Loading...
HomeMy WebLinkAboutApplication - PermitGarfield County No. I /ooo:5 I Building & Sanitation Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Office 945-8212 Inspection Line 384-5003 Job Address: /?Cit--I 5 -2;cr; I Locality: 2137-153-00-009 Use of Building: Meter station (Skinner ridge) Owner: Chevron USA Contractor: \Z-:4---st<ss Steel Builders -- Amount of Permit: $1,713.61 Date: J-07--oo Clerk: -Jla--vJcr l 2 3 4 5 6 7 8 9 10 II 12 GARFIELD COUNTY BUILDING PERMIT AP P LICATION 108 8th Stree t, Suite 401 , Glenwood Springs , Co 8 1601 Phone: 970-945-8212 I Fax: 970-384-3470 I Inspection Line: 970-384-5003 www.garfield -county.com Parcel No: '0\l ~T -lS::,-CA? -OO'\ Job Address: .. ~ijf/f}:-:-1:"§--TJ'Ck l-· .~ ~ ::-'-;' -Lot No: Block No: Suuo./ E xe mption: o Altera tion o Addition o Detached o iSDS Garage: 1\J~ Septic: Driveway Permit: O wners valu ation of Work: $ NOTIC E No. of Floors: l o C ommuni Authority. This application for a Building Pennit must be s igned by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, mus t be provided with this Application. L egal Access. A Building Permit cannot be iss ued without proof of legal and adequate access to the property for purposes of inspections by th e Building Department. Other Permits. Multiple separate permits may be required : (I) State Electrical Permit, (2) County ISDS Pcnnit, (3) another permit required for use on the property id entified above, e.g. State or County Hi ghway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if th e work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a peri od of 180 days after commencement. CERTIFICATION DATE STAFF USE ONLY Special Conditions: Adjusted Valuation: Plan Check Fee: 675 Permit Fee: $"') }C38' Manu home Fee: fo Mise Fees: Balance Due: 31 'd-43 BP No & Issue Date: JSDS No & Issued Date: Total Fees: L \ 1'\)) Fees Paid: \ ·\O•':J- \~0·~4 Setbacks: OCCGroup: P--1 Const Type: Zoning: BLDGDEP'f: l .- PLNGDEPT: The following items are required by Garfield County for a final Inspection: 1) A fin al E lectrical Inspection from the Colorado State Electrical Inspector. 2) Permanent addre ss assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running w ater, non-absorbent kitchen floor covering, counter tops and finished walls , ready for stove and refrigerator; all nece ssary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps ov er three (3) risers , outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to all IBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e . weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. OWNERS SIGNATURE DATE Bappli ca tion sept emb er2007 VALUATION FEE DETERMINATION Applicant Address Date ..:C::,:h::e"-'vr:.::o.:.:n,...,.., __________ Subdivision Skinner Ridge Lot/Block ..:;1:;:2:;:/1:;:8:;/2c,:00'07?':;_---------Contractor Finished (Livable Area): Main Upper Lower Other Total Basement: Unfinished Square Feet Valuation Conversion of Unfinished to Finished Total Valuation Garage: Valuation Crawl Space Valuation Decks/ Patios Valuation Covered Open Type of Construction: Occupancy: F-1 Valuation Total Valuation sf sf sf sf X $74.68 0 sf sf X $41.00 sf X $33.68 sf X $18.00 sf X $9.00 sf X $24.00 sf X $12.00 Commercial 2700 sf X $39.88 sf X sf X sf X sf X sf X K&S Steel Bldrs 0.00 0.00 0.00 0.00 0.00 107,676.00 107,676.00 PLAN REVIEW CHECKLIST Applicant (_ h € , ) ((_C)!(:) Date \ 1--I<(' 0'] Building ~ngineered Foundation ___lL_Driveway Permit ~X •5\-v PllHI.,.A ~~ ---t,..L'S urveyed Site Plan Su... lJ IC.a t.Jv \o 1'101~ /¥-fl.G-5 rk:-Sept ic Permit and Setbacks klz_Grade/Topography 30% ~Attach Residential Plan Review List ~inimum Application Questionnaire ~Subdivisi on P lat Notes M..LFire Department Review _0aluation Determination/Fees d Red Line Plans/Stamps/Sticker tdL_Attach Co ndi tion s · Planning/Zoning ~roperty Line Setbacks /30ft Stream Setb a cks ----l.L"Building Height ~Zo ning Sign~off tltJ,.. ... Road Impact Fees ~HOAIDRC Approval 4 Grade/Topography 40% . Ft!tU... . fle~fr-~) \ _Alanrung Issues u"~ J ,::V Su..P t-J~\ . ~u bdiv isio n Plat Notes / s~e. Le.-~ ....JiohM_.. ..::> _v __ P:ApplicationSigned ··· · -·a V'Plan Re viewer To Sign App li cation __.t,.LParcel/Sch edule No. * 40# Snowload Letter-Man£. :Hms . GENERAL NOTES: GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. I Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required . Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC. Applicants are required to indicate appropriately and to submit completed checkJist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements , and utility easements showing distances to the property lines from each comer of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing . Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the fiLt with the proposed structure located within the envelope. Yes 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional sta_!TIJV>n the design. Yes No Not necessary for this project _?<.!:.....___ 3. Does the site plan indicate the location and direction of the State, County or private road accessin_g the property? Yes )'<., 4. Is the I.S .D .S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? 2 Yes ---No Not necessary for this project ~ 5. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? Yes X No Not necessary for this project. __ _ 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered desig~?/ Yes ~ No Not necessary for this project __ 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? 8. Yes No Not necessary for this project __ Do the plans indicate the location and size of ventilation openings for under floor crawl space6 the clearances required between wood and earth? Yes No__ Not necessary for project __ 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes_£ No__ Not necessary for this project __ 10. Do the plans include design loads as required under the IBC or IRC for roof snowloads, (a minimum of 40 pounds per square foot in Garfield County)? Yes~ No Not necessary for this project __ 11. Do the plans include design loads as required for floor loads under the IBC or IRC? Yes~ No Not necessary for this project __ 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes~ No Not necessary for this project __ 13. Is the wind speed and exposure design included in the plan? Yes No Not necessary for this project __ 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes~ No__ Not necessary for this project __ 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes~ No Not necessary for this project __ 3 16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Check applicable zone district for building height maximum) Yes X No Not necessary for this project __ 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes No Not necessary for this project~ 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? ~ Yes__ No__ Not necessary for this project_"'-__ 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC oriRC? Yes No Not necessary for this project K 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes__ No__ Not necessary for this project X 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? , / Yes__ No__ Not necessary for this project_X._ 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? , / Yes__ No Not necessary for this project._/\ __ 23 . Have all areas in the building been accurately identified for the intended use? (Occupa.!!Cy as identified in the IBC Chapter 3) Yes_;><.._ No__ Not necessary for this project. __ _ 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes__ No__ Not necessary for this project :><' 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No Not necessary for this project >( 4 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes No Not necessary for this project~ 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes No Not necessary for this project >( 28. Have two (2) complete sets of construction drawings been submitted with the appli~atj6n? Yes ~ No 29. Have you designed or had this plan designed while considering building and other construgn code requirements? Yes No__ Not necessary for this project __ 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspyction by the Garfield County Building Department? Yes "')<. No 31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For comer lots see supplemental section 5.05.03 in the Garfield County Zonin~solution for setbacks. Yes No ____ _ 32. Do you understand that approval for design and/or construction changes are required prior to the implementation of these changes? Yes~ No 33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your buildi~rmit? Yes No 34. Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and oc~~ancy of the building? Yes ;<.... No 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Codes? YesX No __ 5 36. 37. 38. 39. 40. 41. 42. 43. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30 a.m. and 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re-inspection fee? Yes* No ___ _ Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes X No ____ _ Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. Yes ><; No ____ _ Are you aware, that on the front of the building permit application you will need to fill in the Parcell Schedule Number for the lot you are applying for this permit on prior to submittal of the building permit application? Your attention in this is appreciated . Yes X No ___ _ Do you know that the local fir~ di~ct may require you to submit plans for their review offire safety issues? Yes ;;><-. No (Please check with the building department about this requirement) Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes X Did an Architect seal the plans for your commercial project? State Law requires any commercial project with occupancy of more than 10 persons as per Section 1004 of the IBC to prepare the plans and specifications for the project. ~ Yes No Not Necessary for this project--~ _ __.__ __ I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. 6 Signature Date I) I 1-s )t7;- (evenings) Project Address: _______________ _ Note: Ifyou answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C . Delay in proceeding with construction. *If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued. Bpcomrn October 2006 7 Jeff Kehr From: Sent: To: Cc: Subject: Knubel, Stephan [Stephan.Knubei@Williams.com] Tuesday, December 18, 2007 3:30 PM Andy Schwaller; Jeff Kehr; Julie Taylor Patterson , Scott C RE: Skinner Ridge Importance: High Thanks for the reply Andy. Page 1 of 3 Regarding the SUP, I just spoke with Scott Patterson, he is my co-worker and was the original land representative from Northwest working on this project. Scott told me that Garfield county advised us that we did not need an SUP on the project, since it was a FERC regulated project. Regarding the letter from Chevron, as I advised Julie Taylor in your office , we are building the meter station for Chevron on Chevron 's land. The details of the easement have not been competed, so they sent us a simple email authorizing us to begin construction. I explained this to Julie Taylor, she advised it was ok. I have attached below, a copy of the received email from Chevron. You may contact Paula Jensen at Chevron if you need more info regarding it. Do you think we can get this permit this week? Thanks, From: Jensen, Paula G [mailto:PaulaJensen@chevron.com] Sent: Friday, October 26, 2007 3:05 PM To: Patterson, Scott C Cc: Olmore, Kim X; Goldstein, Kevin J; Broussard, Rene J (RBroussard) Subject: RE: Skinner Ridge Meter Station -Additional Easement Needed Scott , v, 5 1c.J-'\. o .c. W" \\ \ ~~ th e ri ght of en t ry to p roceed wi th a ll aspects of cons t ructi on of t he S kinne r R id ge Pl ease fee l f ree to ca ll me if yo u need a nyt h ing furth er. Sorry for th e delay. Paul a Jense n A rea Manager -West a nd Rockies Chevro n Natur al Gas, Bus iness Devel opmen t Office 832-854-5090 Cell 281-726-1685 Stephan Knubel Land Representative Williams' Northwest Pipeline 801-584-6484 801-584-6518 fax 12118/2007 Stephan Knubel Land Representative Williams' Northwest Pipeline, GP P0Box58900 Salt Lake City, UT 8415&0900 GrJ/1 e-a.~ ~~ (V""' ~ 'CIP~nknubel""']l;am'rom To: Andy Schwaller From: Stephan Knubel Fax: 970-384-3470 Pages: 2 including cover Phone: 970-945-8212 Date: 11/20/2007 Re: Northwest pipeline building permit for CC: Skinner Ridge Meter Station 0 Urgent ft.1 For Review 0 Please Comment 0 Please Reply 0 Please Recycle • Comments: Mr. Schwaller, we had the building manufacturer prepare a letter with the required engineering stamp and seal. I have placed the original in the mail to you. Please let me know if this is going to be ok. Thanks for your help, ~lb~ Stephan Knubel ·· "'"""·-·--~·~ ... -·---·· ············--·--·-- 10/04/07 CO iJ03Dl SUL.U.:I-:G Sl.Zt.: CSTS ,15' >: 60' X 12'-9" RIFLE CO (Gtd-<FTF..LO} Th ~ ~: ~ s tc, C(':t ti fy that the above referenced bu.i 1 ding and :, ts component part;; hav;:: i)o?.~n <.18:; i •..J:·,l-.'j i"'lr.r; J:,:,l:nicnre.:.! b/ !dl hrnerican Systems, an A.ISC Certifi·~d !'1anufacturer, at .i.t:o t'USC C~J:tj fied facility. It has been designed .in accordance Hith the order documen::.s, ~.:: ~!2:-;cra.l accor·dance wi1:h the ninth edi.tion of the AISC "Manu.:ll of Steel Constn1ctJ.vn" ar;d VH} J.()86 Edil.:ion {~·iith 198'::1 amendments) of the l\ISI "Cold Formed Steel Design Manual" and 1-:itf. good engineeri.ng practice for tht:: fol.l.o•.d.ng loads. All Hclding is per the c'!f'rc·op: Late American V.1e1ding Society (AVlSJ code. ~~~~~rn\~g Code for rlpplication of design loads: IBC 2006 Ji'1'· •... ':::.'Tcms: ltrl.r,m: 1.1:'") St-iOVl: 1.10 SETSt"-1JC: 1.25 ··: .. ·" ,_,_ .. -...• :c.-:.-::;h':. ·='f. r\\8tC•l. bldg. ;;;Lructur,;; only <1S .supp.l..i.e-d by Fd_l .l\rr;er5.can Systems 20 PSF LOAL ........ . l 0 PS F' 90 HP.H EXP D S!~:J SHlC ZONE ........... S.:;==O. 436g; Sl""'O. 090g ~e1~mic Use Gro11p IT; Design Category C; Site Class D >·c)"Jii~.· StJO\'l LOJ'!D., .. ......... 75 PSF v;J>.T ;::_oor SNm'i LOAD ............. 75.05 PSf' sc·lely to the steej bt.:iJ.dinq e.nd J.:.s compon12nt specificalJ.y excludes any Mar 16 09 05:49p Scott L. Maxwell 970-314-7067 THUNDER MOUNTAIN TESTING ••• 2973 R Road + Grand Junction, CO 81504 (970) 256-9965/ Cell (970) 210-7008/ FAX (970) 314-7067 Schmueser & Associates, Inc. 1901 Railroad Avenue Rifle, CO 81650-3205 ATTN: Mr.PhilChandler RE: Skinner Ridge Meter Station 20011 CR 5 Rille, CO Dear Mr. ChancUer, February 26, 2008 As requested, structural steel special inspection was conducted per the IBC 2006 Edition-Chapter ! 7: Structural Tests and Special Inspection and Garfield County requirements. ! arrived on site at II :45 AM. I met with you to review project requirements and specifications. Visual inspection was conducted at the Roof Framing Plan level on the '~"•" ASTM A325 Higb Strength beam to beam and beam to column bolted connections. Project bolt tension requirements indicate "Turn-of nuf' method as referenced in the approved jobsite drawings provided by Steel wise LLC in Westminster, CO: Job# 3301-233812, Drawing No. PM5-SRR-M00010: Sheet No. Cl Oft-Bolt Tightening. As a minimum, 10% of all connections, but not less than 2 bolts per connection were inspected for proper tensioning and bolt match marking techniques liS stated in IBC requirements for periodic inspection. Inspection was conducted randomly between grid line A-E & I -4. Bolted connections inspected were observed to be adequately marked and tensioned per project requirements. c:;::.-·Scott . ax well A WS CWI #91 040201 ICC Certified #0863569-85 Thunder Mountain Testing p.2 No. ) ()'QD~ ~ ;;.~ M<-_ ~c-1-;to~ _., A"e"'o''' Pa"el No. 'GJ.\'3l-\ S3-C)J.I:)cf\ {(ffiJ If~ /5.2 ~ p r--~~ Date \-ffi-'"()o ~ \ B~ILI?ING PERMIT CA{ID V ~'"!-{J krl-t-~ St\Y\V\fr ~\d0r1 ?f' '11a ~ltLJE'' *~ '"'i ~ • II! ....... • ·v~ AddresstAltS dll(J€0C5LC ct-Phone# <g{)\-S~4·blo+ Contractor-k?U sWe\ bti\\clrJ') Addressfd 0\){)if}tn-dohlrnrphone #~-6)3.'6~~ ~~~b~· vnet~ · -=-.l,.- \11\ Rear RH LH Zoning ____ _ INSPECTIONS Soils Test------------ Footing -f Foundation l-IY:-&> gv\t Grout _________________ __ Underground Plumbing--------,- Rough P~u bin~ f-1t:f // Framin_g ~!1!41~ j-fitjP'tf lnsulatton _ _ 7 Roofing _____________ _ Drywall -------------Gas Piping ___________ __ NOTES ' ;1)~~ Weatherproofing ______________ _ Mechanical _____________ _k. __ ~/'J-.- Eiectrical Rough (State) --~---c~-----.Ji.-­ Eiectri~al ,fjn~State)~~~~f!Y-~!!f.krt­ Final 1-'-/J:fff{ /Checklist 9,191JI~~ Certificate Occupancy # -:-"""'' ::::<, r.--::..6.~--=~;-;;;;:::-=-- Date_ l~sr '~ -=AI~ Septic System # -------------- Date ------------- Final \. Other _________________ _ (continue on back) BUILDI~G PERMIT GARFIELD COUNTY, COLORADO ··.. ·.·~ Date Issued..l~~r..P.1.?. .. Zoned Area ............................... Permit No ... .l..~:'f!: ... : ........ . AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. · Use ____ ~------------~----------------------------------------- Address or Legal Description __ ,,_I ____________________ -;-,-----,-----;--::----,-,~--- OwnerCJQtJ/'t5f/ ' Contractor,kJ.> sfod BuJJ,.-5 Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD F f . .A 00 m.,,_,7·vv •(Vill Driveway Foundation / .J ~-V :if fJrY\ ;J{/ Underground Plumbing /{ Insulation II) A Rough Plumbing A Drywall /l)p. Chimney & Vent f ;1}/.f Gas Piping J1i.f-FinaiS-/1-D''fcp..,A A I+ Septic Final /1/, {- Framini/:1_A tl•-,v~~"¢~ 'lJ,, Notes: (To include R~-of in place and indow and Doors installe<j). 1--'UJ)q_ ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING- WHETHERINTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. /1 , /\ . THIS PERMIT IS NOT TRANSFERABLE APPROVED Date By _____ _ IF PLACED OUTSIDE -COVER WITH CLEAR PLASTIC Parcel Detail Page I of 5 Garfield County Assessor/Treasurer Parcel Detail Information Ass<;~smLit<:<ts\lr()t·PmrertyS~<Jrch I Assessor Subset Que_ry I A§.l!es~r Sales Search Ckrl<:_QI:_Rrcon:IGLRrc:rp_tiQJLS~a_r(:h Basic Building Characteristics I Tax Information Parcel Detail I Value Detail I Sales Detail I Residential/Commercial Improvement Detail Land Detail I Photographs I TaxArea II Account Number II Parcel Number II Mill Levy I I o29 II R290521 II 213715300009 II 28.203 I Owner Name and Mailing Address !cHEVRON USA INC lc;o CHEVRON TEXACO PROPERTY TAX IPOBOX285 !HOUSTON, TX 77001 Legal Description lsECT,TWN,RNG:1-5-97 DESC: I IS2NE,S2SW,N2SE,SWSE,N2N2SESE,LOTS 15(37 .54),6(37 .82 lsECT,TWN,RNG:l0-5-97 DESC: ALL lsECT,TWN,RNG: 11-5-97 DESC: ALL lsECT,TWN,RNG:12-5-97 DESC: NW, SW, IW2SE, W2NE, SENE, S2N2NENE, S2NENE lsECT,TWN,RNG:13-5-97 DESC: W2NE, INW, S2 SECT,TWN,RNG:13-5-98 DESC: ITR 68, LOTS 5(19.39), 6(19.53), 17(19.65),8(11.75) lsECT,TWN,RNG:14-5-97 DESC: ALL lsECT,TWN,RNG:14-5-98 DESC: LOT 15(11.28), 6(23.36), 7(8.01) lsECT,TWN,RNG:15-5-97 DESC: ALL I http://www. garcoact.com/ assessor/parcel.asp ?Parce!N umber=213 715 300009 12110/2007 Parcel Detail Page 2 of5 lsECT,TWN,RNG:15-5-98 DESC: LOTS 16(8.04), 7(8.32) lsECT,TWN,RNG:16-5-97 DESC: ALL ISECT,TWN,RNG:17-5-97 DESC: ALL ISECT,TWN,RNG:19-5-97 DESC: E2SW, lsE, LOTS 7(37.79), 8(37.99) lsECT,TWN,RNG:2-5-97 DESC: SW, S2SE, !LOTS 5(38.67), 6(38.96) lsECT,TWN,RNG:20-5-97 DESC: ALL lsECT,TWN,RNG:21-5-97 DESC: N2 lsECT,TWN,RNG:22-5-97 DESC: N2 lsECT,TWN,RNG:23-5-97 DESC: ALL lsECT,TWN,RNG:23-5-98 DESC: TR. 70, ITR 71' TR 72, SESE LOTS 14(8.59),5(8.02), lsECT,TWN,RNG:24-5-97 DESC: ALL lsECT,TWN,RNG:24-5-98 DESC: ALL ISECT,TWN,RNG:25-5-98 DESC: N2, SE, ITR. 101, LOTS 1(20.47), 2(20.58), 13(8.04), SECT,TWN,RNG:26-5-97 DESC: IALL SECT,TWN,RNG:26-5-98 DESC: TR 195, TR 96, TR 97, LOTS 1(29.30) 12(16.64), SECT,TWN,RNG:28-5-97 I IDESC: N2, SE SECT,TWN,RNG:29-5-97 IDESC: ALL SECT,TWN,RNG:3-5-97 DESC: ISWNE, S2NW, S2, LOT 8(40.38) lsECT,TWN,RNG:30-5-97 DESC: IE2,E2W2,LOTS 5(38.13), 16(3 8 .40) '7 (38. 62) ,8(3 8. 83) ISECT,TWN,RNG:31-5-97 DESC: IE2NW,NESW, LOTS 5(39.07), 6(39.34), 17(39.60), SECT,TWN,RNG:34-5-97 loESC: N2, SW, N2SE, LOTS 3(42.00), 14(41.79) SECT,TWN,RNG:36-5-98 DESC: INE, N2SE, SESE, LOTS 2(16.44), 14(3.10), 5(39.57), lsECT,TWN,RNG:4-5-97 DESC: S2N2, S2 lsECT,TWN,RNG:5-5-97 DESC: S2N2, http://www. garcoact.com/ assessor/parcel.asp ?Parce!N umber=213 715 300009 12/10/2007 Parcel Detail Page 3 of 5 ILOTS 6(40.80), 7(40.98), 8(41.15) I lsECT,TWN,RNG:9-5-97 DESC: ALL DESC: 17(38.10), 8(38.38) DESC: 8(39.87), 19(39.96) DESC: AKA: TRIUMPH CLAIMS 1#1 THRU 12, 15, 16, 21, PT OF DESC: 122, 23, 24 THRU 26, PT OF 27 THRU 130, 31-36, DESC: J.D. CLAIMS, PART loF 1, PT. OF #3, #4, PT. OF #5, IDESC: #6 THRU #8, F.D. CLAIMS, #1 Location I Physical Address: TWP 5 RANGE 97 SEC 15 I I Subdivision: I Land Acres: 17013.05 I I Land Sq Ft: 110 I Section Township II Range I 5 II 97 2 5 II 97 3 5 I 97 4 5 97 5 5 97 I 9 5 97 10 5 97 II 5 97 12 5 97 13 5 97 14 5 97 15 5 97 16 5 97 17 5 97 20 5 97 19 5 97 21 5 97 22 5 97 23 5 II 97 24 5 97 26 5 97 II II http://www .garcoact.cornlassessor/parcel.asp?ParcelNumber=213715300009 121!0/2007 Parcel Detail 28 5 II 97 I 29 5 I 97 I 30 5 97 I 31 5 97 I 34 I 5 97 I 13 II 5 98 I 14 I 5 98 15 5 98 23 5 98 24 5 98 25 5 98 26 5 98 I 36 5 98 Property Tax Valuation Information II Actual Value II Assessed Value I I Land: 277,99011 I Improvements: oil I Total: 277,99011 I F=I =====~S~al~e D~a~te~: I _I Sale Price: I Basic Building Characteristics Number of Residential lo Buildings: Number of Comm!Ind lo Buildings: No Building Records Found Tax Information Tax Year Transaction Type 2006 Tax Payment: Second Half 2006 Tax Payment: First Half 2006 Tax Amount 2005 Tax Payment: Second Half II II 80,6101 0 80,6101 I I Amount I ($1,126.42)1 ($1,126.42)1 $2,252.841 ($1,435.40)1 I http://www .garcoact.com/assessor/parcel.asp?Parce1Number=213 715300009 Page 4 of 5 12110/2007 Parcel Detail 2005 Tax Payment: First Half I ($1,435.40)1 2005 Tax Amount $2,870.801 2004 Tax Payment: Second Half ($1,652.71)1 2004 Tax Payment: First Half ($1,652.71)1 2004 Tax Amount $3,305.421 I 2003 Tax Payment: Second Half ($2,020.35)1 2003 Tax Payment: First Half ($2,020.35)1 2003 Tax Amount $4,040.701 2002 Tax Payment: Whole ($4,066.64)1 2002 Tax Amount $4,066.641 2001 Tax Payment: Whole ($4,032.02)1 2001 Tax Amount $4,032.021 2000 Tax Payment: Whole ($4,276.32)1 2000 Tax Amount I $4,276.321 1999 Tax Payment: Whole II ($5,297.94)1 1999 Tax Amount II $5,297.941 Top of Page Asses.)orJ:)at<!bas<-: S«archQpticms I Treasur,:r Database Search Options Cierk.& __ Recgnl~r!2at<tb<!seS.e.<trc.h Options Oartl.eld .. Cotlnty_HomePage Page 5 of 5 The Garfield County Assessor and Treasurer's Offices make every effort to collect and maintain accurate data. However, Good Turns Software and the Garfield County Assessor and Treasurer's Offices are unable to warrant any of the information herein contained. Copyright © 2005 -2006 Good Turns Software. All Rights Reserved. Database & Web Design by Good.TumsSof!w<!I:e. http://www. garcoact.com/ assessor/parcel.asp ?ParcelN umber=213 715 300009 12/10/2007