HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-7-15-3798
Chevron Telecom Equipment Room
Chevron Delivery Facility
DeBeque, Colorado
1) ALL WORK SHALL COMPLY WITH THE 2009 IBC, 1MC, IPC, IFGC, IECC, IFC, TIA-222,
OSHA, FCC, EPA REGULATIONS, AND MANUFACTURERS SPECIFICATIONS.
2) PRIOR TO CONSTRUCTION, CONTACT THE LOCAL FIRE DISTRICT FOR PERTINENT IFC
REQUIREMENTS. FIRE DISTRICT APPROVAL REPORT REQUIRED FOR FINAL INSPECTION.
3) ROOMS WITH STORAGE BATTERY SYSTEMS HAVING A LIQUID ELECTROLYTE CAPACITY
OVER 50 GALLONS, OR A LITHIUM -ION CAPACITY OF 1000 POUNDS USED FOR STAND
BY POWER REQUIRES ONE (1) HOUR SEPARATION PER IBC, TABLE 508.2.5.
4) PENETRATIONS THROUGH FIRE RATED ASSEMBLIES PER 2009 IBC, SECTION 713.
5) OPEN -HOLE SOILS REPORT REQUIRED AT FOUNDATION INSPECTION, 2500 PSF.
6) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
7) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
8) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION.
9) GARFIELD COUNTY FINAL INSPECTION OF EQUIPMENT ROOM 15 REQUIRED.
10) GARFIELD COUNTY DOES NOT ISSUE BUILDING PERMITS FOR COMMUNICATION
TOWERS. TOWER CONSTRUCTION SHALL BE INSPECTED BY THE ENGINEER ON RECORD.
PROVIDE APPROVAL REPORT AT FINAL INSPECTION OF EQUIPMENT ROOM.