1 Le1:ter of Transmittal To: Jeffrey Schaefer Transmittal#: 10 Date: 1 0/30/2007 CORPORAIE OFFICES 2665 Westhollow Drive Houston, Texas 77062-1646 (281) 531-2600. Fax: (281) 531-2888 EnCana Oii & Gas (USA), Inc. Republic Plaza Job: 2300 EnCana Oil & Gas (USA) Inc. 370 17th Street Suite 1700 Reference: 078876912000551 Denver, CO 80202 Ph: 720-876-5524 Fax: 720-876-6524 Subject: Revised IFC Drawing -Compressor Building -Parachute, CO WE ARE SENDING YOU P' Attached r Via: r Shop drawings r· Prints r Plans r Copy of letter r Change order r Specifications Document Type Copies Date No. Drawing 10/18/07 .2300-01A5 REV 2 r• For approval r For your use r Approved as noted r As requested r Returned for corrections r For review and comment r FOR BIDS DUE Remarks: Distribution: Mike Rasch (SISCORP) From: Mike Rasch (SISCORP) r Samples P' E-mail Descriotion CROSS SECTION r Resubmit _copies for approval r Submit_ copies for distribution r Return_ corrected prints If enclosures are not as noted, kindly notify us at once. Page 1 of 1 COLORADO STATE ELECIRICAL BOARD INSPECTION REPORT I CORRECTION NOTICE Date Received: 16-APR-09 Permit Number: 661189 Contractor/HomeOwner: MURDOCK ELECTRJC INC 10652 CR 215 Address: Type of Inspection: Final Action: Accepted Comments or Corrections: New vent system to be under new permit 1) make sure control panel is not in C1D21ocation (fuses) Inspectors Name: Cyrus Tuchscher Phone Number: 970-625-5085 Date: 16-APR-09 COLORADO STATE ELECTRICAL BOi\RD DEPARTMENT OF REGULATORY AGENCIES 1580 Logan St Suite 550 Denver, Colorado 80203-1941 Phone: (303) 894-2985 · https://www.dora.state.co.us/pls/real/Ep _Web _Inspection_ G UI .Process _Page \ 07l42-'* 9:7 0 :;-+ tlcJ50 10/27/2009 THUNDER MOUNTAIN TESTING ••• 2973 F. Road • Grand Junction, CO 81504 (970) 256-9965/ Cell (970) 210-7008 I FAX (970) 314-7067 Encauta Oil & Gas 2717 Cord 215, Suite 1000 Parachute, CO 8163 5 ATTN: Mr. Rick Barnett RE: Compressor Building CR215 Parachute, Colorado Dear Mr. Barnett, December 9, 2009 Permit #10742 As requested, structural steel special inspection was conducted per the IBC 2006 Edition -Chapter 17: Structural Tests and Special Inspection and Garfield County requirements. I arrived on site at 1:30PM. I met with you to review project requirements and high strength bolting specifications. The pre- manufactured metal building fabricator for this project is SIS Corporation ill Houston, Texas. The steei erector for this project is Dynamic Service Inc. in De Beque, Colorado. Visual inspection was conducted at the Roof Framing Plan level on the'!." & 7/8" ASTM A325 High Strength beam to beam, beam to column, and crane rail bolted connections. Project bolt tension requirements indicate "Turn-of -Nut" method as referenced· hr approved projectdrawings·provided·by SIS·· Corporation: Job No. 2300-01, File No. 2300-0 !A 1 Rev. 0 dated 7117/09. As a minhnum, 10% of all connections, but not less than two bolts per connection were inspected for prop()r bolt tension requirements and match marking techniques as stated in IBC requirements for periodic inspection: Table 1704.3, Item 2.b. Inspection was conducted at grid line E-G & 1 -4. All bolted connections inspected were observed to be adequately tensioned to project requirements. Respectfully Sub~~-d, p~ // .?(//_ //} y;J. I ;/}I -<::/#t7f<rJTI I !fl:it( ,;;.-Scott L. Maxwell · ICC Certified #0863569-Sl & S2 Thunder Mountain Testing DYNAMIC o.; C I~ V I C. C <..;. January 19. 2009 Encana Oil & Gas Mr. Rick Barnett 2717 County Road 21 5 \)arachute, CO Reference: Miclclle Fork Compressor Station: Compressor BuildingH->-Strength-8-oJt Torque Test Ill o t-;<.~ The following are results of a torque test administered by Dynamic Services, of the hi- strength bolts in the above mentioned building. The procedure used was a Turno:fthe-Nut process._ Procedure is as follows: I. Hanel tighten all stllJctural nuts and bolts with wrench or impacnvrench. ' Mark all nuts and bolts with paint marker in one straight line ii-om bolt to nut. J. Hammer wrench nuts another~~ turn, as allowed to see \vith t11arki.ng. \.'it'i.e ... 4. Torque wrench nuts to see resulting poundage. Results are as follows: I. Column to Rafter connections= 310 lbs. 2. Rafter to Rafter connections = 3 I 0 lbs. ). Crane Beam connections 4. Wind 8cnt connections = 2~0 lbs. = 280 lbs. If you have any questions regarding the results of this test or the test itself~ please reel i'ree to contact me at 307-IJ79-6442. )U~ i\t\:a Superin:dcnt /Western Slupc Drstrict Dynmnic Serv\c~::s Parcel Detail Page 1 of 5 Garfield County Assessor/Treasurer Parcel Detail Information t\$§e§SoJ:/Ire4!ilJmLPmpertyScilcrcl! I Assessor Subset Query I Ass~soLS.11les Search Clerk:&cJSemrdeLReGeJ?tionSe~JrGh Basic Bui]ding_Characteristics I Tax Infonnation Parcel Detail I Value Detail I Saleu;>etilcil I Residential/Commercial Improvement Detail Land Detail I Photographs I TaxArea II Account Number II Parcel Number II Mill Levy I I o26 II R460005 II 213527300015 II 36.682 I Owner Name and Mailing Address IENCANA OIL & GAS (USA) INC. C/0 LOGAN & FIRMINE 3615 S. HURON STREET, SUITE 200 !ENGLEWOOD, co 80110 I Legal Description lsECT,TWN,RNG:27-5-96 DESC: SEC 2 I ILOT 4(NET 27.16A) ALSO A TR IN SEC I 12&11 DESC: CONT 341.07 A SEC 3 S2NE, I ls2NW, S2 LOT 1(40.82A) DESC: I I2(40.69A) 3(40.57A) 4(40.44A) SEC 4 I ls2NE, S2NW, DESC: S2, LOT 1(40.33A) I2(40.21A) 3(40.11A) 4(39.99A) DESC: ISEC 5 S2NE, S2NW, S2 LOT 1(39.80A) I2(39.52A) DESC: 3(39.24A) 4(38.96A) !SEC'S 8,9,10 ALL SEC 14 W2NE, DESC: I INW, S2 SEC 15 W2NE, NENE, NW, S2 lsEC 16 ALL SEC DESC: 17 E2 SEC'S 121,22,23,24 ALL SEC 25 TR 137(107.06A) DESC: LOTS 1(37.84A) I2(37.42A) 6(6.55A) 7(11.27A) N2NE, http:/ /www.garcoact.com/assessor/parcel.asp?Parce1Number=2135273000 15 9/28/2007