Loading...
HomeMy WebLinkAboutApplication- PermitGarfield County . Building & Sanitation Department 108 8th Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 NO. q 1 Cts Job Address 3?a3 3 e,V` 3 i t (! O d/ 6 I7 Nature of Work Buildinz Permit Q. 111 - bp - a 10 Use of Building ✓ 1i7T7 6�tv" . Owner a/ U Contractor 07,0)14.-A__, Amount of Permit $ Sa . if Date 13) 0200' Clerk /1 �l Permit No: GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8n Street, Suite 201, Glenwood Springs, CO 81601 Phone: 970-9454212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003 (1 (gam Parcel/Schedule No: 2/79 -211 -op- 2!o PERMISSION IS HEREBY GRANTED TGTHEE APPFL CANT AS OWNER, C ACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOAT(ON, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARTICTECT, DESIGNER BUILDER, AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garrom.00� /\.. (�� 9l/ei HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL). Y.. Ili tilf.11lY Job Address: . / 3923 311 RoA/J /✓uveel Sre. E tee Ilis,nt469 1 Lot No: Block No: Subd. / Exemption: 2 Owner: ner 1644E1_ 3923 311 ;29 1'1' ress Ph: _ z-1314 Wk Ph: 3 Contractor: R M Address: Ph: 2 73 7 Lic. No. 4 Architect/Engineer: Address: Ph: Lic. No. 5 Sq. Ft. of Building: 2704 Sq. Ft. of Lot: A /Do licit -z:5 Height: 2° / No. of Floors: 3/e45v 6 Use of Building: /� _- �� F3 E S► D gig GC ---hC(�..,Q.� 7 Describe Work: 4)141*( Rap Pcs( `3egeo044•'"`-t+$ 14---L406 5IDiie4 8 Class of Work: �J o New o Alteration /Z PAI56 ,Ip $ Addition o Move o Remove 9 10 Garage: ❑ Single o Double Carport: ❑ Single ❑ Double 7423 D 'vmit ❑ On -Site Sewage Disposal o Site Plan (Septic) 11 Yaks on of W k: $ ae 8000 Adjusted Valuations: $ g opo ,cD 12 ,. Spada! Cmdlflons: to 4.5 ro EX/5T/A! lox6 OPta b , 70 � , o /ole Lnx tjl /S �A4orr41: y n t� 71,1/2“,,c4AT'a /,,,�^ , 30 " ` ` NOTICE A SEPARATE ELECTRICAL PERMIT IS REQUIRED ISSUED BY TILE STATE OF COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED PERIOD OF I80 DAYS AT ANY TIME AFTER WORK IS COMMENCED. 1 HEREBY CERTIFY THAT 1 HAVE READ AND APPLICATION AND KNOW THE SAME TO BE TRUE AND PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK COMPLETED WITHIN WHETHER SPECIFIED HEREIN GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE OF ANY TO VIOLATE OR CANCEL THE CONSTRUCTION LOCAL LAW REGULATING CONSTRUCTION OR THE AND MUST BE ST CONSTRUCTION OR, IF FOR A EXAMINED THIS CORRECT. ALL WILL BE OR NOT. THE AUTHORITY OTHER STATE OR PERFORMANCE Plan Check Fee: 9 7/ / t� Permit Fee: /`� .7` Total Fee: 7503.8) / (v Dated PermiterIssued: OCC G U (J 3 R Const. Type: Zoning: rill �Bf:F/7al'cS; � �J� �" ��,�/7 (/ �� /J . r���'1�/f /6F CO UCTION. Manu. Home: ISDS No. & Fee: SI OF ER / ATE C SPR DEPT. LN AP D V�/11 IY -. 9.nei /7 iig PERMISSION IS HEREBY GRANTED TGTHEE APPFL CANT AS OWNER, C ACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOAT(ON, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARTICTECT, DESIGNER BUILDER, AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garrom.00� /\.. (�� 9l/ei HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL). Y.. Ili tilf.11lY PLAN REVIEW CHECKLIST Applicant 47:k Date 7.5 05" Building ./ 14 Engineered Foundation 4,A Driveway Permit c44727 ?ca /AULA eyed Site Plan it a Septic Permit and Setbacks rade/Topography 30% ‘ach Residential Plan Review List Minimum Application Questionnaire kill Subdivision Plat Notes u Q_ Fire Department Review "Valuation Determination/Fees Red Line Plans/Stamps/Sticker -/ttach Conditions `Application Signed =Plan Reviewer To Sign Application /P taP�rcel/Schedule No. 40# Snowload Letter- Manf. Hms. CGENERAL NOTES: Gin 0 IDCAmnia Planning/Zoning Property Line Setbacks 30ft Stream Setbacks Flood Plain Building Height Zoning Sign -off Road Impact Fees HOA/DRC Approval Grade/Topography 40% Planning Issues Subdivision Plat Notes ?EAS Pie -1444 T /S Com. 4 ME 3 c -c-.T a'fi A GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS for SINGLE FAMILY DWELLING CONSTRUCTION including NEW CONSTRUCTION ADDITIONS ALTERATIONS and MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. Adequate and complete information will prevent delays in the plan review process. Reviewing a plan and the discovery that required information has not been provided by the applicant may result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor may be required to provide this information before the plan review may proceed This causes delays because other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. If you do not, it may be helpful to obtain a book titled "Dwelling Construction under the Uniform Building Code". This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a permit. r. Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. Plans must include afloor lan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finishgrade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house - rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, an 80 M.P.H. windshear, wind exposure B, windload of 15 pounds per square foot, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC. 1. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. NOTE: 106.3.1 (7.) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. YE C> Yes_ cf= GJ,?N/A.) O240/,0A1-- fp-r,ci ,,/Nrc ou (oo Rear -6$ 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building permit on is located on a corner lot. Special setbacks do apply. Yes A.,o 3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? Yes 6Jo 4. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes NI 0 2 5. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes /v A- 6. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes fU fl 7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces's and soffits? Yes 8. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind loads? Yes 9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes 1/ 10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes 11. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes ✓ 12. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing (undisturbed) grade contours? Yes a pPRA) X 7.o' 13. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase 11 certifications or phase II EPA certification? Yes No 14. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes No 3 15. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? Yes No 16. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes ✓ No 17. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No 18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No ✓ 19. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes No 20. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will not be accepted without it. Yes ✓ No 21. Will this be the only residential structure on the parcel? Yes ✓ No If no -Explain: 22. Have two (2) complete sets of construction drawings been submitted with the application? Yes ✓ 23. Do you understand that the minimum dimensions a home can be on a lot is 20ft.wide and 20ft. long? Yes ✓ No 24. Have you designed or had this plan designed while considering building and other construction code requirements? Yes ✓ No 25. Do your plans comply with all zoning rules and regulations in the County related to your properties zone district? Yes No 26. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes � No 27. Do you understand that approval for design and/or construction changes are required prior to the application of these changes? Yes ✓ No 28. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your building permit? Yes v No 29. Are you aware that twenty-four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale in the afternoons. All inspections must be called in by 3:30 p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will delay your inspection one (1) day. Inspections are to be called in to 384-5003. Yes ✓ No 30. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $47.00 re-inpsection fee? Yes (/ No 31. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes / No 32. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Building Code? Yes ✓ No 33. Are you aware as part of the submittal for a building permit you are required to show proof of a driveway access permit from Garfield County Road & Bridge Department or if applicable the State Highway Department ? If a permit is not necessary, then a letter stating that information is required. You can contact the Garfield County Road & Bridge Department at 625-8601 or refer to the phone book for the State Highway Departments phone number. Yes ✓ No 34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at time of applicable inspection. Yes No 35. Are you aware, that on the front of the Building Permit Application you will need to fill in the ParceUSchedule Number for the lot you are applying for this permit on prior to submittal of a building permit application? Your attention in this is appreciated. Yes 1/ No 36. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes L--- No (please check with the building department about this requirement) 37. Are you aware, that if you receive your water and/or sewer from an Association, District, or Municipality you will be required to provide the County with a copy of the Tap Permit (or evidence of an exemption) at the time of the building permit application submittal? Yes ✓ No N/A 38. If you are within five (5) miles of the City of Rifle or the Town of Parachute, have you checked with them concerning water shed protection zone permit requirements for ISDS and other activities? Yes No ✓ N/A I hereby acknowledge that I have read, understand and answered these questions to the ignature of Owner Date best of „y ability. Phone: $ ?G ' Z 3 3 7 (days); (evenings) Project Name:-gieAEG-. Project Address: 3 9 Z 311 R o, 0 Notes: If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a 6 €RIERU4EERS 0 Peter Israel Darryl Hampton 3923 C.R. 311 Silt, CO Dear Peter/Darryl: CRITERIUM-KUPELIAN ENGINEERS 1000 N 9TH ST SUITE 26 GRAND JUNCTION, CO 61501 PHONE/FAX 970 248-9200 October 26, 2004 E-MAIL cke@ahinet.net Job No. 2004107 At your request, a limited structural inspection of the above property was performed on October 1, 2004. The report that follows has been prepared based on that inspection. The inspection was performed by and report written by Suzanne M. Kupelian, P.E. For your interest, a copy of Ms. Kupelian's resume is attached. You requested that we inspect the work that had been done at the above address pursuant to our recommendations of July 23, 2004, namely: • Support for a small balcony in the master suite overlooking the living area • Support for the loft roof by the balcony • Support for the loft roof by the bathroom • Support for the loft roof at the rear of the house by the stairwell • Support over the new patio door being installed in the loft • Adequacy of foundation support This written report is the complete response to your request for an inspection of this property and should be read in full. It supersedes any discussions that may have occurred during the inspection. If you have any questions about this report or our inspection, please call our office immediately for clarification. INTRODUCTION This report is based on an examination of the exterior of the roof, the visible framing, the interior of the existing house, the foundation walls and perimeter and interior footings. This report is based on visible evidence available during a diligent inspection of all reasonably accessible areas. No surface materials were removed, no destructive testing undertaken, nor furnishings moved. This report is not an exhaustive technical evaluation. Such an evaluation would cost many times more. Owning any building involves some risk. Even the most comprehensive inspection cannot be expected to reveal every condition you may consider relevant to ownership. Further, without disassembling the building, not everything can be known- As Professional Engineers, it is our responsibility to evaluate available evidence relevant to the purpose of this inspection. We are not, however, responsible for conditions that could not be seen or were not within the scope Page 1 /0/26/09 LI PROFESSIONAL ENGINEERS BUILDING INSPECTIONS DIAGNOSTICS STRUCTURE & FOUNDATION DESIGN of our service at the time of the inspection. Attached are the actual inspection field notes which contain additional information. These should be considered part of the overall evaluation and report. This inspection was performed in conformance with the standards of practice of the National Academy of Building Inspection Engineers. A copy of the pre -inspection agreement associated with this inspection has been included for your reference. DESCRIPTION The existing house is a one-story log home with a master suite in a loft at the rear of the house. Roof surfacing consists of wood shakes. There is a full basement under this building. OBSERVATIONS AND RECOMMENDATIONS The work discussed in our communication dated July 23, 2004 had been completed and the remodeling contractor, Darryl Hampton, requested that we inspect the completed work. Balcony Support A 4 x 6 beam could be attached using bolts and hangers at one end and resting on a bearing wall at the other end. The construction was adequate. Support for Loft Roof Near Balcony A roof support was required adjacent to the balcony. A 6 x 6 post had been installed to rest over a first floor bearing wall at the left side of the balcony, and on the rafter at the right side. This post was not lag bolted, as was originally recommended, since, when the drywall was removed to expose the structure, there were no structural members immediately adjacent to the post. A plywood shear wall was used to brace this post, and the rafter was notched as recommended to accommodate the lower end of the rafter. We consider this to be adequate support. Support for Loft Roof Near Bathroom At the time of the inspection, there was still a 4 x 4 wood post supporting the ridge pole of the roof over the loft. Mr. Israel asked if this post could be removed. This will require additional analysis. (see section entitled "General Information", below.) Page 2 10/26/04 0 Support for the loft roof at stairwell At the time of this inspection, the drywall had been removed to expose the structural details of the wall/roof connection in this area. When this area was exposed, it was clear that the rafter in question could be modified to rest on top of the built-up log. The loft wall over the stairwell was extended upward to accommodate the new ceiling height in the loft. These modifications appear to be structurally adequate. The previously noted "orphaned" rafter visible above the top of the stair was still stable, and exposure of this part of the wall, occasioned by removal of the drywall, confirmed our previous opinion that this area was structurally stable. Bracing was not deemed necessary in this area of the loft, the roof rafters rest on the top of the wall. Patio Door Lintel A steel lintel was installed to support the roof structure over the patio door that is being installed in the loft, as per our recommendations. Foundation Adequacy As was previously noted, it appears that some of the additional weight of the remodel will be carried by the bearing wall in the basement, but most of the weight of the remodel will be carried by the exterior walls and their foundations, which appear to be adequate to the task. Bracing appears to be sufficient. General Information Please be aware that no computations have been performed at this time, partially because that is beyond the scope of the investigation, and partially because we do not consider that this would be cost-effective. We do, however, as previously noted, feel that computations are in order to determine if removing the ridgepole support post beneath the splice in the ridge pole is advisable. Results of this investigation will be provided at a later date CONCLUSION The recommendations made at our previous inspection have been adequately addressed, and we judge the building renovations to be structurally sound. The one item still being investigated is the possibility of removing the support beneath the splice in the ridge pole at the top of the stairs. The support post remains in place pending receipt of results of this investigation. This report has been prepared in strict confidence with you as our client. No reproduction or re -use is permitted without your express written consent. Further, we will not release this report to anyone without your permission. Page 3 10/26/04 Several issues have been discussed in this report. However, we realize that there may still be other things of interest to you that have not been discussed. Therefore, we encourage you to call with any additional questions you may have. Thank you for the opportunity to be of assistance to you. Sincerely, Suzanne M. Kupelian, P.E. SK/sk Attachments Page 4 10/26/04 BUILDING & PLANNING DEPARTMENT Code Compliance Office Date: 6'/A-0 6 To: fat gonotat - 39'23 0413// %¢irr accas do Dear Permit Holder, Please refer to your building permit number 9/ 9.f . issued 7/13 /o r . A routine review of our open building permits indicates that we have not received a request for an inspection on this permit since S -2f -es - Please be advised that building permits expire, per Uniform Building Code, section 106.4.4 and Internauonal Code Section 105.5. "Every permit issued by the building official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has commenced for a period of 180 days. Before such work can be recommenced, a new permit shall first be obtained to do so. and the fee therefore shall be one half the amount required for a new permit for such work, provided no changes have been made or will be made in the original plans and specifications for such work, and provided further that such suspension or abandonment has not exceeded one year. In order to renew action on a permit after expiration, the permittee shall pay a new full permit fee." Please contact this office at your very earliest convenience, in writing, to advise us about the status of your permitted work. If you have not responded within thirty days from the receipt of this notice the permit will be dosed and a permanent notation will be placed in the property records at the County Clerk and Recorders office that indicates that the work permitted per Colorado Revised Statutes 30-28-205 & 210, was not inspected, is not approved and that the building or area is illegal to occupy and is subject to legal abatement action. Thank you for your cooperation. -yr- Sincerely, PeLrn7� earti- Tim Holliday Dave Mead Matt Provost Building Inspectors 108 8th Street, Suite 201, Glenwood Springs, Colorado 81601 (970) 945-8212 (970) 285-7972 Fax: (970) 384-3470 No. 9195 Assessor's Parcel No / f )q— Date 9—Date 703/0y 39013 ^ ^3f BMG PERMIT CARD Job Address -a CO.Wg/6V7 Owner Contractor Setbacks: Soils Test Footing Foundation Grout Underground Plumbing Rough Pfumbin Framing Insulation Roofing Drywall S -as -Q 1r►M Gas Piping Front Rear KM -63 en AzJak, Address ia3Ca-3/1 /)•CS/� hone # Address -e yti& Phone # RH LH Zoning INSPECTIONS it Z6l0cf P76-01337 Weatherproofing Mechanical Electrical Rough (State) Electri al Final tate) Finalecklist Completed? Jr - Certificate Certificate Occupancy # Date Septic System # NI is Date Final Other ....a _.i.a NwIFw'rit* JrOY)t, ,,^ 'NOTES ��9 tJL,Q (continue on back)