Loading...
HomeMy WebLinkAboutApplication- PermitGarfield County Building & Sanitation Department 108 8t Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 Job Address j NO. rm Nature of Work Building Permi4 Use of Building 5/P `(\ / . O(� f �QQI ' , �} np, r' , Owner 5"51 (0 at r Contractor 'Pucr\2P� Amount of Permit $ q.a4 40-7-1S 1- Date Clerk a -I1 -DC - Ven Permit No: GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8° Street, Suite 201, Glenwood Springs, CO 81601 Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 970,1845003 Parcel/Schedule No: ( 07 1 1 AGREEMENT PERMISSION L4 HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PIANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMTr. THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IN THE ABOVE SAM ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE R SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER JIEQUIRING THE CORRECTION OP ERRORS IN SAID PIANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING / CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. ea THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LHAMMES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH TBE ARTICTECT, DESIGNER BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garfom.S03 R66:Aatate1(l 1 HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL): Job Address:u� 00 }5 G1--, vl -cif.) . t f arocl,u+Q cop. 1 Let Pio: Block No: Subd. / Exemption• 30. I (sciV,etA.Mikie Pk 2 Owner: G R� 5 Address -7 Rio Va. a4, (• r P10 5-23 . 555`p Wk Ph: 3 Contractor: Qi? R es Address: I 1.2nS •-\-E-4" Go Ph: el mos Lie. No. 4 Architect/Engl ee : 1-01iER Vkc.L-eY E-14 Addws: Cagan aa. Lk Ph: a4 87 7 g Lk. No. 5 ) Sq. FL of Building: 115 I Sq. Ft. of Lot: 7700 Height: 151-7" No. of Floors: 6 Use ' St�' W { _ .y 4 -- ra (,,_y r IYpRRh.o tom^^' 11 t a 7 tibe W rk: Describe Work: __ ff � � �,�.� l./ IV �.t-l� v 8 Class of Work: 9a New J ❑ Alteration a Removeve ❑ Addition o Move 9 10 Garage: o Single 40/1 Doable Carport: a Single o Double ar Driveway Permit 6> On -Site Sewage Disposal e-- Site Mau N A (Septic) 11 Valuation of Work: S Adjusted Valuatlons: 39A Gg 12 Special CondltlF ce QS. • Core: , O. at NOTICE A SEPARATE ELECTRICAL PERMIT LS REQUIRED AND MUST BE ISSUED BY TIE STATE OF COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR, IFj FOR A PERIOD OCONSTRUCTION10 DA S AT ANY TIMERK IS AFTER OR WORDCOMMENCED. est I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED TILTS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. TIE GRANTING OF .4 PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. • ie y J Q- ! 1 1 )7 Us- Plan Check Fee: z 3 . Permit Fee: ��� . Dated Permit Issued: Total Fee: 55-1 C3 YNED _ crq 3 Q 1229.2+ OCC Group: Const. Type: zoning: Setbacks: Manu. Home: RSDS No. & Fee: '7f. e\0 Cr -•F b O OWNER •AP•,••i, /DATE P'' i" AGREEMENT PERMISSION L4 HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PIANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMTr. THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IN THE ABOVE SAM ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE R SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER JIEQUIRING THE CORRECTION OP ERRORS IN SAID PIANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING / CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. ea THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LHAMMES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH TBE ARTICTECT, DESIGNER BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garfom.S03 R66:Aatate1(l 1 HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL): The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all IBC and IRC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL'A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupanc use and the issuance of a Certificate of Occupancy for the dwelling under building permit # �jFI Ci 7-11405 - VALUATION/FEE DETERMINATION ApplicanlE 424_ {rt tv 1 Address m45 nAFF Date 2- g•04; Finished (Livable Area): Main Upper Lower Other Total Square Feet //51 7'?. G8 Valuation Basement: Unfinished Conversion of Unfinished to Finished Plan Check Fee for Conversion Valuation Garage: Crawl Space: Valuation 3 `,9 j0 / 8 Valuation Decks/Patios: Covered Valuation Open Valuation /20 w l L Total Valuation Subdivision Jam, £k'J (12414.4% Phi Lot/Block 3Z g Contractor Qwhke 7Gb?, /silo 044s ee.eit guy,/ tn.. GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS for SINGLE FAMILY DWELLING CONSTRUCTION including NEW CONSTRUCTION ADDITIONS ALTERATIONS and MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. Adequate and complete information will prevent delays in the plan review process. Reviewing a plan and the discovery that required information has not been provided by the applicant may result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor may be required to provide this information before the plan review may proceed. This causes delays because other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. If you do not, it may be helpful to obtain a book titled "Dwelling Construction under the Uniform Building Code". This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the followingchecklist prior to and during design. Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a permit. Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floorjoists, wall studs and spacing, insulation, sheeting, house - rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation; an 80 M.P.H. windshear, wind exposure B, windload of 15 pounds per square foot, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC. I . Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. NOTE: 1063.1 (7.) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the /nvelope. Yes t/ 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building permit on is located on a corner lot. Special setbacks do,apply. Yes 3. Does the site plan include when applicable the location of the 1.S.D.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? Yes 4. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes ✓ 2 5. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes 6. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes 7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces's and soffits? Yes t/ 8. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wipd loads? Yes 9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction?/ Yes 10. Does the building section drawing include size and spacing offloorjoists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes ,/ 12. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing (undisturbed) grade contours? Yes 13. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase 11 certifications or phase 11 EPA certification? Yes No 14. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building copChapter 37? Yes No ✓ 15. Does the plan include a window schedule or other verification that egress/rescue windows 3 from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code'/ Yes ✓ No 16. Does the plan include a window schedule or other verification that windows provide natural light and ventilatio for all habitable rooms? Yes / No 17. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify ety glazing for these areas? Yes No 18. Is the location of all natural and liquid petroleum gas fumaces, boilers and water heaters indicated onle e plan? Yes No 19. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes / No 20. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will not be accepted without it. Yes / No 21. Will this be the only residential structure on the parcel? Yes / No If no -Explain: 22. Have two (2) complete sets of construction drawings been submitted with the application? Yes 23. Do you understand that the minimum dimensions a home can be on a lot is 20ft.wide and 20ft. long? / Yes ✓ No 24. Have you designed or had this plan designed while considering building and other construction code requirements? Yes ✓ No 25. Do your plans comply with all zoning rules and regulations in the County related to your 4 properties zone district? Yes ✓ No 26. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes / No 27. Do you understand that approval for design and/or construction changes are required prior to the application of these changes? Yes t/ No 28. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your building permit? Yes t/ No 29. Are you aware that twenty-four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale in the afternoons. All inspections must be called in by 3:30 p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will delay your inspection one (1) day. Inspections are to be called in to 384-5003. Yes / No 30. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $47 00 re-inpsection fee? Yes ✓ No 31. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and/occupancy of the building? Yes No 32. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform uilding Code? Yes No 33. Are you aware as part of the submittal for a building permit you are required to show proof of a driveway access permit from Garfield County Road & Bridge Department or if applicable the State Highway Department? Ifa permit is not necessary, then a letter stating that information is required. You can contact the Garfield County Road & Bridge Department at 625-8601 or refer to the phone book for the State Highway Departments 5 phone number. Yes No 34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at tir of applicable inspection. Yes No 35. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal of a building pe nit application? Your attention in this is appreciated. Yes ✓ No 36. Do you know that the local fire dir may require you to submit plans for their review of fire safety issues? Yes No (please check with the building department about this requirement) ,/0 r Rea `0 37. Are you aware, that if you receive your water and/or sewer from an Association, District, or Municipality you will be required to provide the County with a copy of the Tap Permit (or evidence of an a emption) at the time of the building permit application submittal? Yes No N/A 38. If you are within five (5) miles of the City of Rifle or the Town of Parachute, have you checked with them concerning wa r shed protection zone permit requirements for ISDS and other activities? Yes No N/A I hereby acknowledge that I have read, understand and answered these questions to the best of my ability. ‘12,44,1 n � v - ,� i/; a D S Signature of OwneDate Phone: '/70 .6.7„92 —S5515;laays); Project Name: (evenings) Project Address: 60 Y 7/ f Ct c� �f &r v t Notes: If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review 6 c JAM.14.2005 2:26PM BATTLEMENT MESA CO M0.707 P.7 BATTLEMENT MESA SERVICE ASSOCIATION ARCHITECTURAL COMMITTEE APPLICATION & CHECKLIST (for New Home Construction projects) Homeowner. (Pectef. iLLyne..g Home Mang Address: '%8(p VA•c.LFce Li- Cat dc4 &A R15 a0 HomePhone:Q10 6AS 5555 Work Phone(ifdesired): ProjectAddress: 8045 I:UFP Via, LU Lot: 3a Block: Subdivision: VAusY V ew Vu-462 ProductionHomeP1anName(ifapplicable): (X Horoebuflder. erose 4orn c1+C 2 gi— Business Phone: Q70• • G* 65 Fax(ifdesired): q20 • 5as - OID3 Businessl �TmgAddress: --/V0 C92D Submittal Date: Estimated Start Date: Estimated CompletionDate: SUBMITTAL REQUIREMENTS: Two Copies each of items 1, 2 & 4 need to be submitted. (Check -off items attached to the Application. Fill in spaces as indicated.) ✓ 1. Site Plan Drawing (1" = 10' or 1" = 20' scale) with the following information shown: ✓ Lot, Block & Subdivision name. ✓ Street Address of Project. Building Setback Lines (also fill-in the shortest distance between property line to the exterior wall closest to that property line). Please be aware that all Building Setback Lines are taken from your Property Line Pins!! Your Property Line is NOT the Curb Line!! Front Setback: Left Side Setback: Right Side Setback: Rear Setback: Dwelling Unit z3a .ani_.' - ao. 19.5' Garage a5' 4o. oi' 10' [ca. ail' ,_/ Uulity Easements. ✓ 55' Clear Site -Line at Intersection Corner Lots. ✓ Site Grading Elevations & Drainage. ✓ First (main) Floor Height in relation to top of street curb at front -center of lot. ___y____ Driveways (including width of driveway), Walkways, Patios, etc. ✓ Outbuildings. Page 2 of 6 JAN.14.2005 2:26PM BATTLEMENT MESA CO NO.707 P.8 2. Architectural Drawings (1/4" = 1' or 1/8" = 1' scale) with the following information shown. ✓ Floor Plan(s) with overall dimensions (fill-in the following square foot areas). First Floor Finished Living Area Second Floor Finished Living Area: Lower Floor Finished Living Area: Total Finished Living Area: 115 t square feet MA square feet NA square feet I l e I square feet Total Unfinished Living Area -6 square feet Garage Area: 3ei9 square feet ✓ Eni14ing Elevations Plans indicating doors, windows, exterior materials, building height, roof pitch, roof -mounted evaporative coolers, etc. (fill-in maxirrtmt height below). Maximum building height to highest ridge line or building structural projection 151- 7 " feet above top of street curb at front -center of your lot. ✓ Engineered (stamped) Foundation Plan. Outbuildings indicating dimensions, elevations and overall height to ridge line. ✓ 3. Exterior Materials (fill-in the selections below): Roofing Material: g..5 tt� 5 , Nifn}abg) Color: —;7, Primary Siding Material: 0 Color. Accent Siding Material: U , Color: V TrimMaterial: U J Color. /0 ✓ MasomyMaterial: t ' I, M' d % • • o . L4 --I/ . 'fes a AM Stucco Materials: Color: I, Front Door Material: Color: p c �C� _Z_ Garage DoorMaterial: Color: /L.L 1 fl COLOR SAMPLE COLOR SAMPLE COLOR. SAMPLE COLOR SAMPLE COLOR SAMPLE COLOR SAMPLE Page 3 of 6 JRN.14.2005 2:26PM BATTLEMENT MESA CO NO.707 P.9 ✓ 4. Landscape/Irrigation Plans with the following information: Planting Plan (indicate areas of irrigated lawn, tree placement, shrub beds, ground cover, etc.). V Plant Material listing by species of trees, shrubs and grasses. —� Groundcover Material with weed control barrier. Fences. Other Landscape Improvements (decks, site lighting, flag poles, etc.). Ng 5. Variance Request (if applicable) Give details below: 6. Residential Construction Monetary Deposit: �-latflagaAA-,e; I/We hereby acknowledge and understand that our failure to complete Home Construction, Improvement Projects or Landscaping Construction within the time constraints noted in Conditions 2. & 3. On Page 6 of this Application will result in a Notice and Opportunity for a Hearing before the BMSA Board of Directors. If I/We are found in violation of these Conditions at the Hearing it will result in a fine to the Owner of not less than 5500.00 per month for each full month in excess of the allotted completion time frame. VWe hereby acknowledge that Home Construction or Improvement Projects orLandscape Construction features which are built in non-conformance with this full application, including the Conditions of Approval noted on Page 6 of 6 herein, I/We will be cited by the BMSA/AC in written citation form at the time of' discovery. In extenuating circumstances a Variance may be requested from the BMSA/AC, provided such Variance request item is within the purview and approval jurisdiction of the BMSA/AC. If a Variance is not granted by the BMSA/AC and if the Non -Conforming Items are not corrected within 60 days after the date of written citation, I/We will be served Notice of a Hearing before the BMSA Board of Directors, and if I/We are found in 'violation of these Non -Conforming Items at the Hearing I/We will be fined a minimum of $500.00 per Non -Conforming Item. Notwithstanding the foregoing, I/We acknowledge that the BMSA Board of Director and/or Architectural Committee may pursue any legal remedy available in the event of a non-compliance. Page 4 of 6 JAN.14.2005 2:26PM BATTLEMENT MESA CO NO.707 P.10 Failure to pay fines levied as determined at the Hearing may also result in a Lien being placed on your Property or litigation Process initiated by the BMSA Board of Directors to secure conformance with this full Application and its respective Conditions Of Appr ovaL I/We understand that Architectural Committee approval does not constitute approval of the local building department, drainage design or structural soundness, nor does it constitute assurance that the plans comply with all applicable codes, regulations, ordinances and laws. I/We further acknowledge that any subsequent field changes which I/We may desire to the Home Construction or Improvement Projects of this original Application Submittal and the original Conditions of Approval issued by the BMSA/AC will require an additional Revised Application Submittal on our behalf, and that 1/We will not proceed with any subsequent field changes until a Revised Conditions of Approval have been issued to us by the BMSA/AC. Owner's Signature(s): 1W.1. Alt Sevin,/ -afirCI/ 4 'tu-frewa- Owner'sPrintedNamcs: Di F}NGI bl? 4LS t4 -asg, 'Date: 12- — l D — O 4 GRALF, kOm E`, Date: 12— if) - O 4 Builder's Signature: 1L--ADA.A4. 4-4' i - 0 -`at 401 ift 44.b-ecw th'rnm Builders Printed Name: Dta,fita DIrlaS'cA-oc piDate: 12..-1D — Page 5 of 6 JAN.14.2005 2:26PM BATTLEMENT MESA CO NO.707 P.11 This portion of the Application Form b to be completed by the Architectural Committee (not the Applicant). CONDITIONS OF APPROVAL or DISAPPROVAL t. No sitework or building construction may proceed on any Lot (including no preliminary site clearing, grubbing, grade alteration, storing of material, foundation excavation, extension ofunderground utilities, etc.) until the Project has received a Project approval from the Architectural Committee and bas been issued a Bnllrling Permit (as required by Garfield County for new home or Renovation projects). 2. All general building and site improvements construction for any Project shall be completed and shall have issued a Certificate of Occupancy from the Garfield County Building Department no later than one (1) year after the ismaore date of this Architectural Committee ApnrovaL 3. The complete landscaping and revegetation oftbe improved Lot, to specifically include the front, side and rear yard areas, shall be completed no lata than six (6) months from the date of the Certificate of Occupancy. 4. If the selection of colors and /or landscaping plans are not included with this application they must be submitted for approval before any action is taken to install the missing items. 5. 6'1' T A-rc efrc 6. 7. Application 1i • royal (initials of �y� f' ommittee Members): By: Application Approve ' Cons . • ction subject to the above conditions: By Chairman: Applatioenicd By: 11 Architectural Co - Members): v Applies{{i�on Denied for By Chan -Mao.: Date: rd -z 1. orf Page 6 of 6 12/27/04 12:43 FAX 3037819583 YEE & ASSOCIATES r+ . Yeh and Associates, Inc. Geotedinial Engineering Consultants 5700 E. Evros Avenue Denver, CO 80712 Tel.: (303) 7814590 Fax: (303) 7814583 December 27, 2004 Lb sa Fe nektf. t 002/003 0170 Md Ray Road Olm"ood Status, CO 81601 Td: (970) 384.1500 Fnc (970)384-1501 Job No. 24-116 Mr. Dan Penny Grace Homes, Inc. 786 Valley Court Grand Junction, CO 81606 Subject: Test Pit Observations, Lot011444 and 46, Battlement Mesa, Garfield County, Colorado. Reference: HP Geotech, "Preliminary Geotechnical Study, Proposed Roan Cliff Village Development, Parcels 2-6 and 2-6, Battlement Mesa, Garfield County, Colorado", dated September 16, 2002. Dear Mr. Penny: As requested, a representative of Yeh and Associates, Inc. observed backhoe test pits at the subject site on December 4, 2004 to investigate near surface conditions in order to provide recommendations for shallow foundation design and construction. The findings of our Investigation and recommendations for construction of residences on the subject lots are presented In this letter. A preliminary geotechnical report was conducted by HP Geotech In 2002, as referenced above. Yeh and Associates, Inc. work was done In accordance with our agreement for geotechnlcal engineering services for Grace Homes, Inc. dated November 6, 2004. Based on conversations with the client, single-family residences are planned on these lots. We anticipate the foundations will consist of a concrete mat with thickened edges. Basements are not planned for these residences. The lots are rough graded and curb and gutter Is installed. Streets were not paved at the time of our Investigation. Based on site observations, the lots are near construction grade and fill placement should be negligible. We observed three test pits located betwee 33/34 and 44/45. The soils exposed in the pit consisted of native silty to sandy clay to the maximum explored depth of approximately 4 feet. Results of swell -consolidation testing performed on three samples of the clay indicate the soils have low to moderate compressibility (-0.4 to -3.9 percent) when wetted under an applied pressure of 500 psi. A sieve analysis tests indicated that the native soils consist of approximately 66 to 89 percent low to moderate plasticity silt and clay, 12 to 22 percent sand, and 0 to 22 percent gravel. Atterberg Limit test results indicate liquid limits of 26 to 64 percent, plasticity indices of 3 to 23 percent. The native clay classifies as CL or CH by the Unified Soil Classification System. Groundwater was not encountered in the excavations and the soils were slightly moist to moist 12/27/04 12:49 FAX 3037819583 YEH & ASSOCIATES U003/003 Job No. 24-116 Based on our investigation, spread footings or a mat foundation constructed on the undisturbed natural soils can be designed for an allowable soil pressure of 1,500 psf for the above referenced lots. Soils encountered near anticipated foundation level exhibited compression during laboratory testing. Increases in moisture content due to irrigation or other sources could cause hydro -collapse of the subsoils resulting in foundation settlement. Care should be taken to provide drainage away from the residence. Recommendations for surface drainage are presented In the referenced report. Loose, disturbed soils encountered at foundation level should be removed and the foundation should be extended to undisturbed soils. Other design and construction recommendations presented in the above referenced geotechnical report should be followed. This study was conducted in accordance with generally accepted geotechnical engineering practices in this area at the time the Investigation was performed for use by the client for design and construction purposes. The recommendations submitted in this letter are based on our observations of the subsoils encountered In the test pits and laboratory test results. This study is based on the assumption that sobs at other portions of the lot are similar to the conditions encountered In the pits to the depths excavated. The risk of foundation movement may be greater than indicated In this report because of possible variations In the subsurface conditions. Expansive soils may occur n this site. If expansive clays are encountered In building areas, they may need to be removed or the footings designed with a minimum dead load pressure to reduce foundation and slab -on -grade movements. If the conditions encountered in foundation excavations vary from what is described In this report, we should be notified to re- evaluate our recommendations. We recommend on-site observation of excavations and foundation bearing strata by a representative of the geotechnical engineer. Please call if you have any questions. YEH AND ASSOCIATES, INC. O i� D. ee • y• 9 35832 O: a =; Richard D. Johnson, P.E. 2 of 2 PLAN REVIEW CHECKLIST Applicantc4tp.[ ,j Date 2-g•05 Building / ✓Engineered Foundation ge74 Driveway Permit '/Syed Site Plan grit Septic Permit and Setbacks Grade/Topography 30% ✓ttach Residential Plan Review List yC/Mm um Application Questionnaire Subdivision Plat Notes Wei4 Fire Department Review Planning/Zoning Property Line Setbacks 30ft Stream Setbacks Valuation Determination/Fees _ ✓Red Line Plans/Stamps/Sticker (/Attach Conditions Application Signed N4'7 ?Nut aed Sccon. ✓P/lan Reviewer To Sign Application VParceUSchedule No. 40# Snowload Letter- Manf. Hms. GENERAL NOTES: Flood Plain Building Height Zoning Sign -off Road Impact Fees HOA/DRC Approval Grade/Topography 40% Planning Issues Subdivision Plat Notes Jun 15 05 10:16a Battlement Mesa Metro Bis 9702859631 p.1 BATTLEMENT MESA METROPOLITAN DISTRICT 109 TAMARISK TRAIL / P.O. BOX 6116 / BATTLEMENT MESA, CO 81636 (970) 285-9050 / FAX (970) 285-9631 FACSIMILE TRANSMISSION Date:06/15/05 TO: Andy Schwaller COMPANY: Garfield County Building & Planning FAX NUMBER: 384-3470 FROM: Amie Arneson FAX NUMBER: 970-285-9631 MESSAGE We have excepted Phase 13 of the Valley View Village in Battlement Mesa. All Tap fees have been paid and Water & Sewer Service is approved for 45 Cliff View Lane. Thanks, Amie TOTAL NUMBER OF PAGES: 1)\\\C\I\jtj CONFIDENTIALITY NOTICE: This fax communication is intended only for the above-named recipient. If you have received this transmission in error, please call (970)285-9050 as soon as possible. It is unlawful to disclose, in any manner, such confidential information to anyone other than the person to whom it is directed. ..se), WestWater Engineering vor 2516 FORESIGHT CIRCLE, 81 GRAND JUNCTION, COLORADO 81505 MEMORANDUM TO: FROM: DATE: Ron Weidler, High Country Engineering Stephen LaBonde, WWF�Q� February 24, 2005 ✓✓ (970) 241-7076 ocavo FAX (970) 241-7097 FEB 2 5 2.505 GARFIELD ^OU10 111NG BUILDING 8 PLAN SUBJECT: Valley View Subdivision, Phase B - Water Meter Yokes It has been brought to our attention that the water meter yokes in Valley View Village, Phase B have been installed too low in the meter pits. The Battlement Mesa Metropolitan District's Standards require the water meter yokes to be from 12 -inches to 1 8 -inches below the meter pit cover. The project cannot be approved until all meter yokes have been brought to the proper grade that will require reexcavation of the meter pits and replacement of the yokes. Yoke extensions will not be allowed. In the interim, if a building permit is requested for a lot, the District will not allow a tap connection until the water meter yoke for said lot is raised to District Standards. Please schedule the Contractor to raise the yokes. cc: Ted Anderson, Battlement Mesa Metropolitan District Bruce Smith, Battlement Mesa Metropolitan District Amie Arneson, Battlement Mesa Metropolitan District Darin Carei, Grace Homes Dan Penny, Grace Homes Rick Davis, Mountain Valley Construction Roy Catt, Mays Construction Andy Schwalley, Garfield County 1 Lower Valley Engineering and Consulting, Inc. 42; Silver Plume Delve Fritts, CN 5252; Ph. (970)1191-20•0 Fax(970) 056205 937o Andy Schwaller Garfield County Building Department Fax: 970-384-3470 5-6-05 RE: Grace Homes Valley View Battlement Mesa, Single Family Residence at 0045 Cliff View Lane. Building Department: I have been retained by Grace Homes to provide engineering services for the above referenced project. I have supervised inspection of the foundations and walls prior to concrete placement to ensure conformance with the drawings that I prepared and were submitted for permit. The foundations are structurally adequate to satisfy the building codes currently adopted by Garfield County. Please contact me if there are any questions concerning this project. Signed, Darren R. Adams, P. E. Feb 17 2005 2:4OPM LOWER VOLLEY ENGINEERING 19701 858-2005 p.l Lowe! YYfldylkZiogromonlosaad Coosa Maur. Inc. Sh :WA I e,k i. kperten. ad Con*Ithq Scutes kr Caeerrrtsl ad ResS,t S Pr fled% ea OhrePlume Wive FriSihtelarsasfilen P1..(fl as*ywe Fetlnp; anis t01 Andy Schaller Garfield County Building Department Fax: 970-384-3470 Re: Grace Homes Valley View Subdivision, Battlement Mesa, Lots 32 and 33 2-17-05 Mr. Schaller, A question arose as to whether the fills placed on the above referenced Tots were suitable for the slab foundations designed so I was asked to examine these lots. Based upon bearing capacity tests and an examination of the fills for organic materials. I have determined that the fill placement and site preparation on the above referenced lots is sufficient to support the loads from the foundation that we designed. Signed, Darren R. Adams, P.E. Lower Valley Engineering and Consulting, Inc. No ce9c Job Address c ilS" (7/ l �} /TO Owner LTi GC Ls _t 1C f"� Assessor's Parcel N 7" /g/ _ _e' BpILDIRg neRD /212.c3 /I�UL� PERMITCMC-/D Contractor C 5 )Q S cks: - Fr Rear Soils Test Footing Foundation Grout Underground Plumt}ing 3 % 7-c5J Rough Plurrtbi Framing 1� Insulation kill 5'Z -0 ac i r\k Roofing Drywall s OS Gas Piping -'21 ) bicarettA- Address%S6 Address Date --/) C'S Phone ,rrat Phone # Zoning RH LH INSPECTIONS NOTES Dk 111.-1:{5i42 Weatherproofing Mechanical d _ //' Electrical Rough (State) 6 ' "� J�'7t Electrical�m� al State) 6 ! FinaI61'4-m hecklist Completed? ✓ Certificate Occupancy # Date Septic System # Date Final Other (continue on back)