Loading...
HomeMy WebLinkAboutApplication- PermitGarfield County 'Building & Sanitation Department 108 8th Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 Job Address al a ete /OF 4-1-13 NO. -163 Nature of Work Building Permit c7/a3 3njc2i "A3 - /87 ZASI _S��21l63Use of Building Owner ©ic 112 -CMC, Contractor Amount of Permit $ b-2oS Date ai -67` Clerk Pitecd?„__ GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 81° Street, Suite 201, Glenwood Springs, CO 81601 Phone: 970-945-8212/ Fax: 970-384-3470 / Inspection Line: 970-384-5003 Q Permit No: f /S ParceUSchedule No: c \ 2- - Job Address: Block No: 1 Lot No: J --o 1/4- 3 SARI. / Exemption: C7t�'3 OSS i '''-• Wk Pfl: 1/5 - 07o 3 2 3 Owner: Contr ctor: -.,-� Addr5ess 2fy .).. 3 14,4 �(c. Address: tcvtw Ph: Ph: Lic. No. 4 5 6 Architect/Engineer:�--`& ev x v 5c.Sq. Ft. of Building: .% Use of Building: Address: Ph: Lic. No. Sq. Ft. of Lot: Ye 13a Height: No. of Floors: 7 ♦ SO✓c_5L Describe Work: CA c- 8 Class of Work: g New o Addition ❑ Alteration ❑ Move o Remove 9 10 Garage: o Single o Double Carport: o Single o Double 11 Drivew y,P mit Valuation o Wo o 0 J 3 Ia ❑ On -Site Sewage Disposal (Septic) ❑ Site Plan 12 Special Conditions: Adjusted Valuations: $ LISri D q o . NOTICE A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OF COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR, IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. 1 HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OFC° STRUICTION. � 1 nre : r "rawP �{.�rJ. +� APPROVAL/DATE P f fJ'`' i 744 Plan Check Fee: 372. . ig Permit Fee: lv©3.35 Total Fee: Dated Permit Issued: 915.53 O Gro p: Const. Type: Zoning: Setbacks: Manu. Home: AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUAN'CE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28101 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND 7HERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED 014 THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garfom.003 '/ '1 ,\, I I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL): L v . 311VVP 6, r1�ljo z_ ISDS No. & Fee: The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1997 UBC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made; 8. A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, where applicable. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. 1 understand and agree to abide by the above conditions for occupancy use and the issuance of a Certificate of Occupancy for the dwelling under building permit #/� . c Signature Date Bpcont03/2004 PLAN REVIEW CHECKLIST Applicant q 144)0$S / Date 6,-4' 0t Building / Engineered Foundation pi.Q Driveway Permit ` a4c1 Mni ,/11 Surveyed Site Plan Mil -Septic Permit and Setbacks Grade/Topography 30% rl . /1 Attach Residential Plan Review List Minimum Application Questionnaire subdivision Plat Notes Fire Department Review 7aluation Determination/Fees ✓Red Line Plans/Stamps/Sticker -/ Attach Conditions ,.lication Signed -/ lan Reviewer To Sign Application IParcel/Schedule No. 40# Snowload Letter- Man£ Hms. GENERAL NOTES: ') zoo o x 22.52 = 4 s, &4O Planning/Zoning Property Line Setbacks 30ft Stream Setbacks Flood Plain Building Height Zoning Sign -off Road Impact Fees HOA/DRC Approval Grade/Topography 40% Planning Issues Subdivision Plat Notes 111 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI -FAMILY RESIDENTIAL BUILDINGS including NEW CONSTRUCTION ADDITIONS ALTERATIONS and MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. Adequate and complete information will prevent delays in the plan review process. Reviewing a plan and the discovery that required information has not been provided by the applicant may result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor may be required to provide this information before the plan review may proceed. This causes delays because other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. If you do not, it may be helpful to obtain a book titled "Dwelling Construction Under the Uniform Building Code". This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. 1 Plans to be included for a Building Permit must be on draft paper at least 18"x 24" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot. up to 7,000 feet in elevation, an 80 M.P.H. windshear, wind exposure B, windload of 15 pounds per square foot and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each corner of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. NOTE: 1063.1 (7.) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat the proposed structure located within the envelope. Yes V 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes No Not necessary for this project 3. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance 2 only", "Approval drawings only", "For permit issuance only" or similar language? Yes No Not necessary for this project 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? Yes No Not necessary for this project 5. Does the site plan indicate the location and direction of the State, County or private road accessing the property? Yes ✓ 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes ✓ No Not necessary for this project 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes ,.7 No Not necessary for this project 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes No Not necessary for project te/ 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes No Not necessary for this project 10. Do the plans include design loads as required under the Uniform Building Code for roof snowloads (a minimum of 40 pounds per square foot in Garfield County)? Yes No Not necessary for this project 11. Do the plans include design loads as required for floor loads under the Uniform Building Code Cha ter 16 and Tables 16A, 16B and 16C? Yes No Not necessary for this project 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof const ction? Yes No Not necessary for this project 13. Is the win peed and exposure design included in the plan? Yes No Not necessary for this project 3 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes // No Not necessary for this project 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes L..< No Not necessary for this project 16. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to exi ting grade contours? Yes No Not necessary for this project 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes No Not necessary for this project ✓ 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 31? Yes No Not necessary for this project ✓ 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? ✓ Yes No Not necessary for this project 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes No Not necessary for this project !✓ 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? / Yes No Not necessary for this project ✓ 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? s...."'""Yes No Not necessary for this project 23. Have all areas in the building been accurately identified for the intended use? (Occu anc identified in the Uniform Building Code Table 5-A) Yes (/ No Not necessary for this project 4 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes No Not necessary for this project 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No Not necessary for this project 26. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes No Not necessary for this project_4e.'" 27. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes No Not necessary for this project 28. Have two (2) complete sets of construction drawings been submitted with the application? Yes No 29. Have you designed or had this plan designed while considering building and other construction code requirements? Yes t/ No Not necessary for this project 30. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes No 31. Do your plans comply with all zoning rules and regulations in the County related to your zone district? For corner lots see supplemental section 5.05.03 in the Garfield County Zoning tion for setbacks. Yes ResoNo 32. Do you understand that approval for design and/or construction changes are required prior to the implementation of these changes? Yes No 33. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit?er Yes // No 5 34. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes t./ No 35. Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Codes? Yes [/ No 36. Are you aware that twenty-four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale, in the afternoon. All inspections must be called in by 3:30 p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will delay your inspection one (1) day. Inspections are to be called in to 384-5003. 37. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $47.00 re -inspection fee? Yes 4_,/". No 38. Are you aware as part of the submittal for a building permit you are required to show proof of a driveway access permit from the Garfield County Road & Bridge Department or if applicable the State Highway Department? If a permit is not necessary, then a letter stating that information is required. You can contact the Road & Bridge Department at 625-8601 or refer to the phone book for the State Highway Department phone number if applicable. Yes No N/A 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at ime of inspection. Yes No 40. Are you aware, that on the front of the building permit application you will need to fill in the Parcel/ Schedule Number for the lot you are applying for this permit on prior to submittal of jjie building permit application? Your attention in this is appreciated. Yes No 41. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes No (Please check with the building department about this requirement) 3, you Gc.tLaw.... gm. 'F; vt *c •• — Nest V.A. 6 42. Are you aware, that if you receive your water and/or sewer from an Association, a District or Municipality, you will be required to provide the County with a copy of the Tap Permit (or evidence of an exemption) at the time of the building permit application submittal? Yes No N/A 43. If you are within five (5) miles of the City of Rifle or the Town of Parachute, have you checked with them concerning water shed protection zone permit requirements for ISDS and other activities'? Yes No N/A 1 hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. 1' — ` >i Signature Date Phone: 9'4 5 0103(days); 3 .1'jj - a - % J (evenings) Project Name: C.srav,oma. C,cc4`. 5kr0 3'''.., Project Address: Q t %CANSL t3 6 t 01/4 Note: If you answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. *If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued. Bpcomm042004 7 Gafield County Building and Planning 108 8th Street Ste 201 Glenwood Springs, Colorado 970-945-8212 Plan analysis based on the 1997 Uniform Building Code Project Number: Date: June 14, 2004 Project Name: Gabossi Mini Storage Address: 0018 C.R. 138, Glenwood Springs, CO Contractor: Gabossi Occupancy: S1 Architect: Almahaymi Construction: II -N Engineer: Kesler Report By: A. Schwaller NOTE: The code items listed in this report are not intended to be a complete listing of all possible code requirements in the 1997 UBC. It is a guide to selected sections of the code. SEPARATION DIRECTION BOUNDARY AREA INCREASE FIRE PROTECTION NORTH Property line 102.0 Feet 102.0 Feet EAST Property line 35.0 Feet 35.0 Feet SOUTH Property line 50.0 Feet 50.0 Feet WEST Property line 102.0 Feet 102.0 Feet Allowable area increased 75.% for open area on 4 sides. -- Sec. 505.1 FL NAME OCC MAX FLR AREA ALLOWED RATIO STATUS 1 Warehouse- Mini S1 ok 12600 21000 0.6 ok TOTAL FOR FLOOR 12600 21000 0.6 ok BUILDING TOTAL 12600 21000 0.6 ok -- Sec. 504 and Table 5-B The actual height of this building is 9. feet. Page # 2 Code review for: Project Id.: Gabossi Mini Storage Address: 0018 C.R. 138, Glenwood Springs, CO EXTERIOR WALL FIRE RATINGS AND OPENING PROTECTION Table 5-A NORTH For Occupancy S1 EAST For Occupancy S1 SOUTH For Occupancy S1 WEST For Occupancy S1 Bearing Non -Bearing Wall Wall 0 hour 0 hour Bearing Non -Bearing Wall Wall 0 hour 0 hour Bearing Non -Bearing Wall Wall 0 hour 0 hour Bearing Non -Bearing Wall Wall 0 hour 0 hour Opening Construction Parapet Protection Material Required None Non -Comb No Opening Construction Parapet Protection Material Required None Non -Comb No Opening Construction Parapet Protection Material Required None Non -Comb No Opening Construction Parapet Protection Material Required None Non -Comb No None No fire protection requirements for openings. 3/4 hour Openings are to be protected with 3/4 hr fire assemblies. 50% of the area of the wall maximum. -- Table 5-A, Footnote 5 & Sec. 503.2.2 Maximum single window size is 84 sq.ft. with no dimension greater than 12 feet. -- Sec. 713.8 Not Allowed Openings are not permitted in this wall. OTHER ELEMENT Interior Bearing wall Interior nonbrg wall Structural Frame Exterior Struct Frame Roof/Ceiling Assembly End Wall of Building BUILDING ELEMENTS Table 6-A MATERIAL RATING Noncombustible 0 hr Noncombustible 0 hr Noncombustible 0 hr Noncombustible 0 hr Noncombustible 0 hr Noncombustible 1 hr NOTES See footnote #1 See footnote #2 FOOTNOTES: 1) Elements in an exterior wall located where openings are not permitted or where protection of openings is required, shall be protected against external fire exposure as required for exterior bearing walls or the structural frame, whichever is greater. -- Table 6-A, footnote 1 2) End walls facing another building -see Approved plans. Page # 3 Code review for: Project Id.: Gabossi Mini Storage Address: 0018 C.R. 138, Glenwood Springs, CO PENETRATIONS OF FIRERESISTIVE ASSEMBLIES WALLS ASSEMBLIES -- Sec. 709.6 Through penetrations: 1) Penetrations shall be installed as tested in the rated assembly. -- Sec. 709.6.2 2) Penetrations shall be protected by an approved penetration firestop system and shall have an F rating of not less than the required rating of the wall penetrated. -- Sec. 709.6.3 Exception: When penetrating items are steel, ferrous or copper pipes or steel conduits and the wall is concrete or masonry, the annular space shall be permitted to be grout or mortar. The minimum thickness is the thickness required to maintain the fire rating. The maximum size of the penetrating items is equivalent to a 6 -inch diameter and the opening is a maximum of 144 square inches. -- Sec. 709.6.1 Membrane penetrations: The requirements are the same as for through penetrations. -- Sec. 709.7 Exceptions: 1. Steel electrical outlet boxes that do not exceed 16 square inches provided that the area of such openings does not exceed 100 square inches for any 100 square feet of wall area. Boxes on opposite sides of the assembly shall be separated by a horizontal distance of not less than 24 inches. 2. Sprinklers with metal escutcheon plates. Noncombustible penetrating items shall not be connected to combustible materials on both sides of the membrane unless it can be confirmed that the fire -resistive integrity of wall is maintained. -- Sec. 709.7 Page # 4 Code review for: Project Id.: Gabossi Mini Storage Address: 0018 C.R. 138, Glenwood Springs, CO SMOKE and FIRE DAMPERS -- Sec. 713.10 and 713.11 Dampers shall be accessible for inspection and servicing: 1. Penetrations through area separation walls. Penetrations through occupancy separations. 2. Penetrations of the fire -resistive construction of horizontal exit walls or corridors serving as a means of egress. Exception: Openings for steel ducts penetrating the required fire -resistive construction of corridors are not required to have smoke dampers when such ducts are of not less than 0.019 -inch thickness (26 gage) and have no openings serving the corridor. 3. Penetrations of shaft enclosures. Exceptions: 1. Duct penetrations by steel exhaust air subducts extending vertically upward at least 22 inches above the top of the opening in a vented shaft where the airflow is upward. 2. Penetrations of a fire -resistive floor forming the base of a shaft enclosure may be protected by fire dampers listed for installation in the horizontal position. 3. Smoke dampers are not required when shaft is exhaust only, and is used for continuously operating fans. 4. Penetrations of the ceiling of fire -resistive floor -ceiling or roof -ceiling assemblies. Exception: Smoke dampers are not required. 5. Penetrations of an atrium enclosure element. Exception: Smoke dampers are not required. 6. Penetrations of exterior walls where protection of openings is required. Exception: Smoke dampers are not required. 7. Penetrations of areas of refuge. Exception: Ventilation system designed to supply outside air during an emergency. 8. Smoke dampers are required in smoke barriers and elevator lobbies. Page # 5 Code review for: Project Id.: Gabossi Mini Storage Address: 0018 C.R. 138, Glenwood Springs, CO EXIT REQUIREMENTS: FL NAME NUMB MIN MIN PANIC HALLWAY/ DOOR NOTES OCC EXITS WIDTH HDWR CORRIDOR SWING 1 Warehouse- Mini TOTAL 25 1 5.0 No N/A N/R 25 1 5.0 No N/A N/R Door swing is based on Sec. 1003.3.1.5 except as noted. Occupant load factor is based on Table 10-A. Number of exits is based on Table 10-A except as noted. Exit width is in inches and based on Sec. 1003.2.3 and Table 10-B Exit width is to be divided approximately equally among exits. -- Sec. 1003.2.3.2 Width shown for all areas is based on other egress components. Width shown for 1st floor is based on other egress components. Width shown for other floors & basements is based on stairways. -- Table 10-B For the minimum width of doors, see Sec. 1003.3.1.3 For the minimum width of hallways, see Sec. 1004.3.3.2 For the minimum width of corridors, see Sec. 1004.3.4.2 For the minimum width of stairways, see Sec. 1003.3.3.2 FOOTNOTES: FLUSH AND SURFACE BOLTS: Manually operated edge- or surface -mounted flush bolts and surface bolts or any other type of device that may be used to close or restrain the the door other than by operation of the locking device shall not be used. When automatic flush bolts are used, the door leaf having the automatic flush bolt shall not have a door knob or surface -mounted hardware. The unlatching of any leaf shall not require more than one operation. -- Sec. 1003.3.1.8 LOCKS AND LATCHES: Regardless of the occupant load served, exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. -- Sec. 1003.3.1.8 Key -locking hardware may be used on the main exit when the main exit consists of a single door or pair of doors if there is a sign stating THIS DOOR MUST REMAIN UNLOCKED DURING BUSINESS HOURS. When unlocked, door(s) must swing without operation of any latching device. -- exc. Page # 6 Code review for: Project Id.: Gabossi Mini Storage Address: 0018 C.R. 138, Glenwood Springs, CO LANDINGS AT DOORS: 1) A floor or landing shall be provided on each side of doors. When access for persons with disabilities is required. the floor or landing shall not be more than 1/2 inch lower than the threshold. When access is not required, the maximum is 1 inch. -- Sec. 1003.3.1.6 2) Landings shall have a width not less than the width of the stairway or width of the doorway, whichever is the greater. Where a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing dimension to less than one half it required width. The minimum length in the direction of exit travel is 44 inches. -- Sec. 1003.3.1.7 TRAVEL DISTANCE: (distance to an exit) The maximum travel distance in this building is 200 feet. Sec. 1004.2.5. The travel distance for the major occupancy may be 300 feet. -- Sec. 1004.2.5.2.5 Travel distance shall not be limited within an exit enclosure or exit passageway. -- Sec. 1005.2.2 Page # 7 Code review for: Project Id.: Gabossi Mini Storage Address: 0018 C.R. 138, Glenwood Springs, CO BUILDING ACCESSIBILITY: 1) This building including each tenant shall be provided with at least one entrance which complies with the accessible route provisions of CABO/ANSI A117.1. At least 50 percent of all entrances shall be accessible. -- Sec. 1103.2.3 2) When more that one exit is required from any accessible space, each accessible portion of the space shall be served by not less than two accessible means of egress. -- Sec. 1104.1.1 3) When an exit stairway is part of an accessible means of egress, the stairway shall have a clear width of not less than 48 inches between the handrails. The stairway shall either incorporate an area of refuge within an enlarged story -level landing or shall be accessed from an area of refuge. -- Sec. 1104.1.2 The area of refuge shall have direct access to the stairway that serves it. -- Sec. 1104.2.1 4) Each area of refuge shall be sized to accommodate one wheelchair space not less than 30 inches by 48 inches for each 200 occupants, or portion thereof. -- Sec. 1104.2.3 5) If the area of refuge is not within the stairway, it shall be separated from the rest of the story by a smoke barrier having at least a one- hour fire -resistance rating. Smoke barriers shall extend to the roof or floor deck above. Doors shall be smoke and draft control assemblies with a rating not less than 20 minutes. -- Sec. 1104.2.4 6) Two-way communications are required. -- Sec. 1104.2.5 7) Each area must be identified by a sign stating AREA OF REFUGE and the international symbol of accessibility. -- Sec. 1104.2.7 8) NOTE: Exit stairways in buildings protected throughout by an approved automatic sprinkler system are NOT required to incorporate an area of refuge. -- Sec. 1104.1.2, Exception 2 ROOFING REQUIREMENTS: 1) The roofing on this building is required to be -- Table 15-A 2) See section 1504 and ICBG research reports for Class B or better. requirements. Page # 8 Code review for: Project Id.: Gabossi Mini Storage Address: 0018 C.R. 138, Glenwood Springs, CO WALL AND CEILING FINISH: 1) Wall and ceiling finish materials are required to comply with Sec. 804.1 and Table 8-B. 2) Carpeting on the ceiling is required to have a Class I flame spread rating. -- Sec. 804.2 3) Textile wall coverings shall have Class I flame spread rating. and shall be protected by automatic sprinklers or meet the acceptance criteria of U B.C. Standard No. 8-2 -- Sec. 805 4) Toilet room floors shall have a smooth, hard nonabsorbent surface that extends upward onto the walls at least 5 inches. - - Sec. 807.1.1 5) Walls within 2 feet of the front and sides of urinals and water closets shall have a smooth, hard nonabsorbent surface. - - Sec. 807.1.2 INSULATION NOTES: 1) All insulation material including facings are required to have a flame -spread rating of 25 or less and a maximum smoke density of 450. - - Sec. 707.3 2) Foam plastic insulations are required to be protected. Sec. 2602 Page # 9 Code review for: Project Id.: Gabossi Mini Storage Address: 0018 C.R. 138, Glenwood Springs, CO GLAZING REQUIREMENTS All glazing in hazardous locations is required to be of safety glazing material. Sec 2406.3 & 2406.4 Locations: 1) Glazing in ingress and egress doors except jalousies. 2) Glazing in fixed and sliding panels of sliding door assemblies and panels in swinging doors other than wardrobe doors. 3) Glazing in storm doors. 4) Glazing in all unframed swinging doors. 5) Glazing in doors and enclosures for hot tubs, whirlpools, saunas, steam rooms, bathtubs and showers. Glazing in any portion of a building wall enclosing these compartments where the bottom exposed edge of the glazing is less than 60 inches above a standing surface and drain inlet. 6) Glazing in fixed or operable panels adjacent to a door where the nearest exposed edge of the glazing is within a 24 -inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the walking surface. 7) Glazing in an individual fixed or operable panel, other than those locations described in items 5 and 6 above, than meets all of the following conditions: A. Exposed area of an individual pane greater than 9 square feet. B. Exposed bottom edge less than 18 inches above the floor. C. Exposed top edge greater than 36 inches above the floor. D. One or more walking surfaces within 36 inches horizontally of the plane of the glazing. 8) Glazing in railings regardless of height above a walking surface. Included are structural baluster panels and nonstructural in -fill panels. 9) Glazing in walls and fences used as the barrier for indoor and outdoor swimming pools and spas when the bottom edges is less than 60 inches above the pool side and the glazing is within 5 feet of the pool or spa water's edge. 10) Glazing in walls enclosing stairway landings or within 5 feet of then bottom and top of stairways where the bottom edge is less than 60 inches above the walking surface. No ?%0-a Job Addr ss 60) A L Owner .�� j Contractor (14/ Setbacks:�Front l71 Soils Test Footing %—to—O'fl — Foundation 7-/-041r4— Grout Underground Plumbing Rough Plumbing Framing 7 -40-cX(%7 - Insulation Roofing Drywall Gas Piping Assessor's Parcel Nod/C2 3-3 'Ot •/g'7 Date 29 GQ['O4t /32 BUILDING PERMIT CARD e. C� SAddressqLWSc Phone #3.C7V P1ns Address Phone #99s-92')3 RH LH Zoning INSPECTIONS Weatherproofing Mechanical Electrical Rough (State) Electri al F' al S te) Final • 0 klist Completed'? t/ Certificate Occupancy # Date Septic System # Date Final Other NOTES (continue on back) , :INSPECTION INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT ,GARFIELD COUNTY, COLORADO Date Issued. /014 Zoned Area Permit No 9 "a`w. AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector And IMMEDIATELY BECOME NULL ,SND VOID. Use 're'3LOAaliw �!_ Address or Legal Descriptionet:j lith.)S Ownr '�,,� . OSS Illi Contractort..S�Y\ nisr Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing 7 , 0 y i Foundation 2—q _ 0C( ! Undergrouid Plumbing Insulation Atif Rough Plumbing Drywall /14 Chimney & Vent , Electric Final (by State Inspector) Gas Piping a.� Final Stip (o Valk Electric Rough (By State Inspect r) Septic Final ,v Framing -Z— Ca—ov (To include Roof in place and indoors and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado. APPROVEDDO NOT DESTROY THIS CARD IF PLACED OUTSIDE - >t ER WITH CLEAR PLASTIC Y