Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLMF-10-13-3018 Bagley Residence TBD CR 233 Silt, Colorado 1) SEE PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS. 2) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, 2000 PSF, (ATTACHED) 3) VERIFY DWELLING IS FIELD INSPECTED AND FACTORY BUILD LABEL IS AFFIXED. 4) PLUMBING/GAS PIPING MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER. 5) ELECTRICAL WORK MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 6) VERIFY C.D.O.H. INSTALLATION INSIGNIA IS AFFIXED PRIOR TO CO/FINAL INSPECTION. 7) FIRE DISTRICT FINAL APPROVAL REPORT I5 REQUIRED FOR CO/FINAL INSPECTION. 8) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION.