Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-12-13-3089 EnCana/Hunter Ridge Energy Divide Rd Water Facility, Pump Bldg. Parachute, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. 3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT. 4) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, 3000 PSF. 5) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS PER RESOLUTION No. 2013-14. FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED FOR CO/FINAL INSPECTION. 6) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. PROVIDE APPROVAL REPORT AT FINAL INSPECTION 7) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED AT FRAMING INSPECTION. 8) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION. 9) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 10) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 11) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL. , / Gy