HomeMy WebLinkAboutApplication- PermitGarfield County
Building & Sanitation Department
108 8`17 Street, Suite #201 Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
nonn diQ to ado
Job Address , 1p- h .
Nature of Work Building Permi 70, f q bi - l Z�' q -R 1 -OCR �aChC
Use of Building r [ C I itt i _AQ p
Owner omunno ata I 1 Lq_z 14 Q Q�
Contractor
Amount of Permit $
Date
Clerk
•
Permit No.
GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 8'h Street, Suite 201, Glenwood Springs, CO 81601
Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003
Parcel/Schedule No. 2407-184-21-002 // R800030
Job Address:
28 Limberpine Circle, Parachute, CO 81635
1
Lot No.: 2 Block No.: 1 Subd.
/ Exemption Canyon View Sub. Phase One
2
Owner: Battlement Mesa Homes, Inc.
Address:
Box 6000, Battlement Mesa, CO 81636
Ph. 285-7330
Wk Ph:
3
Contractor: Battlement Mesa Homes
Address:
Box 6000, Battlement Mesa, CO 81636
Ph. 285-7330
Lic.No.
4
Architect / Engineer: Greg Robson
Address:
Box 6000, Battlement Mesa, CO 81636
Ph: 285-7330
Lic.No.
5
Sq. Ft. Of Building: 1,448 sf
Sq. Ft. Of Lot: 22 8�sf
Height: 21'
No. of Floors 1
6
Use of Building: Existing single-family detached dwelling with attached two -car garage.
7
Describe Work::, ofKitrps/Y ULvRoamtpbeaneaKitchen/Guet%dreamliknMinorIntepiordemo,mfnmeandfmfehes.
8
Class of Work: 0 New X Alteration 0 Remove
0 Addition 0 Move
9
Garage: 0 Single
Existin X Double
Carport: 0 Single
❑ Double
10
0 Driveway Permit 0 On -Site Sewage Disposal
Existing drive to private steet Existing BMMD city sewer
0 Site Plan
11
Valuation of Work:
Adjusted Valuations: $tti75
12
Special Conditions:
A SEPARATE
STATE OFCOLORADO.
THIS PERMIT
AUTHORIZED
OR WORK
ANY TIME
1 HEREBY
AND I VOW
LAWS GOVERNING
WHETHER
NOT PRESUME
PROVISI•
CON
��
NOTICE
ELECTRICAL PERMIT IS REQUIRED AND MUST
BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
I5 NOT COMMENCED WITHIN 180 DAYS, OR
IS SUSPENDED OR ABANDONED FOR A PERIOD
AFTER WORK IS COMMENCED.
CERTIFY THAT I HAVE READ AND EXAMINED THIS
THE SAME TO BE TRUE AND CORRECT ALL PROVISIONS
THIS TYPE OF WORK WILL BE COMPLETED
SPECIFIED HEREIN OR NOT. THE GRANTING OF
TO GIVE AUTHORITY TO VIOLATE OR CANCEL
OF ANY OTHER TATE OR LOCAL LAW REGULATING
BE ISSUED BY THE
IF CONSTRUCTION
OF 180 DAYS AT
APPLICATION
OF
WITH;
A PERMIT DOES
THE
ON.
3� o5
Plan Check F Permit Fee:
/S / z5f ,�, 1/7 q /
�A
Total Fee: Date Permit Issued:
OCC Group: Const. Type:
gnn/
•l
_jj•1CL
Zoning: Setbacks.
O• ' • THE P% '.RM• SFCONSTR
•/f/►\ t 4 ,t
S • • a '� R
. r . /3��
TE
4-/3-�
Manu. Home: ISDS No. & Fee:
BUa EPI' — P G. DEPT.
APPROVAL/ATE PROVAL/DATE
AGREEMENT
PERMISSION I5 HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS MAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT
IN CONSIDERATION OF TH E ISSU ANC E OFTHIS PERMIT, THESIGNER HEREBY AGREFSTOCOMPLY WITH ALL BUILDINGCODES AND LANDUSEREGULATIONS
ADOPTED BY G A RFIELDCOUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREESTHAT IF THE ABOVE SAID
ORDINANCES ARE NOT FULLY APPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OFTHE ABOVE DESCRIBEDSTRUCTURE, THE PERMIT
MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID
ISSUANCE OF A PERMIT BASED UPON PLANS. SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS. SPECIFICATIONS ANDOTHER DATA OR FOR PREVENTING BUILDING OPERATION BEING CARRIED
ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND NSPECTIONSCONDUL 1 ED THEREAFTER DO
RESPONSIBILITIES OR LIABILMES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES
IMPLEMENTATION DURING CONSTRUCTION IS SPECIFICALLY WITH THE ARCHITECT, DESIGNER BUILD
BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
1 HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL).
NOT CONSTITUTE AN ACCEPTANCE OF ANY
E RESPONSIBILITY FOR THESE ITEMS AND
AND OWNER. COMMENTS ARE INTENDED TO
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector.
2. Permanent address assigned by the Garfield County Building Department posted where
readily visible from access road.
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-
absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and
refrigerator, all necessary plumbing.
4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot & cold running
water, non-absorbent floors and walls finished and a privacy door.
5. All steps outside or inside over three (3) steps must have handrails, guardrails on
balconies or decks over 30" high constructed to all 1997 UBC requirements.
6. Outside grading done to where water will detour away from the building.
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration
of extenuating circumstances, i.e., weather, but a Certificate of Occupancy will not be
issued until all the required items are completed and a final inspection made.
8. A final inspection sign off by the Garfield County Road & Bridge Department for
driveway installation, where applicable; as well as any final sign off by the Fire District,
where applicable.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand agree to abide by the above conditions for occupancy, use nd{thheeissuance of a
Certificate of Occupancy for the dwelling under building permit #
3( 30 (oS
Signature Date
Bpcont03/2004
Plans to be included for a Building Permit, must be on drafting paper at least 18" x 24" and drawn
to scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations, all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade
line. A section showing in detail, from the bottom of the footing to the top of the roof, including
re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation,
sheeting, house wrap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per
square foot up to 7,000 feet in elevation, an 80 M.P.H. wind shear, wind exposure B, wind load of
15 pounds per square foot, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
All plans submitted must be in compliance with the 1997 UBC, UMC and 1997 UPC.
1. Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each corner of the proposed structure(s) prepared by
a licensed surveyor and has the surveyors signature and professional stamp on the
drawing? Properties with slopes of 30% or greater must be shown on the site plan.
Yes n/a
2. Does the site plan include, when applicable, the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjacent properties), streams or water courses? This information must be certified by a
licensed surveyor with their signature and professional stamp on the design.
Yes No Not Necessary For This Project X
3. Are the plans submitted for application construction drawings and not drawings that are
stamped or marked identifying them as "Not for construction, for permit issuance only",
"Approval drawings only", "For permit issuance only" or similar language?
Yes X No Not Necessary For This Project
4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a
Colorado Registered Engineer:
Yes No Not Necessary For This Project X
2
5. Does the site plan indicate the location and direction of the County or private road
accessing the property?
Yes n/a
6. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design?
Yes No Not Necessary For This Project X
7. If the building is a pre-engineered structure, is there a stamped, signed engineered
foundation plan for this building?
Yes No Not Necessary For This Project X
8. Do the plans indicate the location and size of ventilation opening for under floor crawl
spaces and the dearances required between wood and earth?
Yes No Not Necessary For This Project X
9. Do the plans indicate the size and location of ventilation openings for the attic, roof joist
spaces and soffits?
Yes No Not Necessary For This Project X
10. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea lever), floor
loads and wind loads?
Yes No Not Necessary For This Project X
11. Do the plans include design loads as required for floor loads under the Uniform Building
Code Chapter 16 and Tables 16A, 16B and 16C?
Yes No Not Necessary For This Project X
12. Does the plan include a building section drawing indicating foundation, wall, floor, and
roof construction?
Yes No Not Necessary For This Project X
13. Is the wind speed and exposure design included in the plan?
Yes No Not Necessary For This Project X
14. Does the building section drawing include size and spacing of floor joists, wall studs,
ceiling joists, roof rafters or joists or trusses?
Yes No Not Necessary For This Project X
15. Does the building section drawing or other detail include the method of positive connection
of all columns and beams?
Yes No Not Necessary For This Project X
3
16. Does the plan indicate the height of the building or proposed addition from the highest
point of the building or addition measured at mid span between the ridge and the eave
down to existing grade contours?
Yes No Not Necessary For This Project X
17. Does the plan include any stove or zero clearance fireplace planned for installation
including make and model and Colorado Phase II certifications or Phase II EPA
certification?
Yes No Not Necessary For This Project X
18. Does the plan include a masonry fireplace including a fireplace section indicating design
to comply with the Uniform Building Code Chapter 37?
Yes No Not Necessary For This Project X
19. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform
Building Code?
Yes X No Not Necessary For This Project
20. Does the plan include a window schedule or other verification that windows provide
natural light and ventilation for all habitable rooms?
Yes X No Not Necessary For This Project
21. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used
as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub
enclosures and specify safety glazing for these areas?
Yes No Not Necessary For This Project X
22. Do the plans include a complete design for all mechanical systems planned for installation
in the building?
Yes No Not Necessary For This Project X
23. Have all areas in the building been accurately identified for the intended use?
(Occupancy as identified in the Uniform Building Code Table 5-A)
Yes X No Not Necessary For This Project
24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that
may be in use in this building?
Yes No Not Necessary For This Project X
4
25: Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated on the plan?
Yes No Not Necessary For This Project X
26. Do the plans indicate the location and dimension of restroom facilities and if more than
four employees and both sexes are employed, facilities for both sexes?
Yes No Not Necessary For This Project X
27. Do the plans indicate that restrooms and access to the building are handicapped accessible?
Yes No Not Necessary For This Project X
28. Have two (2) complete sets of construction drawings been submitted with the application?
Yes X No
29. Have you designed or had the plan designed while considering building and other
construction code requirements?
Yes X No Not Necessary For This Project
30. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the Garfield County Building Department?
Yes X No
31. Do you understand that approval for design and/or construction changes are required
prior to the application of these changes?
Yes X No
32. Do you understand that the Building Department will collect a "Plan Review" fee from you
at the time of application submittal and that you will be required to pay the "Permit Fee"
as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your
building permit?
Yes X No
33. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occupancy and occupancy of the building?
Yes X No
34. Are you aware that the person signing the permit application, whether the "Owner",
"Agent of the Owner", "General Contractor", "Contractor" or otherwise, is the party
responsible for the project complying with the Uniform Building Code?
Yes X No
5
35: Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoons. All inspections must be called
in by 3:30 p.m. the day before. Failure to give twenty-four (24) hour notice for
inspections will delay your inspection one (1) day. Inspections are to be called in to
384-5003.
Yes X No
36. Are you aware that prior to issuance of a building permit, you are required to show proof
of a driveway access permit or obtain a statement from the Garfield County Road & Bridge
Department stating one is not necessary? You can contact the Road & Bridge Department
at 625-8601.
Yes n/a No
37. Do you understand that you will be required to hire a State of Colorado Licensed
Electrician and Plumber to perform installations and hookups? The license number will
be required at time of inspection.
Yes X No
38. Are you aware that on the front of the Building Permit Application , you will need to fill
in the Parcel/Schedule Number for the lot you are applying for this permit on prior to
issuance of a building permit? You attention in this is appreciated.
Yes X No
I hereby acknowledge that I have read, understand and answered these questions to the
st of my abil•
Signature Date
Phone: (970) 285-7330 (Days) N/A (Evenings)
Project Name: Kitchen/Guest Bedroom Remodel
Project Address: 28 Limberpine Circle, Parachute, CO 81635
Notes: Remodel of existing home Kitchen /Family Room area to become a Kitchen/ Guest Bedroom
area. Work includes removal and salvage of existing cabinetry, minor non -load bearing interior
partition wall demolition and reframing, relocation of existing electrical outlets and switching,
addition of smoke detector at Guest Bedroom area, drywall, painting, installation of existing
cabinetry and new kitchen countertops. Existing window provides egress, ventilation and natural
lighting at future Guest Bedroom area; existing windows at Kitchen/Nook provide ventilation and
natural lighting.
If you have answered "No" on any of the questions, you may be required to provide this
6
FAMILY ROOM
-n
I
L
AREA TO BE
REMODELED
r, M
ll�� , tet%i. Pt,. l Iffic 4
EXISTING
FLOOR FLAN
1/8° = i, -o„
1,448 s.P.
28 Limberpine Circle
Battlement Mesa, Colorado
No
Job
Owner �`
Contractor( UnQ
Assessor's Parcel No
BUILDING PER RD
• .. ress I i l_. L ��` I\QC�1
Si V t• 1� 1 J: �� \te ddress
•y�L77-1�U-�1-Dc��,
-3-Bloc-
Ccs-naThnifiefle #
Date
Address -, Phone #
Zoning
Setpacks: Front r RearRH
J/• tt3t /art_ n INSPECTIONS
LH
Soils Test
Footing Cf-
„2a
Foundation
Grout
Underground Plumbing
Rough Plumbi g NO '— 9
Framing/142 Phi—
Insulation
Roofing
Drywall
Gas Piping
A/k
NOTES
Weatherproofing
Mechanical
Electrical(State)U 4/05-41/0
/D�� ,yam ,
Electri I mal tate �f' C�f�"LJ
Final ecklist Completed?
Certificate Occupancy #
Date
Septic System #
Date
Final
Other
(continue on back)
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GA IELD COUNTY, COLORADO
Date Issued{ Zoned Area Permit No 1.
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and (IMMEDIATELY BECOMEBENULL AND VOID.
Use S1 I u�..�i..�Cyl� s �r- �a
Address or Legal Descriptions" S Lt 1 J ` p� 44$4,tCl__I r E" cih
Owner . Contractor D01..W
Setbacks Front Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing 64448' f
Driveway
Foundation "
Underground Plumbing
Insulation A/f
Rough Plumbing ••
Drywall NJ
Chimney & Vent 1
Electric Final (by State Inspector) `<-., .
Gas Piping
Final f5 -OS _
Electric Rough (By Stere Inspector)
Septic Final A/
Framing /to S c -a-F,a .M-,
(To include Roof in place and indows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
For Inspections Call 384-5003 108 8th Street Glenwood Springs, Colorado
APP ' 0 EDDO NOT DESTROY THIS CARD
IF PLACED OUTSIDE - COVER WITH CLEAR PLASTIC