BOCC 12/10/84
PROJECT INFORMATION AND STAFF COMMENTS
Preliminary Plan ot the replat ot
Chelyn Acres Tract I
David H. Sivright
A part of the NW 1/4, Section 3,
T7S, R89W, more practically
described as a parcel located
approximately 1 1/2 miles south of
Glenwood Springs off of Van Dorn
Road (CR 149) .
SITE: A 5.47 acre tract to be split into
two single family lots.
WATER:
SEWER:
ACCESS:
EXISTING ZONING:
ADJACENT ZONING:
Domestic well
Individual sewage disposal
County Rd. 149 (Van Dorn Road)
W}VRD
North A/R/RD
South A/R/RD
East A/R/RD
West A/R/RD
I. RELATIONSHIP TO THE COMPREHENSIVE PLAN
The parcel is located with District B, Subdivision/Rural Serviceable
Area of the Comprehensive Plan.
II. DESCRIPTION OF THE PROPOSAL
A. The parcels are on a hillside above Four Mile CreeK with scrub
oax and sagebrusn as the predominant vegetation. There are
slopes in excess of 25% on the lower portion of tne parcel, witn
gentler sloping areas on the upper portion ot the parcel.
B. Project Description: It is proposed to split the 5.47 acre
parcel into two lots of 3.47 acres and 2.0 acres each. The
proposed 3.47 acre parcel would have the existing residence and
guesthouse on it. Both parcels would oe served oy a domestic
well that produces 14 gallons per minute. A new individual
sewage disposal system would be developed tor the 2.0 acre lot.
III.MAJOR CONCERNS AND ISSUES
A. Agency Comments:
1. The Colorado Geological Survey verbally noted that tne type
of soils in tne proposed 2.0 acre tract should have a soils
and foundation analysis prior to construction of a dwelling.
It was also recommended tnat all slopes over 25% oe avoided
for road or dwelling construction.
• •
2. The Colorado Division of Water Resources is reviewing the
late registration of the present well. Provided the
Division of Water Resources approves the well as a domestic
well, it will be necessary to have maintenance and access
easements described on the plat for the well and water line
to the 2.0 acre parcel.
3. The Soil Conservation Service concurred with the Colorado
Geologic Survey's recommendation for a soils and foundation
analysis prior to the building of a residence.
4. All utility companies have indicated that service can be
provided. Glenwood Electric has requested that a 25 foot
wide utility easement be created for any power lines
crossing the property with the powerline being in the center
of the easement.
B. Staff Comments:
1. The recommendations of the Colorado Geologic Survey can De
resolved by having the following plat note added to a Final
Plat:
A soils and foundation investigation shall be performed by a
registered professional engineer tor any residential
structures and be submitted with any building permit
application.
2. Prior to the submittal of a final plat, verification of the
Division of Water Resource's approval of the late
registration of the well for the intended uses should be
provided to the Department of Development.
3. If there is a main powerline crossing either proposed
parcel, a 25 toot wide, legally described utility easement
should be shown on the Final Plat.
IV. SUGGESTED FINDINGS
1. That the proper publication and notice was provided as required
by law.
2. That the public hearing before the Planning Commission was
extensive and complete, that all facts, matters and issues were
submitted and that all interested parties were heard at that
hearing.
3. That the Preliminary Plan conforms with the requirements of the
zone district in which the development is located.
4. That for the above stated and other reasons, the Preliminary Plan
is in the best interest of the morals, order, health, safety,
convenience and welfare of the citizens of Garfield County.
V. RECQIDATION
APPROVAL, with the following conditions:
1. That prior to Final Plat submittal, verification of a legal,
adequate domestic source of water for both lots be received from
the Division of Water Resources and provided to the Department of
Development.
• •
2. That the Final Plat have the following information:
a. Be entitled "Chelyn Acres, Tract 1, Replat"
b. Have legally a described easement drawn on the
plat for access and maintenance around the well and
for a waterline to the 2.0 acre parcel.
c. A plat note stating: A soils and foundation
investigation shall be performed by a registered
professional engineer for any residential structures
and be submitted with any building permit application.
3. That $200.00 for School Impact fees be submitted along with
the Final Plat.
4. That the new parcel be subject to the same Homeowners
Association by-laws and be a member of the Association.