HomeMy WebLinkAboutEngineer's Report 05.12.2014ENGINEERING
SERVICES., LLC
PROJECT: CO 180 40 010
Donald Green
Source Gas
Spring Valley Compressor Station
Phone: 970-618-1521
Donald,
Redi Engineering Services
225 Union Blvd. Suite 500
Phone: 720-459-7334
The specification for the Unisorb vibration isolation pit liner product indicated on the structural
drawings, is a protective measure recommended to help dampen the propagation of machine
vibrations in the vicinity of the compressor building, and is not required for structural integrity.
Upon your approval, the isolation liner may be omitted and replaced with a 4mil plastic vapor
barrier in accordance with Source Gas standard specifications to suit the project needs. Please
let us know if any other questions or concerns.
Regards,
Matt Morgan, PE, SE
Lead Structure Engineer
Redi Engineering Services
4 mill liner inertia bocks httpi/email.rof nedversionslwebmail/11.0.18-RC/popup.php?wsid=08..
4 mill liner inertia bocks
From: Green, Donald
Sent: Tue, Apr 29, 2014 at 6:54 am
To: Mark DeWolfe (mark@kuerstenconstruction.com), Jeff Nelson
Mark,
SG engineering has reviewed the vibration liner that was designed into the SPVC project. Engineering's
suggestion is that FirwqrmaelithsitIzialitra,amitEliner around the inertia blocks.
Thanks
Donald Green
Project Manager
970-618-1521
970-255-7522
Donald.green@sourcegas.com