Loading...
HomeMy WebLinkAboutApplication - Permit' 2 3 4 5 6 7 8 9 Describe Work: 10 Class of Work: 11 Garage: 12 GARFIELD COUNTY BUILDING PERMIT APPUCA TION 108 81h Street, Suite 401, Glenwood Springs, Co 81601 Phone: 970-945-8212/ Fax: 970-384-3470 /Inspection Line: 970-384-5003 www. garfield-county.com c Addition Septic: OS Owners valuation of o S NOTICE oCommunit Authority. This application foro Building Pmnit nust be signed by the Owoer of the propcny. de.!eribcd above. or an oulboriz.ed agent. If the signotun: below is not that of the Owner. 11 sepmate letter of authority, signed by the Owner. nust be provided with this Application. La;pl Actt51. A Building Permit cannot be issued wilhout proof of legal and adequate access 10 the propcny for purposes of inspections by the Buildin&: Dcpanmcnt. Other Permly. Multiple separate permits may be required : (I) Smtc Electrical Pcrmil. (2) County JSDS Penni!. (3) another permit requil'l!d for usc on the propcny identified abo\'C, e.g. State or County Highway/ Road Access oro Slalc WnstcWater Discharge Pcnnit Void Permit. A Building Permit becomes null and void If the work authoriz.ed is 1\0( commenced within 180 days of the dale of issuance and if work is suspended or ab:mdoiiCd for a period of 180 days afu:r cornrncncemcnt. CERTIFICATION I hcmly ccnify that I have read this Application and that the information contained above is true and conut. I understand that the Buildins Depwtl11:nt acccpiS the Application, olons with the pbm and s~ilications and other dai.D submincd by me or on my behalf (submittals). bnsed upon my ccrtllication as to IICCUillcy . Assuming completeness of the submittals and approwl of this Application, a Building Permit will be issued granting permission to me. as Owner. to constnlct thc structure( I) and facilities detailed on the submittals reviewed by the Building Depanmcnt- ln considcnuion of the issuance of the Building Penni!. I agree that l ond my agents will comply with provisions of any federal. sUite or local low rcgul.:!ling the work und the Gllriield County Building Code, ISDS regul.:!tions and applic:ublc land usc regulations (Councy Regulation(&)). I acknowledge that the Building Permit may be suspcndcd or revoked. upon notice from the Councy. if the IOCIIIion. consiJ'UCtion or use of the stnlcturc(s) and fiiCilit)'(ics), described above, an: not in compliance wilb County Rc'ulalion(s) or any other applic:nblc low, I hcn:by grant pc:rmiuion to the Building Depanmem to enter the property. described above. to inspect the work. l funher acknowledge that the issuance of the Building Pennit docs not prevent the: Bwlding Official from: (I) requiring the com:ction of errors in the submitmls . if ony. discovered after issWIIIIlC; or (2) stopping consuuction or usc of the sii'UCUirc(s) or facility(ics) if such is in violation of County Rcgulatioa(s) or lillY other upplicable law. Review of this Application. including submitlllls. and ins~tions of the work by the Building Department do not constitute on acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, lacknow ge that responsibility for compliance with fedcra~ sUite and local laws und County Regulations rest with me and my authorized agents, including without bmitnti hitcct dcsigl!Cr. engi or builder. I HERE WI..EDGE . AVE READ AND UNDERSTAND THE NOTICE & CERTIFICATION ABOVE; DATE_ STAFF USE ONLY - Special Conditions~ ~~i:N'-~ Adjusted Valuation: Plan Check Fee: Permit Fee: Manu home Fee: Mise Fees: ''19 ~ i .)'1 0 i'\ d-o '1 " '1.b 31 "l qSS"" ~ ?' ISDS Fee:e Y"( ~ ~otaiFees: Fees Paid:t_;l?o:e.:~ 3 a1ance Due: BP No & Issue Date: ISDS No & Issued Date: 53~¥ .. c.v"ett·t'l r~ L\L\~":)-rt3. tSb ~ol ~. ~J-~ 30;q .. ltt Setbacks: OCCGroup: (;unst Type: Zoning: :lAte BLDG DEPT: PLNGDEPT: _ll.L ik ~ _3.. ri..'-l -os-APP~~k 3 <J\.1 '()~ APPR_N\7!1) DATE DATE . .. Gl{<f.a)~/::I ~i1'1-~) bl' 'W£ Sf \ .J.:.... ~-t..l -;1) 20-'l'e~ <i<d ~g ·-cLo-e 1/> hL1/rtP ,go _/1 /r: /. GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS For SINGLE FAMILY DWELLING CONSTRUCTION Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a permit. Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with \ decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line and original grade. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required . A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7 ,000 feet in elevation, a 90 M.P.H. wind speed, wind exposure B or C, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IRC. 1. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each comer of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. (NOTE Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft . of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within~nvelope . Yes 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building pennit on is located on a comer lot. Special setbac~ apply. Yes._-~~~-- 3. Does the site plan include when applicable the location of the I.S.D .S . (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent pVPerties), streams or water courses? Yes. __ '-~+-- 4 . Does the site plan indicate the location and direction of the County or private road accessing the property? 2 Yes X:.::: 5. Are you aware that prior to submittal of a building permit application you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Depa ~t 625-8601. Yes._~--&-~-- 6 . Do the plans include a foundation plan indicating the size, location and spacing of all reinforcinv eel in accordance with the IRC or per stamped engineered design? Yes._~A-~-- 7. Do the plans indicate the location and s ize of ventilation openings for under floor crawl spaces an~e clearances required between wood and earth? Yes. __ 6____,...._ __ 8 . Do the plans indicate the size and location of ventilation openings for the attic, roof joist ~:sees an~fits? 9. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 fe et above sea level), floor ~::s and itd loads? 1 0. Does the plan include a building section drawing indicating foundation, wall , floor, and roof constructio ~ Yes~ __ A,....;._ __ _ 11. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof ers or joists or trusses? Yes. __ ...L......l~--- 12. section drawing or other detail include the method of positive connection and beams? 13 . Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a fl~f? (Building height measurement usually not to exceed 25 feet) Yes. _ __,A--~--- 14. Does the plan include any stove or zero clearance fireplace planned for installation including 3 I 5. 16. 17. 18. 19. 20. 21. 22. 23. make an~odel and Colorado Phase II certifications or phase II EPA certification? Yes A_ . No ______ _ Does the plan include a masonry fireplace including a fireplace section indicating design to comply w~e IRC? Yes ~ No _________ _ Does the plan include a window schedule or other verification that egress/rescue windows from sleepi{IVooms and/or basements comply with the requirements of the IRC? Yes A-No. __________ _ Does the plan include a window schedule or other verification that windows provide natural light and vwdlation for all habitable rooms? Yes IS_ No _________ _ Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing inunediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and speci~ety glazing for these areas? Yes ~ No ___________ _ Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated. !the plan? Yes ~ No ___________ _ Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes ~:~or c')rnts? No __________ _ Do you understand that if you belong to a Homeowners Association (HOA), it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will be accepted without it, but you run the risk of the HOA bringing action to enforce the covenants, which can result in revocation of permit issued. Additionally, your Plan Review fee is not refundable if the plans have been reviewed by the Building Department prior to any action by the HOA that requires either revocation or substantial ification of the plans. Yes No ___________ __ Will this b~nly residential structure on the parcel? Yes ~ No Ifno-Explain: ___________ _ Have two!P':omplete sets of construction drawings been submitted with the application? Yes._--4~~-- 4 24. 25 . 26. 27. 28 . 29 . 30. 31. 32. Do you understand that the minimum dimension a home can be on a lot is 20ft. wide and 20ft. long? Yes ___ ~x:~-No. ____ _ Have you designed or had this plan designed while considering building and other construcl\o9"Code requirements? Yes ~ No _____ _ Do your plans comply with all zoning rules and regulations in the County related to your properties z n aistrict? Yes No __________ __ Does the plan accurately indicate what you intend to construct and what will receive a final inspe.ctio:bJ1he Garfield County Building Department? Yes ~ No ______ _ Do you u~der tand that approval for design and/or construction changes are required prior to the ap · tion of these changes? Yes No _______ _ Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fe e" as wen as any "Road Impact" or "Septic System" fees required, at the time you pick up your building ~t? Yes ~ No ________ _ Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made from 7:30a.m. to 3:30p.m. Monday through Friday. Inspections are to be called h~}6 384-5003. Yes ~ No _______ _ Are you aware that requesting inspections on work that is not ready or not accessible will result in :?0.00 re-inspection fee? Yes ~ No ______ _ Are you aware that you are required to call for all inspections required under the IRC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupan\?f the building? Yes ~ No _________ _ 5 33. Are you aware that the Pennit Application must be signed by the Owner or a written authority being given for an Agent and that the party responsible for the project must comply ~~~ilie ~ No __________ __ 34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are perfonning the work? The license number of the person perfonning the work will be required at ti ~f applicable inspection. Yes . ~ No ______________ _ 35. Are you aware, that on the front of the Building Pennit Application you will need to fill in the Parcel /Schedule Number for the lot you are applying for this permit on prior to submittal of a building P\f'9rit application? Your attention in this is appreciated. Yes ~ No ________________ _ 36. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes No (please check with the building department about this requirement) 37. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building pennit that you will be required to obtain a grading ~e:it?X I 38 . Are you aware that if you will be connecting to a public water and/or sewer system, that the tap fees have to be paid and the connections inspected by the service provider prior to the issuance of a Certificate of Occupancy? Yes . )<" ge that I have read, understand and answered these questions to the ~~~~-%~~~~·0 ~~ot gnarure of 0 Date Phone: CZ ). -r:-{u 'IY7 >r f (days); 3 7 '7-' ~7 ~ (evenings) Project Name: Re ( 16 e.v f?roJ e c r ProjectAddress: 4'i~o :_ Crcq f?-cj (001 lot: 3 ~~ e {Vi)f-.~( s:__o Notes: If you have answered "No" on any of the questions, you may be required to provide this 6 information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minimum compliance with the adopted codes, the application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. Bpminreq November2006 7 The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. All bathrooms must be complete, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all IBC and IRC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. 9. If you will be connecting to a public water and/or sewer system, proof of the tap fees have been paid and the connections inspected by the service provider prior to issuance of a C.O. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****A CERTIFICATE OF OCCUPANCY MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. Signature Bpapplicationoctober2006 y the above conditions for occupancy, use and the issuance of a dwelling under building permit # _____ _ Date PLAN REVIEW CHECKLIST Applicant foiAO fPals Date '3 -01-oK': Building ~ngineered Foundation _L"oriveway Permit ~~ t/surveyed Site Plan \/ Septic Permit and Setbacks ~ V GradeiTopography 30% ~ttach Residential Plan Review List / Minimum Application Questionnaire ~ivision Plat Notes ~Fire Department Review ~ aluation Determination/Fees _LRed Line Plans/Stamps/Sticker -4-Attach Conditions .J....LApplication Signed ~Ian Reviewer To Sign Application J.LParcel/Schedule No. ~ ~0# Snowload Letter-Manf. Hms. V Soils Report GENERAL NOTES: Planning/Zoning £'Property Line Setbacks '--'30ft Stream Setbacks V flood Plain ~ngHeight L..-"L.oning Sign-off V Road Impact Fees .....lLHoAJDRC Approval ~Grade/Topography 40% .i.LP1anning Issues ~bdivision Plat Notes Building Plan Review Description of Work: amendments to approved 2008 plans Bin#: Location Address: 4482 CR 100 CARBONDALE. CO Case Manager: David Bartholomew Plan Case Number: BLDG-8-14-8053 Parcel: 239 l 30202003 Application Date: 01112612014 Building / Engineered Foundation / Driveway Permit / Surveyed Site Plan / Septic Permit and Setbacks I Grade/Topography 30% I Attach Residential Plan Review List / Minimum Application Questionnare 1'/{ Subdivision Plat Notes JJ/A ' Fire Department Review / Valuation Determination/Fees / Red Line Plans/StampsiSticker / Attach Conditions / Application Signed / Plan Reviewer To Sign Application / Parcel/Schedule No. JJ/11 40# Snowload Letter-Manu. Homes 7 Soils Report Wednesday, September 10,2014 Contacts ' Owner: Wade & Kellina Ceo Ia Applicant: Wade & Kellina Ceola Applicant Phone: (417)343-6911 Email: Planning/Zoning I Property Line Setbacks I 30ft Stream Setbacks / Flood Plain / Building height / Zoning Sign-off fl(A Road Impact Fees tJ/j. HOAIDRC Approval / Grade/Topography 40% / Planning Issues / Subdivision Plat General Comments: ,J?rU~I'~ U~t/tM#tf'# ,-14 92.,5~. oo Actdeol VA!u~h(}11: If{,~ 1f7. 7k /"C>//tl.. ;?Y;1u I ~es ~ SS?_, zg 7. ;~ ~ 5805'.94 ,f/prm" I ,H'P5 ,l)'t/ :--5 Z 7 I. 0 I VALUATION FEE DETERMINATION Applicant Address Date ..::W!.!a~d:::,e ;:&:..:K:!:e::!ll:!!in::,:a~C;:::e:!!o!:Ja~--===~ Subdivision 4482 CR 1 00, Carbondale Lot/Block -:9:-:::/I:=::O~t2~0~14~:.:..;:;.;;;:.;:==;..._...:.....==;;;...._contractor Finished (Livable Area): Main Upper Lower Other Total Total Ma.Br. Closet #1/Dressing Basement: Unfinished Square Feet Valuation Storage Conversion of Unfinished to Finished Other Total Valuation Garage/Storage (wood framed) Conversion of garage to finished living Carport Other Total Crawl Space Total Valuation Valuation Decks/Patios/Porches Covered Open Other Total Valuation Type of Construction: Occupancy: Total Valuation Total Valuation 577 sq.ft sq.ft sq.ft sq.ft X $74.68 577 sq.h 577 sq.ft X $41.00 sq.ft X $33.68 sq.ft X Commercial sq.fl X $I 8.00 sq.fl X $56.68 sq.ft X $12.00 sq .ft X sq.ftX $9.00 sq.ft X $24.00 sq.ftX $12.00 sq.ftX sf X sf X sf X sf X sf X sf X Los Pinones Ranch Lot# 3 Janckila Construction 43,090.36 23,657.00 0.00 0.00 0.00 0.00 66,747.36 VALUATION FEE DETERMINATION Applicant Address Date Four Forks Subdivision Los Pinones Ranch ~~~~------------------...;4..;.46:.:0:...:C:.:R..:..:1:..:::0.::..0 __________ Lot1Biock ..::3-----~-------- ..;;;3.;.;;/2;..;.4;.;;/2;.;.0.;;.;08;;..._ _______________ Contractor Semran Building Finished (Livable Area): Main Upper Lower Other Total Basement: Unfinished Square Feet Valuation Conversion of Unfinished to Finished Total Valuation Garage: Valuation Crawl Space Valuation Decks/ Patios Valuation Covered Open Type of Construction: Occupancy: Valuation Total Valuation 3447 sf 1416 sf 912 sf sf X $74 .68 5775 sf sf X $4!.00 sf X $33.68 1008 sf X $18.00 2535 sf X $9 .00 431,277.00 0 .00 18,144 .00 22,815 .00 415 sf X $24 .00: "'t~ (.o. 862 sf X $12 .00 1\,') 1 3'-f'-f • Commercial sf X sf X sf X sf X sf X sf X 20,304.00 0.00 492,540.00 I Garfield County Building & Planning Department 108 8th Stree~ Suite #401 Glenwood Springs, Co. 81601 Offlce:970.945-B212 Fax: 970.384-3470 Inspection Line: 970.384-5003 Building Permit No. Parcel No: 2391-302-02-003 Locality: Los pinones ranch subdivision , Lot 3 Job Address: 4460 ~-1 00, Carbondale Use of Building: s/f dwelling on crawl sapce w/open & cov patios & att g ~ra9e w/office above Owner : Four Forks LLC Contractor: Senrau Building ~----------------- Fees: Plan Check: $ 2,076.46 Septic: $ l.3.00 Bldg Permit: $ 3,194 .55 Other Fees: Total Fees: $ 5,3\i-01 Clerk: --stu torL Date: ~~1-0~ I