HomeMy WebLinkAboutApplicationGarfield County
Community Development Department
108 8`" Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-countv.com
BUILDING PERMIT
APPLICATION
TYPE OF CONSTRUCTION
Property Owner: Brent and Cara Maiolo Phone: (720 ) 369-6625
❑
Commercial/Multi-Family
❑
Demolition
IIII.
Residential (SF, Duplex, or Townhome)
0
Reroof
E
Manufactured Home (SF or Duplex)
0
Grading (locate all utilities prior to grading)
INVOLVED PARTIES
Property Owner: Brent and Cara Maiolo Phone: (720 ) 369-6625
Mailing Address: PO Box 895 Carbondale, CO 81623
Contractor: Brent Malolo (home owner build) Phone: ( 720 ) 369-6625
Mailing Address:
Architect:
Phone:
( )
Mailing Address:
Engineer:
Phone:
( )
Mailing Address:
Manufactured Home installer:
Mailing Address:
Phone:
( )
PROJECT NAME AND LOCATION
Describe Work: Single Family Home Construction
Job Address: TBD Mesa Ave. Carbondale, CO 81623
Assessor's Parcel Number:
Owner's Valuation
Sq.Ft of Building:
2393-283-03011 Sub. Lot 28-32 Block 10 3
of Work: $
1,079 sq.ft
100,000.00 Property
Size (Sq.Ft or Acres):
# of Floors: 1
.56 AC +/-
Height: 14 ft.
Class of Work:
■ New
• Alteration
❑ Addition
•
Repair
0 Move/Relocation
Garage:
0 Attached
0 Detached
Septic:
• ISDS
0 Community
Type of Heat:
• Natural Gas 0 Propane
• Electric
0 Other
Driveway Permit:
■ Exempt
In
Permit #:
Grading
Square Feet of Earthwork
Cubic Yards of Earthwork
Applicant
Address
Date
VALUATION FEE DETERMINATION
Brent & Cara Maioto
TBD Mesa Ave. Carbondale
9/19/2013
Subdivision
Lot/Block
Contractor
Finished (Livahie Area):
Main 984 sq.ft
Upper sq.ft
Lower sq.ft
Other sq.ft X $74.68
Total Square Feet 984 sq.ft
Total Valuation
Basement:
Unfinished
Conversion of Unfinished to Finished
Other
Total Valuation
Garage/Storage (wood framed)
Conversion of garage to finished living
Carport
Other
Total Valuation
Crawl Space
Total
Valuation
Decks/ Patios/Porches
Covered
Open
Other
Total Valuation
Type of Construction:
Occupancy:
Total Valuation
sq.ft X $41.00
sq.ft X $33.68
sq.f1 X
sq.ft X $18.00
sq.ft X $56.68
sq.ft X $12.00
sq.fl X
504 sq.ft X $9.00
sq.ft X $24.00
sq.ft X $12.00
sq.fl X
Commercial
sf X
sf X
sf X
sf X
sf X
sf X
Cooperton Townsite
Lots 28-32
Owner
73,485.12
0.00
0.00
4,536.00
0.00
0.00
Total Valuation 78,021.12
Building Plan Review
Description of Work: Single family dwelling on partial crawl space.
Bin #:
Location Address: MESA ST
CARBONDALE, CO
General Information
Contacts
•
Case Manager: David Bartholomew
Plan Case Number: BLDG -7-13-7630
Parcel: 239328303011
Application Date: 07/18/2013
Owner: Brent & Cara Maiolo
Applicant: Brent & Cara Maiolo
Applicant Phone: (970)456-5907 Email:
Building
Planning/Zoning
/Engineered
/
Foundation Property Line Setbacks
Driveway Permit 30ft Stream Setbacks
/ /
Surveyed Site Plan Flood Plain
Septic Permit and Setbacks / Building height
GradelTopography 30% Toning Sign -off
7 4/1
Attach Residential Plan Review List �'`I Road Impact Fees
Minimum Application Questionnare A-/,4 ,4 HOAIDRC Approval
Subdivision Plat Notes Grade/Topography 40%
/VI Fire Department Review tanning Issues
Valuation DeterminationlFees Subdivision Plat
7
Red Line Plans/Stamps/Sticker General Comments:
Attach Conditions
Application Signed
Plan Reviewer To Sign Application
Parcel/Schedule No.
4/.4 40# Snowload Letter - Manu. Homes
Soils Report
Tuesday, October 15, 2013
NOTICE
Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or
an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the
Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County ISDS Permit, (3)
another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a
State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of
the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the
Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply
with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, ISDS
regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit
may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s)
and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction
or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Division do not
constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the
Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations
rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or
builder.
J
I hereby acknowledge that I have read and understand the Notice and Certification above as well as
have provided the required Information which is correct and accurate to the best of my knowledge.
Brent and Cara Maiolo 7/9/13
P erty Own r Print and Si Date
OFFICIAL USE ONLY , ;_
Special Conditions:
Adjusted Valuation:
7B 02-1 ,.---
iz-
Plan Check Fee:
S�Sa.3?
Permit Fee:
0'46, 7C
Manu home Fee:
Misc Fees:
Total Fees:
13 97. l 4
Fees Paid: 34
b
Balance Due:
?Lug.
BP No:
Rl.2E-9,g 13
ISDS No:
51 0-- a4w-i
Setbacks:
Fj�; SO
OCC Group:
,
Const Type:
--g` C—'ii'),,
3i, 'U
BUILDING / PLANNING
DIVISION : /Pr
%
Signed Approval Dat
Pif .1q.t
O.39
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as any Septic or Road Impact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
I hereby acknowledge I have read, understand, and will abide by the requirements of this
checklist.
Brent and Cara Maiolo 7/912013
Property Owner Print and Sin Date