Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-4-15-3615 Rosenfeld Residence Ironbridge PUD Lot 259, 279 Blue Heron Vista GWS, Colorado 1) SEE PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS. 2) ALL WORK SHALL COMPLY WITH THE 2009 INTERNATIONAL RESIDENTIAL CODE (IRC) AND THE MANUFACTURERS INSTALLATION SPECIFICATIONS. 3) GEOTECHNICAL ENGINEER SHALL FIELD VERIFY PLACEMENT OF COMPACTED STRUCTURAL FILL; 1500 PSF. PROVIDE ENGINEER SEALED APPROVAL REPORT AT UNDERGROUND PLUMBING INSPECTION. 4) STRUCTURAL ENGINEER SHALL FIELD VERIFY PLACEMENT OF REINFORCEMENT BARS, HOLD-DOWNS, AND TENDON INSTALLATION. PROVIDE ENGINEER SEALED APPROVAL REPORT AT UNDERGROUND PLUMBING INSPECTION. 5) STRUCTURAL ENGINEER SHALL FIELD VERIFY MEASURING OF POST TENSIONED SLAB CONSTRUCTION. PROVIDE ENGINEER SEALED APPROVAL REPORT PRIOR TO FRAMING INSPECTION. 6) ENGINEERED ROOF TRUSS SHOP DRAWINGS REQUIRED AT FRAME INSPECTION, 40 PSF. 7) ELECTRICAL ROUGH -1N APPROVAL IS REQUIRED FOR FRAMING INSPECTION. 8) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION.