Loading...
HomeMy WebLinkAbout2.0 Staff ReportI o NE L/4 SW t/4 Section 34, TownshiP 6 South, Range 92 West of the 6th Pr inc ipal l"ler id ian . Located f ive miles south of SiIt on CountY Road 331. A 58.9 acre Parcel to be sPlit into five (5) single familY lot sites- PROJECT NAME: REQUEST: OWNER: ENGINEER: SURVEYOR: LOCATION: SITE DATA: WATER: SEWER: ACCESS: ZONING: PROJECT INFORIVIATION AND STAFF COMMENTS Chipperfield Estates Final Plat Ken MattingleY Ray Walker Tim Ca1lahan Individual wells Individual sePtic Via County Roads A/R/RD systems 331 and 326 ADJACENT ZONING: I. RELATIONSHIP TO THE COIvIPREHENSIVE PLAN: The proPertY Constraints. )per five (5) found within growth. is located in District C (Rura1 Areas/l'linor Environmental District C allows for densities up to one (1) dwelling unit acres. Non-agricultural areas and non-productive cropland District C shall be considered the best able to absorb Nor th: South: East: West: A/R/RD A/R/RD A/R/RD A/R/RD to The II. DESCRIPTION OF THE PROPOSAL: A. Site Description: The slopes generally are different swales draining the same direction. pinionr/juniper vegetation with clayey soils. B. project Description: The present proposal is to divioe the 58.9 acre parcet into five lil single famify lots. A sketch plan was approved in September of L1BZ) tor a nine (9) Iot subdivision. Due to a limitation Ueing placed on the water augmentation plan of five (5) we1ls, the project had to be scaled down in size- III. IVIAJOR ISSUES AND CONCERNS: the north, with three area consists of A On June 6, 1983, the Board No. 83-t3l' aPProving the the following conditions: of County Commissioners approved Resolution Chipperfield Estates Preliminary Plan with I 2 The covenants will be recorded with the Final PIat. That a l-0r000 gallon water storage tank, with a freeze-proof stand pipe wit[r 2 L/2 inch national standard thread, be located centrailV ,ithin the subdivision and accessrble year round unless differenl type of storage can be agreed upon with the SiIt t'ire Distr ict. Plat notes and covenants must note limitations on water use. Lot sales will be restrict.ed until reservoirs are constructed. A soils and foundation study be completed prior to Final PIat. Additional easements be created to provide for electric powerlines. aaa a septic tank maintenance agreement to the covenants. A11 road culverts will be designed such that the ends extend at Ieast three (3) feet beyond the surface covering or are encased in concrete. The applicant witl pay $1,000 per new lot, toward the Silt Bridge improvement. -4- 3 4 5 6 7 8 9 o A11 conditions of approval have been met' IV. FINDINGS: I That the aPPlicant has conditions of aPProval approval. That the Gar f ield complied with aIl Preliminary PIan prior to the Board of County Commissioners o 2. V RECOMIvIENDATION: The planning Commission recommended approval on July 13, 1983. FinaI PIat meets the requirements County Subdivision Regulations of of Section 4.03 of the L979r ds amended. -5- I o GCPC - 7/13/83 Chipperfield Estates Final PIat Ken Mattingley Ray Walker Tim Callahan NE L/4 SW f/4 Section 34, Township6 South, Range 92 West of the 6thPrincipal Meridian. Located fivemiles south of Silt on County Road 331. A 58.9 acre parcel to be split intofive (5) single family lot sites. Individual wells Individual septic systems Via County Roads 331 and 326 A/R/RD PROJECT INFoRIVIATIoN AND STAFF CoMMENTS PROJECT NAME: REQUEST: OWNER: ENGINEER: SURVEYOR: LOCATTON: STTE DATA: WATER: SEWER: ACCESS: ZONTNG: ADJACENT ZONING:North: South: East: West: A/R/RD A/R/RD A/R/RD A/R/RD The property Constraints. )per five (5) found withingrowth. I. RELATIONSHIP TO THE COMPREHENSIVE PLAN: is located in District c (Rural Areas/tvlinor EnvironmentalDistrict c allows for densities up to one (1) dwelling unitacres. Non-agriculturar areas and non-productive croplandDistrict c shal1 be considered the best able to absorb rT. DESCRIPTION OF THE PROPOSAL: A. Site Description: The slopes generally are to thedifferent swares draining the same direction. The areapinionrzjuniper vegetation with clayey soils. north, with threeconsists of B. Project Description: The present proposal is to divide the 58.9 acreparcel into five (5) single family 1ots. A sketch plan was approved inSeptember of 1982, for a nine (9) lot subdivision. Due to a limitationbeing placed on the water augmentation plan of five (5) wells, the projecthad to be scaled down in size. IIT. MAJOR ISSUES AND CONCERNS: A.On No. Lhe June 6, 1983, the Board83-13I, approving thefollowing conditions: of County Commissioners approved Resolution Chipperf iel-d Estates preliminary plan with 1. The covenants will be recorded with the Final pIat.2. That a 10r000 ga1lon water storage tank, with a freeze-proofstand pipe with 2 L/2 inch national standard thread, be locatedcentrally within the subdivision and accessible year round unlessdifferent type of storage can be agreed upon with the Silt FireDistrict.3. Plat notes and covenants must note limitations on water use.4- Lot sales wilI be restricted until reservoirs are constructed.5. A soils and foundation study be completed prior to Final p1at.6. Additional easements be created to provide for erectricpowerlines. 7- Add a septic tank maintenance agreement to the covenants.8. A11 road culverts will be designed such that the ends extend atleast three (3) feet beyond the surface covering or are encasedin concrete.9. The applicant wiII pay $1,000 per new 1ot, toward the Silt Bridgeimprovement. 1- o GCPC . 7/13/83 A11 conditions of approval have been met. 1 That the cond i t ion approval. That the Gar field applicant has complied with all Preliminary Plan s of approval prior to the Board of County Commissioners o IV. FINDINGS: 2.Final PIat meets the requirements County Subdivision Regulations of of Section 4.03 of the L979r ds amended. V. RECOMMENDATION: Approval. -2-