Loading...
HomeMy WebLinkAboutEngineer ReportMay. 27. 2008 !2:39PM Clearwater Development, Inc (}3rocf(Consufting, LLC Pl'ofessional Services May 26,2008 VIA FAX 3 84-3470 AND HAND DELIVERY Andy Schwaller Building & Conununity Development Garfield County 108 8th Street, Suite 201 Glenwood Springs, CO 81601 Re: Jinuny Sills Mamm Creek Subdivision Letter of Engineering Approval Dear Mr. Schwaller, No. 0388 P. I 403 c.Broad"wa]J Ste. 201 P.O. c.Bo:;;_3644 l£ag(e, co 81631 Ce((970-471-2121 Pfione 970-328-0876 Pa:{ 970-328-0875 The following is provided as requested for the Jimmy Sills Pump House Addition and the following conditions of my approval: 1) 2) 3) 4) S) 6) In review of the Pump House Addition Drawings dated 3/10/08 (shts 1-5), this letter provides engineering approval of the substitution of CMU's (concrete masonry units) for the referenced design of a poured-in-place concrete foundation. The steel reinforcement is confirmed to be #5 Rebar@ 16" O.C. Veltical and #5 Rebar@ 16" O.C. Horizontal. Maximum foundation height 8' -8". Gout confirmed to be 3,000 psi premix from Casey Concrete. Footing built per design and inspected by others confirmed by Heritage Masonry, LLC. Soils (geotechnical) inspection report and open-hole inspection by others under separate cover (not included). An allowable soil bearing capacity of2,000 PSF has been used in calculations. The foundation will be redesigned and ~,,11 ,\l!lill!/,1,1, resubmitted to Gm·field County Building Dept. prior to footing fonn~~j¥.g;/J'~ the Geotechnical engineer results be less than 2,000 PSF. ~ ::v /~\o.. L. &-?o.·. ~\ Roof engineering approval not included herewith. l., ·~"'~ 9< :} .,. "'o· . • ~ ~%-... ~·~ f~9 .,,_, 'ION A ~ 0 .II 1 f/ll 1 • 7) May. 27. 2008 !2:39PM Clearwater Development, Inc Should you need any further infonnation, please call me at 471-2121. Sincerely, Vern L. Brock, P.E. Colo. Reg. #30511 Cc: Alan Brock, Heritage Masoruy No. 0388 P. 2