Loading...
HomeMy WebLinkAboutApplication-Permit1 Project Address Garfield County Building & Planning Department 108 8th Street Suite 401 Glenwood Springs, CO 81801 - Phone: (970)945-8212 Fax: (970)384-3470 Parcel No. Issue Date: 8/5/2010 Expires: 02101/2011 Subdivision Section Township Range 2730 HWY 13 RIFLE, CO 212731300228 Owner Information Address Phone Cell Family of Faith Church Outreach PO BOX 95 Rifle CO 81650 970-625-3844 Contractor(s) Phone Primary Contractor Mark Opstein (970)825-3844 Yes Proposed Construction / Details converting old house to garage FEES DUE Fee Amount Residential Building Fee $23.50 Total: $23.50 Valuation: Total Sq Feet: $ 500.00 850 FEES PAID Inv Total Paytype Amt Paid Amt Due Inv # BLRE-8-10-20422 $ 23.50 Check # 2053 $23.50 $ 0.00 Required Inspections: For Inspections call ; 1(888)868-5306 nspectlon 1VR See Permit Record Building Department Copy Thursday, August 5, 2010 2 GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8th Street, Suite 401, Glenwood Springs, Co 81601 Phone: 970-945-8212 / Fax: 970-384-3470/ Inspection Line: 888-868-5306 www. garfeld-county. com 1 Parcel No: (this i2-12,7 for ation is available at the rs office 970-945-9134) I 73 39 2 Job Address: (if an address has not been assigned, please provide Cr, wy or Street Nam & City) or and legal description Z73<D ,-/-IvV )3 r'rJJJCC1. $Ibi C 3 Lot No: - • I' Block No: Subd./ Exemption: //1eCby 11't- X --f c>i? 4 Owner: (property owner) FA,Hily6,fG-111 dt - ()w�"r,zli Mailing,Address: Rr i: hj t' r° )36x -15 'j6'-© Ph: 170-( j8'�'/`I Alt Ph; 5 ContragorQ rl _0-4 i'h M lin$Address: rd Boil( q S i',�C�SI S P eJ 7042r-3 ��rvl4 Alt Ph: 6 Architec � e : r Mailing Address: Ph: Alt Ph: 7 Sq. Ft. of : uilding: 0 Sq. Ft. or Aer s f ot: JO Height: Na. of Floors: 8 Use of Building: ; // -- h w it, I. j liv ru_5-- re) b.- h,s .a,ciJ k -s a - S �,r, q . J 9 Describe Work: y r J y t� r # / �a /T` r" `' p. /11 ©J h 1 h) c 1 X x r ` h n- A Jif- V irf ---r k -S C (41-/] 17" 4- S. ' v- c t4-1- cT p S t y0 frr 10 Class of Work: ❑ New r, -Alteration ❑ Addition 11 Garage:/+ !1 _o Attached ❑ Detached Septic: NA o ISDS ra Community 12 Driveway Permit: 6/A Owners valuation of Work: S fr90s o O Authority. This application for a Building Permit must be signed by letter of authority, signed by the Owner, must be provided A Building Permit cannot be issued without proof of legal NOTICE the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate with this Application. and adequate access to rhe property for purposes of inspections by the Building Department. Electrical Permit, (2) County ISDS Permit, (3) another permit required for use on the property identified above, e.g. State or Discharge Permit. is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 CERTIFICATION contained above is true and correct. 1 understand that the Building Department accepts the Application, along with the plans based upon my certification as to accuracy. a Building Permit will be issued granting permission to me, as Owner, to construct the strucrure(s) and facilities detailed on and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield. County Building Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, are not in compliance with County Regulation(s) or any other applicable law. described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation work by the Building Department do not constitute an acceptance of responsibility or liability by the County of errors, omissions compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without THE NOTICE & CERTIFICATION ABOVE: Leval Access. Other Permits. Multiple separate permits may be required: (1) State County Highway/ Road Access or a State Wastewater Void Permit. A Building Permit becomes null and void if the work authorized days after commencement. I hereby certify that I have read this Application and that the information and specifications and other data submitted by me or on my behalf(submittals), Assuming completeness of the submittals and approval of this Application, the submittals reviewed by the Building Department In consideration of the issuance of the Building Permit, I agree that I Code, ISDS regulations and applicable land use regulations (County construction or use of the structures) and facility(ies), described above, I hereby grant permission to the Building Department to enter the property, Building Official from: (I) requiring the correction of errors in the submittals, of County Regulations) or any other applicable law. Review of this Application, including submittals, and inspections of the or discrepancies. As the Owner, I acknowledge that responsibility for limitation my architect designer, engineer and/ or builder. 1 HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND (JNDERSTAND OWNERS SIGNATRE DATE c6-5- ID C �. O kibalD STAFF USE ONLY Special Conditions: (Ofnd i lion Iti. Q c4 CecAuii on Blow -1-2-5 Adjusted Valuation: mat , Plan Check Fee. Permit Fee: a 3,,5c) Manu home Fee: __ Misc Fees: _______— ISDS Fee: ______. To al Fees: Fees Paid: Balance Due: BP�No & Issue Date: -3. ISD�Sj�No & Issued Date: --11- Setbacks: OCC Group: RT[0 Const Type: y -f" Zoning: ie BLDG DEPT: 1%// 4A I / e'l ////// PDLL(/NG DEPT: �yJ�/t/�_\J (��J /fir Lv _ _ `' AP- OVAL DATE APP OVAL DATE The following items are required by Garfield County for a final Inspection: 1) A final Electrical Inspection from the Colorado State Electrical Inspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to all IBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit, 7- /1 0 OWNERS SJNATU DATE Bapplicationdecember2007 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. TWO (2) SETS OF CONSTRUCTION DRAWINGS & TWO (2) SITE PLANS MUST BE SUBMITTEDFOR ALL APPLICATIONS. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. Engineered foundations may be required. 1 Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be in compliance with the 2009 IBC, IPC, IMC, IFGC, and IFC, 2009 IECC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property Iine and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes /VA 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes Not necessary for this project (n 3. Does the site plan indicate the location and direction of the State, County or private road accessing the property? Yes /)/A 4. Have you provided any RESOLUTIONS and/ or LAND USE PERMIT(S) associated with this property? Yes }( if Yes please provide a COPY. No 5. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes Not necessary for this project A 6. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? Yes Not necessary for this project X 2 7. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the building code or per stamped engineered design? Yes Not necessary for this project )( 8. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes Not necessary for this project( 9. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes Not necessary for project )( 10. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes Not necessary for this project x 11. Do the plans include design loads as required under the IBC or IRC for roof snowloads, (a minimum of 40 pounds per square foot in Garfield County)? Yes Not necessary for this project ) 12. Do the plans include design loads as required for floor loads under the IBC or IRC? Yes Not necessary for this project ,( 13. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes Not necessary for this project X 14. Is the wind speed and exposure design included in the plan? Yes Not necessary for this project 15. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes Not necessary for this project x 16. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes Not necessary for this project X 3 17. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Check applicable zone district for buildin height maximum) Yes Not necessary for this project 18. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes Not necessary for this project )K 19. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes Not necessary for this project X 20. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC or IRC? Yes Not necessary for this project 21. Does the plan include a window schedule or other verification that windows provide natural Tight and ventilation for all habitable rooms? Yes Not necessary for this project i( 22. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes Not necessary for this project ) 23. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes No Not necessary for this project 24. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) Yes Not necessary for this project X 25. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes Not necessary for this project 26. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes Not necessary for this project X 4 27. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes Not necessary for this project )( 28. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes Not necessary for this project X 29. Have two (2) complete sets of construction drawings been submitted with the application? Yes /1/A 30. Have you designed or had this plan designed while considering building and other construction code requirements? Yes /Y,A 31. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes/ A 32. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For corner lots see supplemental section 3-301 in the Garfield County Zoning Resolution for setbacks. Yes /l/A 33. Do you understand that approval for design and/or construction changes are required prior to the implementation of these changes? Yes /VA 34. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? Yes ) 35. Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes )( 36. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Codes? Yes 5 37. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business clay? Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 888-868-5306. YesX 38. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re -inspection fee? Yes X 39. Are you aware that prior to submittal of a building permit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right of way; a County Road and Bridge permit; a Colorado Dept. of Highway Permit including a Notice to Proceed; a permit from the federal government or any combination. You can contact the Road & Bridge Department at 625-8601. See Phone book for other agencies Yes )( 40. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. Yes /VA 41. Are you aware, that on the front of the building permit application you will need to fill in the Parcell Schedule Number for the lot you are applying for this permit on prior to submittal of the building permit application? Your attention in this is appreciated. Yes )( 42. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes NA (Please check with the building department about this requirement) 43. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be Eequired to obtain a grading permit? Yes Not necessary for this project 44. Did an Architect seal the plans for your commercial project? State Law requires any commercial project with occupancy of more than 10 persons as per Section 1004 of the IBC to prepare the plans and specifications for the project. Yes Not Necessary for this project 45. If you anticipate obtaining a water tap from the City of Rifle, please provide a letter indicating that the City will provide water service. No building permit application will be accepted without such a letter. Yes A/A 6 I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. Signature"pw,-,/,9 Date to a Phone: �, "air- 3 E-fr/ y (days); 6-- 36-1/ (evenings) Project Name: FP(- O,, ), 5t���z Project Address: a-73 c' h`"wy 13 fi/11,7 Go. 8-/6 5-0 Note: On any of these questions you may be required to provide this information. If required information is not supplied, delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. bpminrepcommJun2010 7 GARFIELD COUNTY BUILDING REQUIREMENTS Codes: 2009 IRC, IBC, IFGC, IMC, IPC, 2009IECC. Setbacks: Check subdivisions and zone district for setback requirements. Snowload (measured at the roof! Not ground): 40PSF up to 7000ft. elevation. 50PSF 7001ft to 8000ft. 75PSF 8001ftto 9000ft. 100PSF 9001 to 10000ft. !!! ALL SNOWLOADS ARE MEASURED HORIZONTALLY AT THE ROOF NOT THE GROUND!!! Seismic design category: B Weathering probability for concrete: Severe. Termite infestation probability: None to slight. Wind speed: 90mph. Decay probability: None to slight Wind Exposure: B or C (see section R301.2.1.4) Frost Depth: 36in. to 8000ft. elevation. 42in. 8001 and above. Winter Design Temperature: Minus 2 to 7000ft.; minus 16over 7000ft. elevation. Air Freezing Index: 2500deg F -days to 7000ft.; over 7000ft. to be determined by Building official Ice shield under-Iayment required. Mean Annual temp: Variable SEE 2009 IECC FOR INSULATION AND ENERGY REQUIREMENTS. 8