Loading...
HomeMy WebLinkAboutFoundation Inspection Report 11.06.2012November 6, 2012 Williams Midstream 4289 County Road 215 Parachute, CO 81635 Attention: Greg Wall P: 970.210.6397 E: Greg.WalI@Williams.com lrerracon Subject: Foundation Construction Observation and Testing Review Equipment Shelter Addition TXP1 Compression Plant Garfield County, Colorado Terracon Job No. AD121050 As requested, the Terracon representative tested subgrade soil preparation and structural fill compaction of the Equipment Shelter Addition at the TXP1 Compression Plant in Garfield County, Colorado on as requested, part-time basis September 26 and 27, 2012. We reviewed our records of fill compaction (attached) in preparation of this report. In summary, our review of this structure indicates construction in conformance with our recommendations and the structural drawing number SC -001, Rev.B by Samuel Engineering. Inc. dated 08/24/12 (their Job Number 12096-01). We appreciate the opportunity to provide geotechnical services. If we can be of further service, please call. Sincerely, Terracon Consultants, Inc. John P. Withers, P.E. Engineer (1 copy sent) FIELD DENSITY TEST REPORT Report Number: AD12I050.0002 Service Date: 09/26112 Report Date: 09/28/12 Task: lierracon 2308 Interstate Ave Grand Junction, CO 81505 970-245-4078 Client Elkhorn Construction Inc Attn: John Dick 2181 45 1/2 Road DeBeque, CO 81630 Project Parachute Creek GC Building Williams Gas Plant DeBeque, CO 81630 Project Number: AD 121050 Material Information Mat. No. 1 Proctor Ref. No. Classification and Description AD121050.0001 -314" Base Course Field Test Data Test No. Test Location Meter Skid 1 SW corner of Meter Skid 2 Re -test of Test No. 1 dated 9/26/12 3 NW corner of Meter Skid 4 SE comer of Meter Skid Datum: B.G. Below Grade Lift / Mat. Elev. No. Laboratory Test Method Lab Test Data Optimum Water Content (%) ASTM D1557 6.2 Probe Depth (in) 7' B.G. 1 8 7' B.G. 1 8 6' B.G. 1 8 6' B.G. 1 8 Wet Water Density Content (pct) (pct) Max. Lab Dry Unit Weight (pct) 139.9 Water Content (%) Project Requirements Water Content (%) +/- Minimum Compaction (%) 95 Dry Unit Percent Weight Compaction (pct) (%) 144.6 11.2 8.4 133.4 95 145.7 9.8 7 2 135.9 97 143.1 10.1 7.6 133.0 95 145.3 10.1 7.5 135.2 97 Serial No: Comments: Test and/or retest results on this report meet project requirements as noted above. Ramon Ortiz with Elkhorn Construction requested we stay on site until they were ready for test, 4 hours of standby time. Services: Terracon Rep.: Elias Acevedo Reported To: Ramon Ortiz with Elkhorn Construction Contractor: Elk Horn Report Distribution: (1) Elkhorn Construction Inc Test Methods: ASTM 06938 Started: Finished: Reviewed By: Robert Anderson Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Carr.. 4.r.12 Rev Page 1 of 1 FIELD DENSITY TEST REPORT Report Number: AD121050.0003 Service Date: 09'2712 Report Date: 09f28;12 Task: 1Terracon 2308 Interstate Ave Grand Junction, CO 81505 970-245-4078 Client Elkhorn Construction Inc Attn: John Dick 2I81 45 1r2 Road DeBeque, CO 81630 Project Parachute Creek GC Building Williams Gas Plant DeBeque, CO 81630 Project Number: AD121050 Material Information Mat. No. Proctor Ref. No. Classification and Description 1 AD121050.0001 -3.4" Base Course Field Test Data Test No. Test Location Meter Skid 1 SW corner of Meter Skid, subbase 2 NW corner of Meter Skid, subbase 3 Middle of Meter Skid, subbase 4 SE corner of Meter Skid, subbase 5 NE corner of Meter Skid, subbase 6 Middle of Meter Skid, subbase 7 North Middle of Meter Skid, subbase 8 South Middle of Meter Skid, subbase 9 NW corner of Meter Skid, subbase 10 Middle of Meter Skid, between Anchors Lift / Elev. Laboratory Test Method ASTM D 1557 Probe Mat. Depth No. (in) Lab Test Data Optimum Water Content (%) 6.2 Wet Water Density Content (Pci) (pcf) Max. Lab Dry Unit Weight (pci) 139.9 Project Requirements Water Content (%) +1-2 Minimum Com paction (%) 95 Water Dry Unit Percent Content Weight Compaction (%) (pcf) (%) 5' B.G. 1 8 143.5 7.6 5.6 135.9 97 5' B.G. 1 8 112.1 7.4 5.5 134.7 96 4' B.G. 1 8 145.9 8.4 6.1 I37.5 98 3' B.G. 1 8 142.5 8.3 6.1 134.2 96 2' B.G. 1 8 144.8 7.8 5.7 137.0 98 1' B.G. 1 8 143.4 7.7 5.7 135.7 97 Grade 1 8 142.7 9.1 6.9 133.5 95 Grade 1 8 146.0 7.7 5.6 138.3 99 S.G. 1 8 142.3 5.9 4.3 136.4 97 S.G. i 8 139.4 6.5 4.9 132.9 95 Datum: B.G. - Below Grade Serial No: Std. Cnt. M:664 Comments: Test and/or retest results on this report meet project requirements as noted above. Services: Terracon Rep.: Elias Acevedo Started: Reported To: Ramon Ortiz with Elkhorn Construction Finished: Contractor: Elk Horn Report Distribution: (I) Elkhorn Cansiniclion Inc Test Methods: ASTM D6938 Reviewed By: Std. Cnt. D: 2263 Robert Anderson Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 4.17.12. Rcti 5 Page 1 of 1