HomeMy WebLinkAboutConstruction Observation Report 08.21.2015HEPWORTH-PAWLAK GEOTECHNICAL August 21, 2015 Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81612 (hhorsfiord si1ichcoristruction.com) Hcruortlt• Palsl:tl. Gconcclinic. I, Inc 5020 County Road 154 Gienwoxxl Spring, Colorado 81601 Phone 970.945-7959 fax: 970.945.8454 email hri!urt@+hrgentcclti cont Job No. 115 066A Subject: Construction Observation and Testing Completion Letter, Proposed Residence, Lot 71, Ironbridge Development, River Bend Way, Garfield County, Colorado Gentlemen: As requested, we are providing a summary of our observation and testing services provided for the above referenced project. The reports of the services requested and performed for the project are attached. We previously conducted a subsoil study for design of foundations at the site and presented our findings in a report dated October 31, 2014, Job No. 113 47IG. The foundation bearing soils within the building excavation were observed and tested for compaction on February 25, 2015 and are suitable for the recommended bearing pressure of 1,000 psf. Perimeter grade beam reinforcement steel was observed on April 8 and the fresh concrete placed for the grade beams was sampled and tested on April 10, 2015. The post -tensioned slab tendons were observed on May 4, the fresh concrete was sampled on May 11 and tensioning of the tendons was observed on May 14, 2015 according to the project specifications. The results of the tendon tensionin_ were submitted to Fuhrm+ n & Graf for their approval. We did not observe placement of the rigid foam insulation along the building perimeter, but since the perimeter grade beam has a minimum depth of 36 inches, it provides adequate frost protection rather than by insulation. Based upon inferences drawn from our observation and testing, as documented by the attached daily field and laboratory reports, it is our professional opinion that the referenced construction has achieved the specified conditions. Please recognize that construction observation and testing are sampling functions that involve direct Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989 Silich Construction Inc. August 21, 2015 Page 2 observation and testing of very limited amount of the overall work to evaluate the construction compliance. If you have any questions or need further assistance, please call our office. Sincerely, HEPWORTH — PAWLAK GEOTCHNICAL, INC. Steven L. Pawlak, P. SLP/ksw Attachments: Observation & Testing Reports: 2/25/2014 through 5114/15 cc: Silich Construction --John Silich (john@silichconstruction.com) Job No. 115066A HEPW0RTH-PAWLAX GEOTECHNICAL Earthwork Client: Silich Construction Inc. Attn: Dave Guthrie 303 AABC, Suite J Aspen, Colorado 81611 5020 County Road 154 Glenwood Springs, Colorado 81601 Phone: 970.945.7988 Fax: 670-94548454 faDgeoO hDgeotech.corq Compaction Testing Report Job No.: 115 066A Day. Date: Page: Wednesday 2125115 1 of 1 Project: Proposed Residence, Lot 71, Ironbridge Development, River Bend Way, Garfield County, Colorado Weather Partly cloudy, Tight wind, dry Temperature: 44° at 3:22 pm Earthwork Contractor. Equipment Used: none Description of Earthwork Existing site grading fill was tested for compaction at 5 locations in the building area at Tested: rough slab subgrade. Twelve inch depth tests were performed. We observed a test trench outside of building footprint to be similar fill material to trench depth of 4 feet. It was recommended to Dave Guthrie on 2126115 that additional compaction teats be taken with depth when grade beam trenches are being dug. Sample(s) Obtained: One large composite bulk sample was obtained from the 5 test locations and submitted to our lab for standard Proctor and classification tests. Verbal Communication: Dave Guthrie with Silich met us on-site. Placement and Compaction Procedure: Not observed by HP Geotech. Lift Thickness: Compactor(s) Used: Max. Rock Size: Moisture Conditioning: Number of Passes: fill in trench 4' deep Nuclear Gauge Moisture/Density Test Results Test No. Location 1 20' NE of SW building corner Depth or Elev. rough slab subgrade Field Dry Density (pcf) Field Moisture Content aha Field Comp. (%) Min. Comp. Req. (%) Proctor Lab No. 119.4 10.2 95 95 015-15 2 3' W. of building E. side at center rough slab subgrade 122.7 9.4 98 95 015-15 3 6' NM of SE building carrier rough slab subgrade 122.9 9.3 98 95 015-15 4 5' SW of NE building comer garage area rough slab subgrade 118.5 112 95 95 015-15 5 7' SE of NW building comerb -slab subgrade 124.4 10.9 99 95 015-15 Proctor Sample Reference: Lab No. Method Description 015-15 ASTM D 698 Silty Sand with Gravel FMVFD-PRESENTS OPINIONS AS A RESULT OF OUR OBSERVATIONSOF PILL PLACEMl;NT. WE HAVE REUEO ON THE CONTRACTOR COMPACTIVE EFFORT AND MOISTURE TO RLL DURING THE TIMES WHEN OUR OBSERVER I5 NOT OBSERVING OPERATIONS THE NUCLEAR DENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM D SSB. Distribution: Aspen Signature Homes of Ironbridge, LLC - Liwyd Eccieetone (Iecolestoneeoblh1,net) Silich Construction -- Dave Guthrie (dauthria@silichconstruction.com) Max. Dry Opt. Dens. (pcf) Moist. (%) C�ITT�►rUE APPLr.EIG RECOMMENDED 1252 8.5 TO THIS ►ill Thomas J. Westhoff, CET Steven L Pawlak, P.E. Field Technician Reviewed By Gtech HEPWORTH -PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945.7988 Fax: 970945-8454 hogeoe hoaeotech.com REINFORCEMENT STEEL INSPECTION REPORT Client: Silich Construction Inc. Attn: Dave Guthrie 303 AABC, Suite J Aspen, Colorado 81611 Job No.: 115 066A Day: Wednesday Date: 4/8/15 Page: 1 of 1 Project: Proposed Residence, Lot 71, Ironbridge Development, River Bend Way, Garfield County, Colorado Area of Inspection: Grade Beams Reference Documents County Approved Structural Drawings dated 11124/14, Sheets F1.0 & FD1 Used: Inspection Notes: Inspection Status: Two 414 bars on 3 -inch concrete chairs were in place in grade beams. Grade beam trenches were lined with radon mitigation plastic sheeting. The sheeting was wind disturbed in some areas when observed on 4/8/15. The sheeting was observed correctly in place and foam board insulation was also in place at the outside of the exterior grade beams prior to concrete placement on 4/10/15. 0 Preliminary ® Final ® Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. 0 Exceptions Noted: Verbal Dave Guthrie with Silich Construction was informed of our observations. Communication: Distribution: Aspen Signature Homes of Ironbridge, LLC - Llwyd Ecclestone (lacciestoriaa oblhti.net) Sikh Construction — Dave Guthrie(douthrie@silichconstruction.com) Thomas J. Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By 5020 County Road 154 GgiSteCh Glenwood Springs, CO 81601 Phone: 970-945-7988 Fax: 970-945-8454 HEPWORTH-PAWL.AK GEOTECHNICAL hpgeo@hpgeotech.com CONCRETE TEST REPORT Sllich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 Job No. 115 066A Date Cast 04-10-15 Sheet: 1 of 1 Project: Proposed Residence, Lot 71, Ironbridge Development, River Bend Way, Garfield County, Colorado Placement Location: Grade Beams Supplier: Casey Concrete Time Batched: Truck No: 78 Time Arrived: Ticket No: 123558 Time Placed: Mix Design: 4500F, 4500 psi,' Non A Method of Placement: Pump Time Sampled: Air Temp: Concrete Temp: Water Added: 8:34 am Wet Unit Wt: 34° Slump: 63° Air Content: 10 gallons per Contractor 7:47 am 8:15 am 8:25 am Sample Point: 144.9 pcf 5' in. 3.0 % Load Size (Yds): Yds Delivered: Yds Ordered: 10 10 40 Truck Discharge Specifications: Slump: 4 to 6 inches Air Content: 3 to 8 % Communication: The Contractor and Supplier were informed of our field test results. Time Cylinders Cast: 8:45 am Initial Cure Time On Site: 3 days Field Storage: insulated Cure Box Date in Lab: 04-13-15 Cylinder Temperature at Pick Up: 56° MinlMax: 56°l76° Compressive Strength Data 2015 Lab Number Age Days Date Load lbs. Diameter in. Area in2 Compressive Strength (psi) 28 Day Av g. (psi) 194A 7 04-17-15 57,400 4.01 12.63 4550 6005 194B 28 05-08-15 76,500 4.01 12.63 6060 194C 28 05-08-15 75,100 4.01 12.63 5950 194D Hold/56 Discarded 5pecrned Strength for Structure: 4500 psi at 28 days Specified Strength for Mix: 4500 psi at 28 days Notes: Air was added on-site prior to discharge. Initial air test was 2.8%. Re -sampled and re- tested at contractor's request with result of 3.0% air. Distribution, Aspen Signature Homes of Ironbridge, LLC - Llwyd Ecclestone (lecclestonedDabihf.net) Sllich Construction—Hayden Horsford (hhorafordfitetikhy truc55on.com) Silich Construction—John Sillch (johneellichconsiruction.gom) Sllich Construction— Jodi Thimsen (icdiesitichconstruction.com} Casey Concrete — Shawn Vortdette tsvondettetws-concrete.com) njf Thomas J. Westhoff, CET David A. Young, P.E. Field Technician Reviewed By H P 5020 County Road 154 Glenwood Springs, CO 81601 GeOteCh Phone: 870-945-7988 Fax: 870-945-8454 HEPWORTH-PAWLAK GEOTECHNICAL hpgeo@haaeotech.com REINFORCEMENT STEEL INSPECTION REPORT Client: Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 Job No.: 115 066A Day: Monday Date: 514115 Page: 1 of 1 Project: Proposed Residence, Lot 71, Ironbridge Development, River Bend Way, Garfield County, Colorado Area of Inspection: Post Tensioned Slab Reference Documents Approved Construction Drawings, Sheets F1.0 and FD2, dated 11/24/15 Used: Inspection Notes: Inspection Status: Cables were centered in slab and spaced at 3 to 3.5 foot intervals with 14 cables running east/west and 20 cables running north/south. North/south direction has 1 more cable than shown on drawings as allowed by Drawing Notes. End anchorage and stressing end details were observed to be per plan. 0 Preliminary ® Final ® Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. 0 Exceptions Noted: Verbal Hayden Horsford with Silich Construction was informed of our Communication: inspection. Distribution: Aspen Signature Homes of tronbrldge, LLC- Lhvyd Ecclestone (Iecciestone@pblhfl.neti Silich Construction - Hayden Horsford(hhorsford@ailichconstyuction.com) Silich Construction - John Silich (iohn@silichconstrucl€on,com) Silich Construction - Jodi Thlmsen aodiesilichconstruction.com) Thomas J. Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By 5020 County Road 154 Glenwood Springs, CO 81601 GeStech Phone: 970945-7988 Fax: 970-945.8454 HEPWORTH- PAWLAK GEOTECHNICAL hpgeo@hpgeotech.com CONCRETE TEST REPORT H Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 Job No. 115 066A Date Cast 05-11-15 Sheet: 1 of 1 Project: Proposed Residence, Lot 71, Ironbridge Development, River Bend Way, Garfield County, Colorado Placement Location: Post -Tensioned Slab Supplier: Casey Concrete Truck No: 99 Ticket No: 124095 Mix Design: 4500 psi Exterior Method of Placement: Pump Time Sampled: 8:06 am Air Temp: 35° Concrete Temp: 62° Water Added: None Communication: The Mark wit test results. Time Batched: 7:40 am Time Arrived: 7:55 am Time Placed: 8:00 am Sample Point: Wet Unit Wt: 140.7 pcf Slump: 4% in. Air Content: 5.5 % Load Size (Yds): 10 Yds Delivered: 10 Yds Ordered: 40 Truck Discharge h Burner Construction and the Supplier were informed of our field Time Cylinders Cast: 8:16 am Initial Cure Time On Site: 1 day Field Storage: Insulated Cure Box Date in Lab: 05-12-15 Cylinder Temperature at Pick Up: 79° Min/Max: 600/84° Compressive Strength Data 2015 Lab Number Age Das Y Date Load lbs. Diameter in. Area in a Compressive Strength (psi) 28 Day Avg.si (psi) 257A 3 05-14-15 44,400 4.01 12.63 3520 6120 2758 7 05-18-15 53,600 4.01 12.63 4240 257C 28 06-08-15 77,000 4.01 12.63 6100 257D 28 06-08-15 77,600 4.01 12.63 6140 rengtn for Structure• a5U0 psi at 28 days Specified Strength for Mix: 4500 psi at 28 days Notes: Distribution: Aspen Signature Homes of Ironbridge, LLC - Ltwyd Ecclestone (lecctystonepblhil.neti Silich Construction — Hayden Horsford (hhvrsfordilllichconstruction.conn) Silich Construction — John Silich(lohnt28silichconstruction.corn) Silich Construction — Jodi Thlmsen (oditttisilichconstruction.com) Casey Concrete — Shawn Vondette (svondette iws-concrete.corn) Rjf Tom Westhoff, CET David A. Young, P. E. Field Technician Reviewed By G&ech HEPWORTH -PAWLAK GEOTECHNICAL POST TENSIONING FIELD REPORT Client: Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 Fax: 970-945.8454 hpgeo©hpgeotech.com Job No.: 115 066A Day: Thursday Date: 5114115 Page: 1 of 2 Project: Proposed Residence, Lot 71, Ironbridge Development, River Bend Way, Garfield County, Colorado Weather: Cloudy, Calm, Dry Field Notes: Temperature: 47°F at 9:00 am Cable tensioning was performed using Jack #613 by Gary Anderson & crew with K&G Rebar, starting at the slab northwest corner and progressing to the slab southeast corner. Tendon No. Location Jacking Force (kips) Gauge Reading (psi) Calculated Elongation (in.) Measured Elongation (in.) End 1 End 2 Total Deviation (%) 1 NW Comer 27 5400 5% 5% - 5% -4.7 2 West Side _ 27 5400 5% 4'/ - 4' -11.6 _ 3 West Side 27 5400 , 5% 4'/ - 4%_' -11.6 4 West Side 27 5400 5% 4% - 4% -9.3 5 West Side 27 5400 5' 5 - 5_ -7.0 6 West Side 27 5400 4% 5% - 5% +10.3 7 West Side 27 5400 4% 5% - 5'/ +12.8 8 West Side 27 5400 4' 5%s V - 51/2 +15.8 9 West Side 27 5400 4' 5% - 5% +13.2 10 West Side 27 5400 4' 5% - 5a +13.2 11 West Side 27 5400 3' 4% - 4+/. +73.3 12 West Side 27 5400 3'/ 4% - 4% +13.3 13 West Side 27 5400 3% 4%z - 4% +16.1 14 SW Comer 27 5400 3% 4% - 41/2 +16.1 Distribution: Aspen Signature Homes of Ironbridge, LLC - Llwyd Ecclestone (lecclestonee blhn.net) Silich Construction — Hayden Horsford (hhorsfordesliichconstruction.cam) Stitch Construction — John Silich (Iohnitksllichcor structlon.com) Stitch Construction — Jodi Thimsen (Iodles111chconstructlon.com) Fuhrmann & Graf — Nathaniel Graf(npararefuhrmannenalneerina.com) Thomas J. Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By HEPWORTH-PAWLAK GEOTECHNICAL POST TENSIONING FIELD REPORT Client: Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 61611 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945.7988 Fax: 970-945-8454 hpgeo@hpgeotech.com Job No.: 115 066A Day: Thursday Date: 5114115 Page: 2 of 2 Project: Proposed Residence, Lot 71, Ironbridge Development, River Bend Way, Garfield County, Colorado Weather. Cloudy, Calm, Dry Field Notes: Temperature: 47°F at 9:00 am Tendon No. Location Jacking Force (kips) Gauge Reading (psi) Calculated Elongation (In.) Measured Elongation (in.) End 1 land 2 Total Deviation (°A) A-0 SW Corner 27 5400 1' 1% - 1'/ +27.2 A South Side 27 5400 1% 3 - 3 +118.2 B South Side _ 27 5400 1% 314 - 31 +136.4 C South Side 27 5400 36 31 - 31/4 -10.3 D South Side 27 5400 3a 31 - 31/4 -10.3 E South Side 27 5400 3% 3 - 3 -17.2 F South Side 27 5400 3' 31 - 314 -10.3 . G South Side _ 27 5400 3% 314 - 31/4 -10.3 H South Side 27 5400 3% 3 - 3 -17.2 I South Side 27 5400 3% 314 - 314 -10.3 J South Side 27 5400 3% 3% - 3% -3.4 K South Side 27 5400 3% 3% - 3% -6.9 L South Side 27 5400 36 3% - 312 -3.4 M South Side 27 5400 3% 3% - 3% 0 N South Side 27 5400 3% 3' - 33/a -6.9 O South Side 27 5400 35 3% - 3' -6.9 P South Side 27 , 5400 2% 2' - 2/s -19.0 Q South Side 27 5400 2% 21 - 21/4 -14.3 R South Side 27 5400 2% 2s - 2% -9.5 S SE Corner 27 5400 26 2' - 2% -9.5 Distribution: Aspen Signature Homes of Ironbridge, LLC - Llwyd Ecclestone tIecclestonegpblhfl.rnet) Silich Construction — Hayden Horsfordthhorsfordesiiichcanstruction,com) Silich Construction — John Silich Hohnesilichconstruction.com) Silich Construction — Jodi 1'himsen (ivdinsilichcor*struction.com) Fuhrmann & Graf — Nathaniel Graf Ineerafitfuhrmannenoineerino.com) Thomas J. Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By Gtech HEPWORTH-PAWLAK GEOTECHNICAL POST TENSIONING FIELD REPORT Client: Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970.945-7988 Fax: 970-945-6454 hpgeo@hpgeotech.com Job No.: 115 066A Day: Thursday Date: 5/14115 Page: 1 of 2 Project: Proposed Residence, Lot 71, Ironbridge Development, River Bend Way, Garfield County, Colorado Weather: Cloudy, Calm, Dry Field Notes: Temperature: 47°F at 9:00 am Cable tensioning was performed using Jack #613 by Gary Anderson & crew with K&G Rebar, starting at the slab northwest corner and progressing to the slab southeast corner. Tendon No Location Jacking Force (kips) Gauge Reading (psi) Calculated Elongation (in.) Measured Elongation (in.) End 1 End 2 Total Deviation (%) 4.7 t' 1 NW Corner 27 5400 53 5% - 51/ 2 West Side 27 5400 53/ 43 - 43/ -11.6 i-- 3 West Side 27 5400 53 43/ - 43 -11.6 r/ 4 West Side 27 5400 53 4' - 4'/ -9.3 & 5 West Side 27 5400 53/ 5 - 5_ -7.0 V 6 West Side 27 5400 4% 5° - 53 +10.3 4 7 West Side 27 5400 4% 5% - 53' +42.8 v 8 West Side 27 5400 43/ 5% - 5% +15.8 9 West Side 27 5400 43/ 53/ - _ 53 +13.2 V 10 West Side 27 5400 4% 53 - 53 +13.2 11 West Side 27 5400 33 4% - _ 4% +13.3 i 12 West Side 27 5400 33/ 4% - 4% +13.3 1- " 13 West Side 27 5400 3% 4% - 434 +16.1 14 SW Corner 27 5400 3% 4% - 4'/ +16.1 ✓ Distribution: Aspen Signature Homes of Ironbridge, LLC - Llwyd Ecclestone (Iecciestone{BlpblMi.net) Silich Construction — Hayden Horsford(hhorsforditsillchconstruction.com) SilIch Construction — John Silich (Iohnt sitichconstructlon.com) Silich Construction — Jodi Thimsen (lodittllsilichconstruction.com) Fuhrmann & Graf — Nathaniel Graf(nparafttl/Fuhrmannenaineerin4.com) Thomas J. Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By Gtech HEPWORTH - PAWLAK GEOTECHNICAL POST TENSIONING FIELD REPORT Client: Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Sulte J Aspen, Colorado 81611 5020 County Road 184 Glenwood Springs, CO 81601 Phone: 970-945.7988 Fax: 970-945-8454 hpgeofghpgeotech.com Job No.: 115 066A Day: Thursday Date: 5114115 Page: 2 of 2 Project: Proposed Residence, Lot 71, Ironbridge Development, River Bend Way, Garfield County, Colorado Weather: Cloudy, Calm, Dry Field Notes: Temperature: 47°F at 9:00 am Tendon No Location SW Corner Jacking Force (kips) 27 Gauge Reading (psi) 5400 Calculated Elongation (in.) 1% Measured Elongation (in.) End 1 1% End 2 - Total 1% Deviation (h) +27.2 , f A-0 A _ South Side 27 5400 1' 3 - 3 +118.2 t, B South Side 27 5400 3/ 3% - 3% +136.4 " C South Side 27 5400 % 3%4 - 3% -10.3 D South Side 27 5400 3% 3% - 3' -10.3 I/ E South Side 27 5400 3% 3 - 3 -17.2 V F South Side 27 5400 3% 3% - 3% -10.3 V G South Side 27 5400 3% 3% - 3Y -10.3 1"- H South Side 27 5400 3% 3 - 3 -17.2 e" I South Side 27 5400 3% 3'/ - 3% -10.3 e J South Side 27 5400 3% 3% - 3%s -3.4 K South Side 27 5400 3% 3% - 33/s -6.9 rr L South Side 27 5400 3% 3'/2 - 31/2 -3.4 ✓/ M South Side 27 5400 3% 3% - 3% 0 i`' N South Side 27 5400 3% 3% - 3% -6.9 '/ 0 South Side 27 5400 3% 3% - 3% -6.9 ✓ P South Side 27 5400 2% 2'/a - 2%. -19.0 Q South Side 27 5400 2% 2% - 2/_ -14.3 Y,' R South Side 27 5400 2% 2% - 2% -9.5 S m SE Corner 27 5400 2% 2% - 2% -9.5 v Distribution: Aspen Signature Homes of Ironbridge, LLC - Llwyd Ecclestone (Iecclestoneepbihfl.net) Silich Construction — Hayden Horsford(hhorsfordftsllichconstruction.com ) Silich Construction — John Silich 0ohnt9silichconstruction.com) Silich Construction — Jodi Thlmsen(jodI(18silichconstruction.corn) Fuhrmann & Graf — Nathaniel Graf(npgraffi4fuhrmannengineerinq.com) Thomas J. Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By