Loading...
HomeMy WebLinkAboutEngineer Report- Floor Slab 12.02.2013m CONSULTING ENGINEERS Mechanical & Structural Engineering Design & Project Management File: G13070-5-2003-0 December 2, 2013 Mr. Robert Anderson Middle Fork Project Manager Encana Oil & Gas (USA) Inc. l43 Diamond Ave Parachute, CO 81635 Dear Mr. Anderson, MPA Consulting Engineers, Inc. 823 Grand Avenue, Suite #200 Glenwood Springs Colorado 81602 Tel (970) 928-8536 Email don.howanick@mpa-glenwood.com As requested, MPA Consulting Engineers conducted a site inspection of the rebar placement for the floor slab for the Middle Fork filter/manifold building on November 26, 2013. The inspection was limited to the floor slab and interior spread footings prior to placement of concrete and included measurements taken on site to verify dimensional compliance with the design drawings and visual inspection of the formwork. The floor slab of the filter/manifold building is approximately 66 feet long by 45 feet wide, and the entire floor slab is below grade approximately 3 feet to form a water containment system below the piping within the building. Dimensions and rebar placement were verified for the floor slab and interior footings to the extent possible. Please refer to Appendix A for photos taken during the site inspection. Dimensions were in compliance with the design drawings, and formwork appeared to be properly installed. Inspection of the interior spread footing rebar and floor slab rebar verified the formwork and rebar placement is in accordance to the design drawings and is acceptable. Please call with any questions or comments. Sincerely, MPA Consulting Engineers, Inc. Don Howanick; M.S., P.E. Principal Structural Engineer Page 1 of 5 APPENDIX A PHOTOS TAKEN DURING SITE INSPECTION NOVEMBER 26, 2013 FILTER/MANIFOLD BUILDING FLOOR SLAB REBAR PLACEMENT FILTER/MANIFOLD BUILDING FLOOR SLAB REBAR PLACEMENT Page 2 of 5 FLOOR SLAB AND INTERIOR SPREAD FOOTING REBAR INSTALLATION Page 3 of 5 FLOOR SLAB AND INTERIOR SPREAD FOOTING REBAR FLOOR SLAB AND INTERIOR SPREAD FOOTING REBAR INSTALLATION Page 4of5 REBAR INSTALLATION AT SUMP ON WEST WALL OF FILTER/MANIFOLD BUILDING REBAR INSTALLATION AT SUMP ON WEST WALL OF FILTER/MANIFOLD BUILDING Page 5 of 5