HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLMF-10-13-3018
Bagley Residence
TBD CR 233
Silt, Colorado
1) SEE PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS.
2) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, 2000 PSF, (ATTACHED)
3) VERIFY DWELLING IS FIELD INSPECTED AND FACTORY BUILD LABEL IS AFFIXED.
4) PLUMBING/GAS PIPING MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER.
5) ELECTRICAL WORK MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN.
6) VERIFY C.D.O.H. INSTALLATION INSIGNIA IS AFFIXED PRIOR TO CO/FINAL INSPECTION.
7) FIRE DISTRICT FINAL APPROVAL REPORT I5 REQUIRED FOR CO/FINAL INSPECTION.
8) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION.