Loading...
HomeMy WebLinkAboutEmail CorrespondenceJim Wilson From: Brad Keller [BKeller@fciol.com] Sent: Friday, January 24, 2014 9:57 AM To: • Andy Schwalier; Matt Provost; Jim Wilson Cc: Doug Swann; Steve Jones; Darrin Case Subject: 10-12-031 - Clinic West - Permit Closeout Attachments: Back Flow Preventer Certifications.pdf; Boiler Inspection Certificates.pdf; Chlorine Bacteria Water Test.pdf; Electrical Coordination Study.PDF; Fire Flush Tests.pdf; PR-007.pdf; RFI -143 Fireplace Combustion Air.pdf Andy, As a follow up to our conversations, and some of the conversations had between Jim and Doug on site, I offer the following regarding closeout of the Permit for the Clinic West Project at 201 Sipprelle in Battlement Mesa, Colorado: 1. Regarding re -vegetation, due to the cold winter conditions, we will resume landscape operations in the spring, as soon as weather permits. To date, we have installed most of the irrigation system, graded and added topsoil and placed landscape boulders. Work in the spring will include finalizing the irrigation system, touching up final grading and placing plantings, turf and mulch. Until the work is complete, FCI will keep the Storm Water Permit open with the State, and will keep BMP's in place and monitor. 2. Regarding systems, as of this writing, all systems in the facility are complete and operational. We have received final Boiler inspections, Final Elevator Inspections, Generator Start up, Mechanical Systems Start ups etc... Over the next month, we will be balancing the system and the owner will be utilizing a private, 3`d party to verify this process. If so desired, we can produce copies of these reports to the county, albeit we don't usually get these requests from Building Officials, as it is not part of the IBC. 3. Finally, I have attached copies of the following: a. Electrical Coordination study from Eaton b. Fire Flush Inspection c. State Boiler Inspections d. Backflow Preventer Tests e. Bacteria / Water Tests f. RFI regarding Combustion Air g. PR regarding change to Fire Lite I want to thank you guys for all the help you've provided over the duration of this project, and look forward to a smooth close out. If there are any additional concerns please feel free to contact me directly. Regards. Bradford M. Keller Project Manager P. (970) 434-9093 / F. (970) 434-7583 C. (970)260-5130 FCI Constructer Inc. 1 Jim Wilson From: Brad Keller [BKeller@fciol.com] Sent: Wednesday, January 29, 2014 7:53 AM To: Andy Schwaller; Matt Provost; Jim Wilson Cc: Doug Swann; Darrin Case; Steve Jones Subject: FW: 2246-001 Battlement Mesa MOB Attachments: 2246-001-isp-01-28-14.pdf Gentlemen, believe Landmark will be getting you an original Mylar, but in the meantime, I thought I'd forward for your use. Regards. Bradford M. Keller Project Manager P. (970) 434-9093 / F. (970) 434-7583 C. (970)260-5130 -PCI Conitni tati,tam From: Doug Swann Sent: Tuesday, January 28, 2014 4:17 PM To: Brad Keller Cc: Darrin Case Subject: FW: 2246-001 Battlement Mesa MOB FYI From: Jeff Gustafson[mailto:jeffg@Mandmark-co.com] Sent: Tuesday, January 28, 2014 3:37 PM To: Doug Swann; Steve Jones Subject: 2246-001 Battlement Mesa MOB Gentlemen: Here is the Improvement Survey Plat. My plan is to get a mylar to the county and have it filed. They will then scan it and I can have them send me a copy with the filing information on it. I can then forward you a record copy as well as any number of hard copies. Please let me know if you have any questions or comments so I can address them and revise the survey before filing if necessary. Thanks, Jeff Jeff Gustafson, P.L.S. 1 Landmark Consultants, Inc p: 970-871-9494 ext 4 m: 970-819-4762 e: jeffg a(�landmark-co.com Jim Wilson From: Brad Keller [BKeller@fciol.com] Sent: Thursday, January 30, 2014 4:29 PM To: Andy Schwaller; Matt Provost; Jim Wilson Cc: Doug Swann; Darrin Case; Steve Jones Subject: FW: Battlement medical center Gentlemen, This is what we received from GarCo road and bridge. Let me know if this is sufficient. Regards. Bradford M. Keller Project Manager P. (970) 434-9093 / F. (970) 434-7583 C. (970)260-5130 • FC c-0n.lcuctazL,lae From: Dan Goin [mailto:dgoin@garfield-county.com] Sent: Thursday, January 30, 2014 3:42 PM To: Doug Swann Cc: Rayjean Kramer Subject: Battlement medical center Doug, After inspection of the driveway at the medical center it passed inspection per the permit requirements, and u are agreed to remove the construction driveway repair any curb damage and finish pouring sidewalk where this driveway is. If u need anything else or have any questions please call. Thanks Dan 1 Jim Wilson From: Rob Ferguson [opschief@gvfpd.org] Sent: Tuesday, January 28, 2014 3:43 PM To: Jim Wilson Subject: Battlement Mesa MOB Jim, The Final Fire Inspection is complete at 201 Sipprelle Dr., Parachute, CO. The Fire District has no objections allowing the building to be approved for occupancy from this fire side. Please let me know if you have any other questions. Rob Ferguson Deputy Fire Chief Grand Valley Fire Protection District 0124 Stone Quarry Road Parachute, CO 81635 Office 970-285-9119 Fax 970-285-9748 opschief@gyfod.org 1