HomeMy WebLinkAbout1.13 - Pre-App Summary Lake Springs Ranch
Subdivision Preliminary Plan & PUD Amendment June 2015
Exhibit 12 | Pre‐application Conference Summary Form
1
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-county.com
PRE-APPLICATION
CONFERENCE
SUMMARY
DATE: July 17, 2014 - UPDATED February 2015
TAX PARCEL NUMBER: 2187-333-09-022, 2187-321-09-023, 2187-334-00-106, 2187-334-00-107
PROJECT: Lake Springs Ranch PUD, Preliminary Plan and PUD Amendment
OWNERS/APPLICANT: The Berkeley Family Limited Liability Limited Partnership
REPRESENTATIVE: Tim Malloy, TG Malloy Consulting
PRACTICAL LOCATION: Lake Springs Ranch Subdivision, off of CR 114 and CR 115
ZONING: PUD
TYPE OF APPLICATION: Preliminary Plan and PUD Amendment
I. GENERAL PROJECT DESCRIPTION
The applicant proposes to amend the prelimin ary plan in regard to multiple aspects of their
approved Preliminary plan and PUD zoning, including:
1) Redesign drainage plan to move detention features out of conserved property (AVLT);
2) Revise alignment of Lake Springs Drive and Rivendell Drive so that cul-de-sacs do not
extend into conserved area – The request does not apparently conflict with Condition
25a that required cul-de-sacs to meet ULUR standards to the end of Spring Valley and
Rivendell Roads;
3) Revise terminology in Condition 14 (Resolution 2012-18) in regard to a Community
Water System;
4) Amend phasing plan to shift requirements for improvements to County Road 114 from
Phase II to Phase III;
5) Request a decrease in the required Affordable Housing in the development from 15% to
10%;
6) Revise Condition 15 regarding the East Pond.
2
The preliminary plan and PUD were concurrently approved by Resolution 2012-80.
The Land Use and Development Code provide a separate process for modifying both the
Preliminary plan and the approved PUD Zoning. However, these applications can be submitted
concurrently.
Preliminary Plan Amendment
According to section 5-304 Amended Preliminary Plan an application for amending a
preliminary plan shall be processed according to section 4 -106. Section 4-106 indicates that
a request to modify a preliminary plan can be Minor or Substantial, however a change of a
specific condition of approval as identified in a resolution adopted by the BOCC shall be
considered a Substantial Modification. Additionally, an amendment that requires
amendment or abandonment of any easements or rights of way is a Substantial
Modification. A Substantial Modification requires a new application for a Land Use Change
Permit and the Director shall determine the contents of the application.
PUD Amendment
According to section 6-203, PUD Zoning Amendment, a request for an amendment can
either be a minor modification or a substantial modificat ion. However, because the request
related to the PUD is to change the phasing plan, as provided in 6 -203.A. In all cases,
modifications to the approved phasing plan shall be deemed a Substantial Modification.
The Director shall determine the contents of the application
II. REGULATORY PROVISIONS APPLICANT IS REQUIRED TO ADDRESS
PRELIMINARY PLAN AMENDMENT
Garfield County Comprehensive Plan 2030
Garfield County Land Use and Development Code, effective October 13, 2014
Section 5-304, Amended Preliminary Plan
Section 4-106, Amendment to an Approved Land Use Change Permit
Table 5-401, Application Submittal Requirements
Section 5-302.C, Major Subdivision Review Preliminary Plan Review
PUD ZONING AMENDMENT
Garfield County Comprehensive Plan 2030
Garfield County Land Use and Development Code, effective October 13, 2014
Section 6-203.B.1.b. PUD Zoning Amendment, Substantial Modification
Section 6-202. PUD Zoning
6-302 Description of Submittal Requirements
3
III. REVIEW PROCESS
PRELIMINARY PLAN AMENDMENT
a. Pre-application Conference.
b. Application Submittal.
c. Determination of Completeness. (20 days for staff review, 60 days for applicant to
correct any deficiencies in the submittal)
d. Schedule Public Hearing, provide documentation regarding notice requirements in order
to satisfy LUDC requirement of minimum 30 day/maximum 60 day notice prior to
hearing.
e. Additional Copies requested and sent to referral agencies.
f. Evaluation by Director/Staff resulting in a Staff Report
g. Public Hearing before the PC, resulting in a recommendation
h. Schedule Public Hearing, provide documentation regarding notice requirements in order
to satisfy LUDC requirement of minimum 30 day/maximum 60 day notice prior to
hearing.
i. Public Hearing before the BOCC, resulting in a final approval, approval with co nditions or
denial.
j. Recording of decision in a Resolution
PUD ZONING AMENDMENT
a. Pre-application Conference.
b. Application Submittal.
c. Schedule Public Hearing, provide documentation regarding notice requirements in
order to satisfy LUDC requirement of minimum 30 day/maximum 60 day notice prior
to hearing.
d. Additional Copies requested and sent to referral agencies.
e. Evaluation by Director/Staff resulting in a Staff Report
f. Public Hearing before the PC, resulting in a recommendation
g. Schedule Public Hearing, provide documentation regarding notice requirements in
order to satisfy LUDC requirement of minimum 30 day/maximum 60 day notice prior
to hearing.
h. Public Hearing before the BOCC, resulting in a final approval, approval with
conditions or denial.
i. Recording of decision in a Resolution
IV. PUBLIC HEARINGS AND NOTICE
PRELIMINARY PLAN AMENDMENT AND PUD AMENDMENT
a. Review by: Staff for completeness recommendation and referral agencies for
additional technical review
4
b. Public Hearing: __ None (Director’s Decision)
_X_ Planning Commission
_X_ Board of County Commissioners
__ Board of Adjustment
Public Hearing notice is required to be published, mailed and posted notice for both requests
consistent with 4-101.E. Additionally, the PUD Amendment requires notice to be mailed to
all Property Owners and Mineral Owners within the PUD
V. SUBMITTAL REQUIREMENTS
PRELIMINARY PLAN AMENDMENT
Please refer directly to Table 4-201 and the list of General Application Materials in section 4-
203.B. These application materials are generally summarized below:
4-203.B. General Application Materials
o Application Form
o Ownership Documentation (deed) and title information indicating if there are any
lien holders and/or encumbrances (a title commitment may be necessary)
o Statement of Authority or Letter of Authorization, as necessary
o Fee Payment and Payment Agreement Form
o Pre-Application Conference Summary
o Names and addresses of all property owners within 200 feet of subject property
and a map showing the subject parcel and surrounding property owners
o Name and address of all mineral owners of the subject parcel
o Project Description
4-203.C Vicinity Map
4-203.D Site Plan
4-203.E Grading and Drainage Plan (approved and revised)
5-402.D. Preliminary Plan Map (approved and proposed plans)
5-402.I. Revised Code, Covenants, Restriction, if applicable
Section 7, Divisions 1, 2, 3 and 4. Respond to all standards in these sections and submit
any additional material (reports, plans, studies, etc) that provides evidence of
compliance.
Copy of previous approval resolutions and relevant documents
PUD ZONING AMENDMENT
4-203.B. General Application Materials
o Application Form
o Ownership Documentation (deed) and title information indicating if there are any
lien holders and/or encumbrances (a title commitment may be necessary)
o Statement of Authority or Letter of Authorization, as necessary
o Fee Payment and Payment Agreement Form
o Pre-Application Conference Summary
5
o Names and addresses of all property owners within 200 feet of subject property
and a map showing the subject parcel and surrounding property owners
o Name and address of all mineral owners of the subject parcel
o Project Description – include specific description of the amendment and any
supporting information.
4-203.C Vicinity Map
4-203.D Site Plan
6-302.A. PUD Plan (approved and revised), should include revised PUD Plan Map and
PUD Plan Guide, as appropriate
6-401. Respond to all standards in this section and submit any additional material that
provides evidence of compliance.
Copy of previous approval resolutions and relevant documents
Submit three paper copies and one CD for both applications. Additional copies will be
requested upon determination of completeness. See the land use code for additional
information on submittal requirements.
VI. REFERRALS
Referrals may include the following agencies:
Garfield County Road and Bridge Department
Garfield County Environmental Health Manager
Garfield County Consulting Engineer
Fire Protection Districts
Colorado Department of Transportation
Aspen Valley Land Trust
Garfield County Housing Authority
City of Glenwood Springs
Any other agency deemed appropriate upon review of the submittal
VI. APPLICATION REVIEW FEES
a. Planning Review Fees:
Preliminary Plan Amend. $325.00
PUD Zoning Amend. $300.00
b. Referral Agency Fees: $TBD – consulting engineer/civil engineer fees
c. Total Deposit: $625.00 (additional hours are billed at $40.50 /hour)
General Application Processing
Planner reviews case for completeness and sends to referral agencies for comments. The case
planner contacts applicant and sets up a site visit. Staff reviews application to determine if it meets
standards of review and makes a recommendation of approval, approval with conditions, or denial to
the Director of the Community Development Department. The Director’s decision is subject to a 10-
6
day call-up period. The pre-application meeting summary is only valid for six (6) months from the
date of the written summary.
Disclaimer
The foregoing summary is advisory in nature only and is not binding on the County. The summary
is based on current zoning, which is subject to change in the future, and upon factual
representations that may or may not be accurate. This summary does not create a legal or vested
right.
Pre-application Summary Prepared by:
February 5, 2015
___________________________________________ _____________
Kathy Eastley, Senior Planner Date
Tamra Allen, Planning Manager
7