Loading...
HomeMy WebLinkAboutEngineer's Report 05.12.2014ENGINEERING SERVICES., LLC PROJECT: CO 180 40 010 Donald Green Source Gas Spring Valley Compressor Station Phone: 970-618-1521 Donald, Redi Engineering Services 225 Union Blvd. Suite 500 Phone: 720-459-7334 The specification for the Unisorb vibration isolation pit liner product indicated on the structural drawings, is a protective measure recommended to help dampen the propagation of machine vibrations in the vicinity of the compressor building, and is not required for structural integrity. Upon your approval, the isolation liner may be omitted and replaced with a 4mil plastic vapor barrier in accordance with Source Gas standard specifications to suit the project needs. Please let us know if any other questions or concerns. Regards, Matt Morgan, PE, SE Lead Structure Engineer Redi Engineering Services 4 mill liner inertia bocks httpi/email.rof nedversionslwebmail/11.0.18-RC/popup.php?wsid=08.. 4 mill liner inertia bocks From: Green, Donald Sent: Tue, Apr 29, 2014 at 6:54 am To: Mark DeWolfe (mark@kuerstenconstruction.com), Jeff Nelson Mark, SG engineering has reviewed the vibration liner that was designed into the SPVC project. Engineering's suggestion is that FirwqrmaelithsitIzialitra,amitEliner around the inertia blocks. Thanks Donald Green Project Manager 970-618-1521 970-255-7522 Donald.green@sourcegas.com