HomeMy WebLinkAbout1.01 Civil Landscape Cost EstimateRICK ENc NFERING COMPANY Ind FEDEX GROUND FACILITY REC JN 4143 PRELIMINARY OPINION OF PROBABLE CONSTRUCTION COST 07.22.2014 ITEM DESCRIPTION QUANTITY UNIT UNIT COST COST A GRADING 1 MOBILIZATION 1 LS $4,000.00 $4,000 2 CLEAR AND GRUB 4.6 AC $1,200.00 $5,520 3 EARTHWORK - CUT 14,000 CY $3.00 $42,000 4 IMPORT/EXPORT 9,600 CY $10.00 $96,000 5 PRECOMPACTION 8,815 SY $0.40 $3,526 6 OVER-EXCAVACTION/RECOMPACTION 8,815 CY $3.00 $26,445 7 RETAINING WALL (0'-5') 950 SF $16.00 $15,200 8 SLOPE REVEGATATION 60,350 SF $0.50 $30,175 9 SWPPP 4.6 AC $1,500.00 $6,900 10 CONSTRUCTION WATER 4.6 AC $2,500.00 $11,500 GRADING SUBTOTAL $241,266 B PAVING 1 SUBGRADE PREPARATION 8,815 SY $1.65 $14,545 2 CUT/BACKFILL CURB GRADE 3,277 LF $4.10 $13,436 3 12" STONE PAVEMENT 3,277 SY $14.01 $45,911 4 20" STONE PAVEMENT 5,155 SY $23.35 $120,369 5 6" CONCRETE PAVEMENT 517 SY $18.27 $9,446 6 6" VERTICAL CURB 3,277 LF $11.50 $37,686 7 4" THICK/5' WIDE SIDEWALK 2,571 SF $4.50 $11,570 8 HANDICAP RAMP - MID -BLOCK 2 EA $1,800.00 $3,600 9 TYPE "B" POST BARRICADE 11 EA $200.00 $2,200 10 PERIMETER FENCING 1,380 LF $23.00 $31,740 11 PAVEMENT STRIPING 2,417 LF $0.50 $1,209 12 STOP SIGN 2 EA $200.00 $400 13 ONSITE SIGNAGE 12 EA $150.00 $1,800 14 REMOVAL OF EXISTING BUILDING 1 LS $8,000.00 $8,000 PAVING SUBTOTAL $301,910 C SEWER 1 4" SDR -35 PVC SEWER 570 LF $26.50 $15,105 F:\4143_FedEx_Glenwood\Admin\Sched_Cost_Specs\4143_cost_estimate_County.xlsx Page 1 of 3 ITEM DESCRIPTION QUANTITY UNIT UNIT COST COST 2 CLEANOUT 7 EA $675.00 $4,725 3 INSPECTION FEE 5 ERQ $1,500.00 $7,500 4 1500 GPM SEPTIC TANK 1 LS 5 LEACH FIELD 1 LS SEWER SUBTOTAL $27,330 D WATER 1 1" PVC SCHEDULE 40 WATER 507 LF $4.00 $2,028 2 6" C-900 PVC WATER 391 LF $30.00 $11,730 3 6" VALVE B&C 1 EA $820.00 $820 4 INSPECTION FEE 5 EQR $2,500.00 $12,500 5 STORAGE TANK 1 LS 6 PUMP STATION 1 LS WATER SUBTOTAL $27,078 E DRAINAGE 1 18" HDPE 397 LF $55.00 $21,835 2 12" HDPE 531 LF $50.00 $26,550 3 DUMPED RIP RAP, d50=8", t=16" 3,750 SF $3.50 $13,125 4 HAND PLACED RIP RAP, d50=8", t=8" 300 SF $3.00 $900 5 GROUTED RIP RAP 2,125 SF $6.50 $13,813 6 24" DRAIN BASIN 1 EA $800.00 $800 7 CDOT CATCH BASIN TYPE C 2 EA $4,000.00 $8,000 8 2'X2' CURB INLET STRUCTURE 1 EA $1,820.00 $1,820 DRAINAGE SUBTOTAL $86,843 F UTILITIES 1 JOINT UTILITY TRENCH AND BACKFILL 896 LF $9.50 $8,512 2 TRANSFORMER PAD 1 EA $450.00 $450 UTILITIES SUBTOTAL $8,962 CONSTRUCTION SUBTOTAL COLORADO TAX 8.60% CONSTRUCTION TOTAL OBSERVATION & STAKING SOILS TESTING 10% CONTINGENCY PROJECT TOTAL NUMBER OF LOTS $693,388 $59,631 $753,019 $7,500 $10,000 $75,302 $845,821 1 F:\4143_ FedEx_Glenwood\Admin\Sched_Cost_Specs\4143_cost_estimate_County.xlsx Page 2 of 3 ITEM IDESCRIPTION COST PER LOT (QUANTITY' UNIT I UNIT COST I COST $845,821 EXCLUSIONS: - LANDSCAPE AND IRRIGATION, HARDSCAPE, PERIMETER WALLS AND PATIO WALLS. -ENTRY FEATURES AND SIGNAGE. - ACCENT PAVING (IF APPLICABLE). -SIDE LOT TO SIDE LOT RETAINING WALLS (IF REQUIRED). - UTILITY COMPANY CHARGES. NOTES: -DUE TO THE RAPIDLY SIGNIFICANTLY RISING COST OF CONSTRUCTION MATERIALS, THE UNIT COSTS SHOWN SHOULD NOT BE CONSIDERED CURRENT, AND THIS PRELIMINARY OPINION OF PROBABLE CONSTRUCTION COST SHOULD BE CONSIDERED AS AN ORDER -OF - MAGNITUDE OPINION OF CONSTRUCTION COSTS. - THIS IS A PRELIMINARY OPINION OF PROBABLE CONSTRUCTION COSTS AND IS FOR OUR CLIENT'S USE ONLY. IN PROVIDING AN OPINION OF PROBABLE CONSTRUCTION COSTS, THE CLIENT UNDERSTANDS THAT THE ENGINEER HAS NO CONTROL OVER COSTS OR THE PRICE OF LABOR, EQUIPMENT OR MATERIALS, OR OVER THE CONTRACTOR'S METHOD OF PRICING, AND THAT THE OPINIONS OF PROBABLE CONSTRUCTION COSTS PROVIDED ARE TO BE MADE ON THE BASIS OF THE ENGINEER'S QUALIFICATIONS AND EXPERIENCE. THE ENGINEER MAKES NO WARRANTY, EXPRESSED OR IMPLIED, AS TO THE ACCURACY OF SUCH OPINIONS AS COMPARED TO ACTUAL BID COSTS. -UNIT PRICES FOR THIS ESTIMATE ARE BASED UPON RESEARCH OF PROJECTS OF SIMILAR SIZE AND SCOPE AND SHOULD NOT BE CONSIDERED AS A MAXIMUM UNIT PRICE NOR SHOULD THE TOTAL CONSTRUCTION COSTS BE INTERPRETED AS THE MAXIMUM POSSIBLE CONSTRUCTION COSTS FOR THESE ITEMS. -PRELIMINARY OPINION OF PROBABLE CONSTRUCTION COST BASED ON THE DEVELOPMENT PACKAGE FOR FEDEX GROUND FACILITY PLANS DATED 07-22-2014 PREPARED BY RICK ENGINEERING COMPANY F:\4143_ FedEx_Glenwood\Admin\Sched_Cost_Specs\4143_cost_estimate_County.xlsx Page 3 of 3 Cost Estimate For: FedEx GARFIELD COUNTY Prepared for Design Fusion July 21, 2014 This cost estimate does not include prices for permit fees, utilities, sidewalks, street/open space lighting, or maintenance. (.74) Cardnv Shaping the Future LANDSCAPE ITEM DESCRIPTION QTY. UNIT COST TOTAL 17 2" Caliper Trees (Nursery) 24 ea. $ 400.00 $ 9,600.00 18 6' Height Trees (Nursery) 13 ea. $ 300.00 $ 3,900.00 20 5 Gal. Shrubs (Nursery) 79 ea. $ 22.00 $ 1,738.00 21 1 Gal. Shrubs (Nursery) 31 ea. $ 10.00 $ 310.00 29 Native Seed Mix 58,824 s.f. $ 0.15 $ 8,823.60 33 Bark Mulch 9,485 s.f. $ 0.30 $ 2,845.50 SUBTOTAL: $ 27,217.10 IRRIGATION ITEM DESCRIPTION QTY. UNIT COST TOTAL 38 Drip Irrigation 34,425 s.f. $ 0.35 $ 12,048.75 40 Native Seed Mix Watering (until established; 58,824 s.f. $ 0.10 $ 5,882.40 SUBTOTAL: TOTAL: $ 17,931.15 $ 45,148.25 10% CONTINGENCY: $ 4,514.83 GRAND TOTAL: $ 49,663.08