Loading...
HomeMy WebLinkAboutApplication- PermitGarfield County Building & Sanitation Department 108 8th Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 Job Address C g\E Nature of Work Buildinz Permit q - Ct-Qj C)'1 Use of Building \�. _fix it j� Lbf 1))-n1� u ,4-�1— Owner. (AZ w — t �L NO. 313 Contractor CQ, jQU r Amount of Permit $ aa, Permit No: GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8'a Street, Suite 201, Glenwood Springs, CO 81601 Phone: 970-945-8212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003 Parcel/ScheduleNo: 2-3g32-0 Y 0 g 97 AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garfom.003 I� � � r 1 REEEBBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL): 9�- y Job Address: Oo1p 5 tk f.SS Rd. Co boh Ld ._ l C 1 Lot Norr 1 \, + lock No: Subd. / Esemptio, en / /e I s (WkpPh: c 2 O e: j�i1 m(LLAShA, Addre odo 8 Siv4 Ors Ph: 3,-8sez ttf(_J,a•I� 3 ?tractor! Mt�,u,F� &u;/d ozi � A ren s: L V7 CA,eb, Ph: Dot,9 Lie. No. 4 Architect/� ngi eer �, W�;le• 7 f, Add ess: orgomead&Cv.6Z--7y5 P SC$V )i(R570,6 5 Sq. Ft. of R ilTdlin?: Sq. F}. of ot: 3I j Height: No. of Floors: 6 Use of4u4Qinw ((W--ork: 7 DoquibIbe f- i nri11/51i bASe144 L 8 Class of Work: New ❑ Alteration o Remove o Addition o Move 9 10 Garage: , /� ❑ Single /y o Double Carport: o Single o Double o Driveway Permit n o On -Site Sewage Disposal ❑ Site Pian M /4 (Septic) 11 Valuation of Work: $ 7Soo° J Adjusted Valuations: $ 378 24 12 Special Conditions: NOTICE A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OF COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED I5 NOT COMMENCED WITHIN 180 DAYS, OR, IF CONSTRUCTION OR WORK 1S SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING pJNNSSSCTION OR THE PERFORMANCE OF7■/ ON •il UCT 4) (/�o` 5fi • Plan Check Fee: /O , (O Permit Fee: SZ .-"-- • Total Fee: Dated Permit Issued: 4 i7 .56- OC Gip Up: Const. Type: Zoning: Setbacks: Manu. Home: ISIS No. & Fee: • 23 ,,/ DEPT. G. DEPT. ' APPRO -- DATE APPROVAL/DATE AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garfom.003 I� � � r 1 REEEBBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL): 9�- y The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1997 UBC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, where applicable. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a CertiQate of Occupancy for t a dwelling under building permit # . )1 CU 1 Signature Date Bpcont03/2004 PLAN REVIEW CHECKLIST Applicant fil cUsblirl Date /o' %L -O4 Building II'' J�1 i4Engineered Foundation 1Q 4.Driveway Permit jj(. Surveyed Site Plan //jAr Septic Permit and Setbacks 4 4 . Grade/Topography 30% .....'--Attach Residential Plan Review List Minimum Application Questionnaire ,a, Subdivision Plat Notes Fire Department Review `Valuation Determination/Fees Red Line Plans/Stamps/Sticker ItiAttach Conditions ✓Application Signed ✓ P/lan Reviewer To Sign Application 1/Parcel/Schedule No. 40# Snowload Letter- Manf. Hms. GENERAL NOTES: 1351 x ZB z 37, g? S Planning/Zoning /, /¢Property Line Setbacks Oft Stream Setbacks Flood Plain Building Height Zoning Sign -off Road Impact Fees HOA/DRC Approval Grade/Topography 40% Planning Issues Subdivision Plat Notes < GARFIELD COUNTY BUILDING AND PLANNING o 970-945-8212 3 l MINIMUM APPLICATION REQUIREMENTS m �J for SINGLE FAMILY DWELLING CONSTRUCTION t 0"j including 8 NEW CONSTRUCTION ADDITIONS ALT E : RATIONS and MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. Adequate and complete information will prevent delays in the plan review process. Reviewing a plan and the discovery that required information has not been provided by the applicant may result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor may be required to provide this information before the plan review may proceed. This causes delays because other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. If you do not, it may be helpful to obtain a book titled "Dwelling Construction under the Uniform Building Code". This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a permit. Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must he designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, an 80 M.P.H. windshear, kind exposure B, windload of 15 pounds per square foot, and a 36 inch frost depth. All sheets to be identified by number and indexed. Ml of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC. 1. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. NOTE: 106.3.1 (7.) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes Opt 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applyi g for a building permit on is located on a comer lot. Special setbacks do apply. Yes uA 3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent properties), streams of water courses? Yes N/4 4. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes 5. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes 4/A 6. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearancJe required between wood and earth? Yes 7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces's and soffits? Yes fl/A Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind loads? Yes 1•17A Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes N /A- 10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes N /A 11. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes /A- 12. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing (undisturbed) grade contours? Yes (AO, 13. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? Yes No ✓ 14. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes No ✓ 15. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/v2 basements comply with the requirements of the Uniform Building Code? YesNo ', ze 4 t JP (io rJ Nc rep Civ i LIN NI 16. Does the plan include a window schedule or other verification that windows provide natural light and ventilation fof all habitable rooms? Yes ✓ No 17. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes Nl� No 18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes ti No 19. Do you understand that if you arc building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes r1! A No • 20. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will not be accepted without it. Yes . ✓ No 21. Will this be tale only residential structure on the parcel? Yes 14 /3 No t£no-Explain: 22. Have two (2) complete sets of construction drawings been submitted with the application? Yes ✓ 23. Do you understand that the minimum dimensions a home can be on a lot is 20£t.wide and 20ft. long`? Yes ,/ No 24. Have you designed or had this plan designed while considering building and other construction code requirements? Yes ✓ No 25. Do your plans comply with all zoning rules and regulations in the County related to your properties zone district? Yes ✓ No 26. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes V No 27. Do you understand that approval for design and/or construction changes are required prior to the application f these changes? Yes No 28. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact' or septic System" fees required, at the time you pick up your building permit? Yes "// No 29. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made from 7:30 .m. to 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-5003. Yes No 30. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $47.00 re -in section fee? Yes No 31. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building?/ Yes V No 32. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Building Code? Yes No 33. Are you aware that prior to submittal of a building permit application you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes 1\1/A No 34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at time of applicable inspection. Yes ✓ No 35. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal of a building permit ap hcation? Your attention in this is appreciated. Yes No 36. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes ✓ No (please check with the building department about this requirement) I hereby acknowledge that I have read, understand and answered these questions to the best of my ability. k -G9 Signature of Owner Phone: 3 % J "- 863 2.-- Dat7141/ Project Name: MC, (rota AMfl Ltiti Project Address: 009 Si CiJEEfrogASS'\ 6135—i) Cicitniqt4,6 C9 "((,Zaj Notes: If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minimum compliance with the adopted codes, the application inay be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. No 1n)`3 Job Ad Owner 11 WJ t Contractor 43Assessor's Parcel No3 :4'T --014 C [ of Date 10-x97 - nq BUILDING PE ARD eca nehr_,,-,t-Z1dr5 Address �y �7 Phone #379-WoQ Address,Ogrl L Phone Zoning etbacks: Front Rear RH L>OL� INSPECTIONS s Test oting Foundation Grout Underground Plumping Rough Plumbing nen* Framing /0-13 Insulation t.Sun,..rt Roofing Drywall /1-4 -01/771-- Gas O'/ i -Gas Piping NOTES LH Weatherproofing Mechanical Electrical Rough (State) Electrical Final ( tate) Final ecklist Completed Certificate Occupancy # Date Septic System # Date Final Other (continue on back) BUILDING PERMIT GARFIELD COUNTY, COLORADO Date Issu /i(....Zoned Area Permit No AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and MMEDIATELY BECOME NULL AND VOID. 1 \ � 93.3 Use Address , fl Descriptiof Qt Owner CiStnitt/ Contractor i ` % Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing Foundation Underground Plumbing InsulationCrla Rough Plumbing Exis/, Drywall // _9 _0 Chimney & Vent Electric Final (by State Inspector) a Gas Piping Final 3 e 0 G Electric Rough (By State Inspector) Septic Final Framing m —2y bc{p - (To include Roof in place and Windows and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado. APPROVEDDO NOT DESTR 1 Y THIS CARD Date0 y F PT * Ftl II1TTCIU _ rilVFD wnTia ri r AD Di A QT7f'