Loading...
HomeMy WebLinkAbout1.05 Traffic StudyFEDERAL EXPRESS GROUND DISTRIBUTION FACILITY TRAFFIC IMPACT ANALYSIS GARFIELD COUNTY July 17, 2014 Prepared for: Kiernan West, LLC 941 Orange Avenue, #512 Coronado, CA 92118 Prepared by: RICK ENGINEERING COMPANY Traffic Division Job Number 17237A TABLE OF CONTENTS Introduction 1 Project Description 1 Existing Transportation Conditions 1 Existing Traffic Volumes 4 Traffic Analysis Methodology 7 Existing (2014) Traffic Operations 7 Opening Year (2015) Without Project Traffic Volumes 10 Opening Year (2015) Without Project Traffic Analysis 10 Project Traffic Generation 10 Trip Distribution/Assignment 10 Opening Year (2015) With Project Traffic Analysis 18 Turn Template Analysis 18 Conclusions/Recommendations 18 References 25 Appendices Appendix A — Traffic Volume Counts Appendix B — Intersection Calculation Sheets Appendix C — Trip Generation Appendix D — Turning Templates Tables 1. Existing Roadway Segment Operations 8 2. Existing Intersection Operations 9 3. Opening Year (2015) Without Project Roadway Segment Operations 12 4. Opening Year (2015) Without Project Intersection Operations 13 5. Traffic Generation 14 6. Opening Year (2015) With Project Roadway Segment Operations 19 7. Opening Year (2015) With Project Intersection Operations 20 8. Roadway Segment Operations Summary 21 9. Intersection Operations Summary 22 Exhibits 1. Project Vicinity Map 2 2. Proposed Site Plan 3 3. Existing Transportation Conditions 5 4. Existing Traffic Volumes 6 5. Opening Year (2015) Without Project Traffic Volumes 11 6. Project Traffic Distribution 15 7. Project Traffic Assignment 16 8. Opening Year (2015) With Project Traffic Volumes 17 9. Project Access Recommendations 24 10. Single Unit Truck Turning Template - Roundabout Appendix D 11. Single Unit Truck Turning Template - Driveway Appendix D 12. WB -67D Truck Turning Template - Roundabout Appendix D 13. WB -67D Truck Turning Template - Driveway Appendix D FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY TRAFFIC IMPACT ANALYSIS GARFIELD COUNTY July 17, 2014 INTRODUCTION The following Traffic Impact Analysis (TIA) has been prepared to determine any traffic -related impacts within the project area roadways and intersections due to the proposed development of the Federal Express Ground Distribution Facility project. The project site is located east of the Glenwood Springs Municipal Airport within Garfield County. Exhibit 1 shows the project vicinity map. PROJECT DESCRIPTION The project proposes to construct a 26,795 SF building that will operate as a sorting and distribution facility serving the greater Glenwood Springs area. Access to the project site will be via one full access point off of Airport Center Road. It should be noted that the site will not be open to the general public. Additionally, it is expected that all truck and employee traffic will travel to/from State Highway 82 (SH -82) via Airport Center Road, Airport Road, Midland Avenue and 27th Street. No Federal Express operations related traffic along Sky Ranch Road or other nearby residential roads and streets is anticipated. It should also be noted that currently the City of Glenwood Springs along with other state and federal agencies is analyzing the need for a second access to SH -82. The project which is currently being called the South Bridge Project is in the planning stages and no location has being selected. Therefore, as this project is anticipated to be constructed and in operation prior to the South Bridge Project, this TIA does not analyze the South Bridge as an access to SH -82. Exhibit 2 shows the proposed project site plan. EXISTING TRANSPORTATION CONDITIONS Although the Federal Express Ground Distribution Facility will be located within Garfield County, traffic for the project will travel along both Garfield County and City of Glenwood Springs roadways. The following is a brief description of County and City roadways within the project area. Midland Avenue is classified as a Minor Arterial within the project area. Midland Avenue is a 2 - lane undivided roadway that provides one vehicle travel lanes in each direction. The posted speed limit is 25 mph and no on street parking is provided. The intersection of Midland Avenue and 27th Street is controlled by a roundabout. It should be noted that south of 4 Mile Road the name changes to Airport Road. Mt. Sopris Drive is classified as a Neighborhood Collector within the project area. Mt. Sopris Drive is a 2 -lane undivided roadway that provides one vehicle travel lane in each direction. The posted speed limit is 20 mph and on street parking is permitted. -- � �. � 0 O PROPOS. PROJECT SITE RICK ENGINEERING COMPANY EXHIBIT 1 PROJECT VICINITY MAP FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY TRAFFIC IMPACT ANALYSIS NOT TO SCALE 2 Rick Engineering Company 0 O NOT TO SCALE RICK ENGINEERING COMPANY EXHIBIT 2 PROPOSED SITE PLAN FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY TRAFFIC IMPACT ANALYSIS 3 27th Street is classified as a Minor Arterial within the project area. 27th Street is a 2 -lane undivided roadway that provides one vehicle travel lane in each direction. The speed limit is 25 mph and on street parking is prohibited. As previously mentioned, there is a roundabout at its intersection with Midland Avenue. Grand Avenue is classified as a Minor Arterial within the project area. Grand Avenue is a 2 -lane undivided roadway that provides one vehicle travel lane in each direction. The posted speed limit is 25 mph and on street parking is not permitted. Airport Road is currently an unclassified roadway within Garfield County. Airport Road is a 2 - lane undivided roadway that provides one vehicle travel lane in each direction and on street parking is not permitted. 4 Mile Road is classified as a Minor Collector within Garfield County. 4 Mile Road is a 2 -lane undivided roadway that provides one travel lane in each direction. The posted speed limit is 25 mph and on street parking is not permitted. Airport Center Road is currently an unclassified roadway within Garfield County. Airport Center Road is a 2 -lane undivided roadway that provides one vehicle travel lane in each direction and on street parking is not permitted. Exhibit 3 shows the existing transportation conditions within the project area. EXISTING TRAFFIC VOLUMES This TIA analyzes the following intersection within the project area: • 27th Street/Grand Avenue (Signalized) • Midland Avenue/27th Street (Roundabout) • Midland Avenue/Mt. Sopris Drive (Unsignalized) The following roadway segments were also analyzed: • Midland Avenue, 27th street to Airport Road • Airport Center Road, east of Airport Road Existing traffic volumes at the project area intersections were obtained from traffic counts conducted by All Traffic Data Services, Inc. on Tuesday, June 10, 2014. The turning movement counts were conducted during the AM (7-9) and PM (4-6) peak periods. Additionally, tube counts were done at Airport Center Road east of Airport Road and at Midland Avenue south of 27th Street. Exhibit 4 shows the existing intersection turning movement counts and ADT's within the study area. Appendix A contains the traffic volume count sheets. It should be noted that area schools were not in session during the collection of the traffic volume counts. To account for school related traffic for Sopris Elementary School, the turning movements at the intersection of Midland Avenue/Mt. Sopris Drive were adjusted to match the traffic volumes shown in the Glenwood Ridge Traffic Impact Study dated March 25, 2014. 4 Rick Engineering Company NOT TO SCALE RICK ENGINEERING COMPANY EXHIBIT 3 _EGEND EXISTING TRANSPORTATION CONDITIONS FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY TRAFFIC IMPACT ANALYSIS TS = EXISTING TRAFFIC SIGNAL = EXISTING LANE = EXISTING STOP/YIELD CONTROL = ROUNDABOUT 5 c N 5 0 r a O O n v 0 0 a 0 i 0t m O . O L C a O U , U O p C a O so L + L O X 3 N / 0 0 0 O O N O r T M (� N - T i 0 n 0) L 2 L X O N O0 0 O O 0, IrTZS r L N m, N 1 » �T ▪ N Rick Engineering Company "D21/ -5q35 t-- 13/37 86/451 22/29 27TH ST WA7tr 26 rviv m ,o - -4 00 00 i 0 0 279/130 ,S)6> 18/16 MT, SOPRIS 0R -53Q NOTE: THE TURNING MOVEMENTS AT THE INTERSECTION OF MIDLAND AVENUE/MT. SOPRIS DRIVE WERE ADJUSTED TO MATCH THE VOLUMES IN THE GLENWOOD RIDGE TIS TO ACCOUNT FOR SCHOOL RELATED TRAFFIC '\ NOT TO SCALE RICK ENGINEERING COMPANY EXHIBIT 4 LEGEND EXISTING TRAFFIC VOLUMES FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY TRAFFIC IMPACT ANALYSIS xxxx = ADT xxxx/xxxx = AM/PM PEAK HR 6 c 0 a 0 17 7, n 0 0 n v 0 17 a 0 00 0 of L -0a 0 00 1 Q o o L + L I p 0 3 0 0 0 O 1 N O 1 T M (� a0) LD x o N 0 O 0 0 tN 0 _1- L „Q 7o M } i N 1 Z » L 7 1-'N TRAFFIC ANALYSIS METHODOLOGY The intersections and roadways within the project area were analyzed for the following scenarios: • Existing (2014) • Opening year (2015) without Project: Existing + Ambient Growth + Background Traffic • Opening year (2015) with project traffic: Existing + Ambient Growth + Background Traffic + Project Traffic The Level of Service (LOS) for signalized intersections was calculated using the methodologies described in Chapter 18 of the 2010 Highway Capacity Manual (HCM). The LOS for signalized intersections is defined in terms of control delay, which is made up of a number of factors that relate to right-of-way control, geometrics and traffic volumes. The signalized intersection analysis also takes into account intersection spacing and coordination. The LOS for unsignalized intersections was calculated using the methodologies described in Chapters 19 and 20 of the 2010 HCM. The LOS for an unsignalized (two-way stop controlled) intersection is determined by the computed control delay for each minor street movement and major street left -turns, and not for the intersection as a whole. The LOS for an unsignalized (all - way stop controlled) intersection is determined by the computed control delay for the intersection as a whole. The LOS for roundabout intersections was calculated using the methodologies described in Chapters 21 of the 2010 HCM. The LOS for a roundabout intersection is determined similarly to a two-way and all -way stop controlled intersections, adjusting for the effect of yield control. LOS A through D is considered acceptable for peak hour intersection operations. The project area intersections were analyzed during the AM peak hour. The intersection calculation sheets are contained in Appendix B. The LOS for daily roadway segment operations was calculated based on volume to capacity ratios. LOS A through D is considered acceptable for urbanized areas. EXISTING (2014) TRAFFIC OPERATIONS Table 1 shows that the studied street segments currently operate at LOS A on a daily basis. Table 2 shows that the 27th Street/Grand Avenue signalized intersection currently operates at LOS B or better during both the AM and PM peak hours. Table 2 shows that the Midland Avenue/27th Street roundabout currently operates at LOS C or better during both the AM and PM peak hours. Table 2 shows that all critical movements of the Midland Avenue/Mt. Sopris Drive and Midland Avenue/4 Mile Road unsignalized intersections currently operate at LOS C or better during both the AM and PM peak hours. TABLE 1 EXISTING ROADWAY SEGMENT OPERATIONS Roadway Segment Classification LOS E Capacity Existing Volume V/C LOS Midland Avenue 27th Street to Airport Road Arterial 15,000 7,907 0.53 A Airport Center Road East of Airport Road Collector 5,000 149 0.03 A files\17237\table\17237a.001.xis 8 6/20/2014 TABLE 2 EXISTING INTERSECTION OPERATIONS INTERSECTION EXISTING DELAY LOS 27th Street/Grand Avenue (S) AM Peak 7.1 A PM Peak 10.9 B Midland Avenue/27th Street (R) AM Peak 10.0 B PM Peak 19.8 C Midland Avenue/Mt. Sopris Drive (U) AM Peak SBL 8.3 A WB L 16.9 C WB R 12.4 B PM Peak SBL 7.9 A WB L 17.9 C WB R 9.7 A Midland Avenue/4 Mile Road (U) AM Peak EB TR 10.5 B WB LT 12.7 B NB LR 7.3 A PM Peak EB TR 10.4 B WB LT 11.3 B NB LR 7.3 A Note: Delays and Level of Service calculated utilizing the methodologies described in Chapters 18, 19 and 21 of the 2010 Highway Capacity Manual (HCM). DELAY is measured in seconds LOS = Level of Service NB = northbound, SB=southbound, etc. T=thru movement, L=left-turn movement, etc. (S) = Signalized intersection (U) = Unsignalized intersection (R) - Roundabout files\17237\table\17237a.002.xls 6/22/2014 9 OPENING YEAR (2015) WITHOUT PROJECT TRAFFIC VOLUMES As discussed with City of Glenwood Springs Engineering Staff, a 2% growth rate was applied to 2014 existing traffic volumes to account for ambient growth and background traffic. Exhibit 5 shows the opening year (2015) without project traffic volumes. OPENING YEAR (2015) WITHOUT PROJECT TRAFFIC ANALYSIS Table 3 shows that the studied street segments are anticipated to continue to operate at LOS A on a daily basis. Table 4 shows that the 27th Street/Grand Avenue signalized intersection is anticipated to continue to operate at LOS B or better during both the AM and PM peak hours. Table 4 shows that the Midland Avenue/27th Street roundabout is anticipated to continue to operate at LOS C or better during both the AM and PM peak hours. Table 4 shows that all critical movements of the Midland Avenue/Mt. Sopris Drive and Midland Avenue/4 Mile Road unsignalized intersections are anticipated to continue to operate at LOS C or better during both the AM and PM peak hours. PROJECT TRAFFIC GENERATION The project traffic generation for the Federal Express Ground Distribution Facility was calculated based on data provided from Federal Express at similar facilities. It is projected that the proposed facility will operate 6 days a week with terminal operation for trailers and 5 days per week terminal operation for pick-up and delivery. Based on this it is anticipated that the proposed Federal Express facility at build -out will generate a total of 230 ADT with 47 trips (24 inbound/23 outbound) during the AM peak hour and 44 trips (24 inbound/20 outbound) during the PM peak hour. It should also be noted that this facility will not be open to the general public. Table 5 shows the traffic generation. The trip generation calculations sheet is contained in Appendix C. TRIP DISTRIBUTION/ASSIGNMENT The site traffic distribution was estimated based on the site's proximity to the nearby major roadways, existing local traffic patterns and existing traffic counts at the project area intersections. It is expected that all truck and employee traffic will travel to/from SH -82 via Airport Center Road, Airport Road, Midland Avenue and 27th Street. No Federal Express operations related traffic along Sky Ranch Road or other nearby residential roads and streets is anticipated. Exhibit 6 shows the project traffic distribution percentages utilized for assigning the project trips. Exhibit 7 shows the primary project traffic trip assignment for opening year (2015). Once the project distribution has been established, the project traffic volumes were added to the project area intersections and roadways. Exhibit 8 shows the opening year (2015) with project traffic volumes (including existing, ambient growth, and project traffic). 10 Rick Engineering Company 0- O � �8q iQAQ g3�13�31 t-- 13/38 -- 88/460 F-22/30 27TH ST 0 O m N N W 0)0- 0)0)0) mmw 0o c0 285/133 18 / 10 r -MT, S0PRI5 00 3,n 9s -moo -3 v SS�� 0,80 Q S 97 o m NOT TO SCALE RICKM ENGINEERING COMPANY EXHIBIT 5 LEGEND OPENING YEAR WITHOUT PROJECT TRAFFIC VOLUMES FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY TRAFFIC IMPACT ANALYSIS xxxx = ADT xxxx/xxxx = AM/PM PEAK HR 11 0 0 a w 0 L 0 0) n 0 0 0 ✓ 0 a 0 + 0 0 L 0Ja O > o 1 a O 0 L Y + L p D 3 D / 0 o o 0 0 N O T M � N - r + , 0 a 0) •- v L 0 X O 0 0 , 0 O O } M � 0 _0) 7 „Q N Iz C, » +,N TABLE 3 OPENING YEAR (2015) WITHOUT PROJECT ROADWAY SEGMENT OPERATIONS Roadway Segment Classification LOS E Capacity 2015 Non -Site (Background Only) Volume V/C LOS Midland Avenue 27th Street to Airport Road Arterial 15,000 8,065 0.54 A Airport Center Road East of Airport Road Collector 5,000 152 0.03 A files\17237\table\17237a.003.xls 6/20/2014 12 TABLE 4 OPENING YEAR (2015) WITHOUT PROJECT INTERSECTION OPERATIONS INTERSECTION 2015 NON -SITE (BACKGROUND ONLY) DELAY LOS 27th Street/Grand Avenue (S) AM Peak 7.2 A PM Peak 11.2 B Midland Avenue/27th Street (R) AM Peak 10.3 B PM Peak 21.5 C Midland Avenue/Mt. Sopris Drive (U) AM Peak SBL 8.3 A WB L 17.2 C WB R 12.6 B PM Peak SBL 7.9 A WB L 18.3 C WB R 9.7 A Midland Avenue/4 Mile Road (U) AM Peak EB TR 10.5 B WB LT 12.9 B NB LR 7.3 A PM Peak EB TR 10.4 B WB LT 11.3 B NB LR 7.3 A Note: Delays and Level of Service calculated utilizing the methodologies described in Chapters 18, 19 and 21 of the 2010 Highway Capacity Manual (HCM). DELAY is measured in seconds LOS = Level of Service NB = northbound, SB=southbound, etc. T=thru movement, L=left-turn movement, etc. (S) = Signalized intersection (U) = Unsignalized intersection (R) - Roundabout files\17237\table\17237a.004.xls 6/22/2014 13 TABLE 5 FEDERAL EXPRESS GROUND DISTRIBUTION CENTER TRAFFIC GENERATION LAND USE ADT AM PEAK PM PEAK VOLUME VOLUME IN OUT IN OUT Federal Express 230 I 24 23 24 20 Note: Traffic generation based on data provided from Federal Express at similar facilities. files\17237\table\17237a.005.xls 7/17/2014 14 Rick Engineering Company OCV O NOT TO SCALE RICK ENGINEERING COMPANY EXHIBIT 6 PROJECT TRAFFIC DISTRIBUTION FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY TRAFFIC IMPACT ANALYSIS 15 C N 0 E 0 C 0 01 O a L N U 1 o t O •- a v o � oin r o N o N 0 a 10 L •- 0 L 0 X W v 0 p o O Q I / O 0 + a - p E D 0 • O Ut 3 T l0 t O C O 0 N O I C N C / N p 10 L QO O 0 0 0 7 10 0 • 0 0 0 I" L N N } N 1- » L 7 H / Rick Engineering Company -- 24/29 27TH ST N 7J O D z 0 W 0 O A G-3 MT, SOPRIS OR 0 r fel 0 0 -23 NOT TO SCALE RICKM ENGINEERING COMPANY EXHIBIT 7 LEGEND PROJECT TRAFFIC ASSIGNMENT FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY TRAFFIC IMPACT ANALYSIS xxxx = ADT xxxx/xxxx = AM/PM PEAK HR 16 c m n 0 L tri 0 �0) • -0 0 - N > O O L U O - p L — N v o � 0 1> o o r- 7 i v } • a 0 L 0 X w } Q p N L O a O 0 O } Q E D L • 0 Ut 3 T l0 O C O 0 N 0 U T 1 N C N C / N t / L 0 p L Q 0 0 0 7 0 0 0 0 0 + • L 7Q L N ti » H / Rick Engineering Company OCN O 0w ow o� N 7J �0. q()°l 31 t-- 13/38 —112/484 F-22/30 27TH ST z 0 Co D N m L9 285/133 18/16 7��� MT, SOPRIS 0R S69 0 9 p„ S 6 fri4 c. ��3/20 m \ \ ORIV EW AY NOT TO SCALE RICK ENGINEERING COMPANY EXHIBIT 8 LEGEND OPENING YEAR WITH PROJECT TRAFFIC VOLUMES FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY TRAFFIC IMPACT ANALYSIS xxxx = ADT xxxx/xxxx = AM/PM PEAK HR 17 OPENING YEAR (2015) WITH PROJECT TRAFFIC ANALYSIS Table 6 shows that the studied street segments are anticipated to continue to operate at LOS A on a daily basis. Table 7 shows that the 27th Street/Grand Avenue signalized intersection is anticipated to continue to operate at LOS B or better during both the AM and PM peak hours. Table 7 shows that the Midland Avenue/27th Street roundabout is anticipated to continue to operate at LOS C or better during both the AM and PM peak hours. Table 7 shows that all critical movements of the Midland Avenue/Mt. Sopris Drive and Midland Avenue/4 Mile Road unsignalized intersections are anticipated to continue to operate at LOS C or better during both the AM and PM peak hours. Table 7 also shows that the project driveway along Airport Center Road is anticipated to operate at LOS A for both the AM and PM peak hours. Table 8 shows a summary of all studied project roadway segments, and Table 9 shows a summary of all studied project intersections. TURN TEMPLATE ANAYLSIS Truck turning templates were analyzed at the Midland Avenue/27th Street Roundabout and at Airport Center Road/Project Driveway, to determine if Federal Express trucks accessing the proposed site will be able to maneuver through the intersections safely without impacting other vehicles or fixed objects. Based on information provided by the client, the AASHTO SU single unit truck and the WB -67D dual trailer truck most closely resemble the anticipated delivery trucks. As shown in Exhibits 10 through 13, the trucks are anticipated to be able to safely maneuver through the intersections, without negatively impacting other vehicles or fixed objects. Refer to Appendix D for the truck turning templates. CONCLUSIONS/RECOMMENDATIONS The TIA evaluated any potential traffic impacts due to the proposed Federal Express Ground Distribution Facility project. The project is anticipated to generate 230 ADT, with 47 AM peak hour trips (24 inbound/23 outbound) and 44 PM peak hour trips (24 inbound/20 outbound). Based on the analysis contained within this report, all studied intersections and roadways are anticipated to operate at an acceptable LOS with the addition of the project traffic. The following recommendations are proposed for the project: Airport Center Road/Project Driveway Construct the driveway to allow full access with the following lane configuration: • Northbound Approach — 1 shared through/right-turn lane • Southbound Approach — 1 shared left-turn/through lane • Westbound Approach — 1 shared left-turn/right-turn lane Install a stop sign and limit line for the westbound/driveway approach to Airport Center Road. 18 TABLE 6 OPENING YEAR (2015) WITH PROJECT ROADWAY SEGMENT OPERATIONS Roadway Segment Classification LOS E Capacity Opening Year (2015) Volume V/C LOS Midland Avenue 27th Street to Airport Road Arterial 15,000 8,295 0.55 A Airport Center Road East of Airport Road Collector 5,000 382 0.08 A files\17237\table\17237a.006.xls ? 1 uH4 19 files\17237\table\17237a.007.xls TABLE 7 OPENING YEAR (2015) WITH PROJECT INTERSECTION OPERATIONS INTERSECTION OPENING YEAR (2015) DELAY LOS 27th Street/Grand Avenue (S) AM Peak 7.2 A PM Peak 11.4 B Midland Avenue/27th Street (R) AM Peak 10.9 [3 PM Peak 23.7 C Midland Avenue/Mt. Sopris Drive (U) AM Peak SBL 8.4 A WB L 18.3 C WB R 13.0 B PM Peak SBL 8.0 A WB L 19.4 C WB R 9.9 A Midland Avenue/4 Mile Road (U) AM Peak EB TR 11.3 B WB LT 13.3 [3 NB LR 7.3 A PM Peak EB TR 11.0 B WB LT 11.5 B NB LR 7.3 A Airport Center Road/Project Driveway (U) AM Peak WB L 8.7 A PM Peak WB L 8.7 A Note: Delays and Level of Service calculated utilizing the methodologies described in Chapters 18, 19 and 21 of the 2010 Highway Capacity Manual (HCM). DELAY is measured in seconds LOS = Level of Service NB = northbound, SB=southbound, etc. T=thru movement, L=left-turn movement, etc. (S) = Signalized intersection (U) = Unsignalized intersection (R) - Roundabout 20 7/17/2014 TABLE 8 ROADWAY SEGMENT OPERATIONS SUMMARY INTERSECTION CLASSIFICATION LOS CAPACITY EXISTING OPENING YEAR WITHOUT PROJECT OPENING YEAR WITH PROJECT VOLUME V/C LOS VOLUME V/C LOS VOLUME V/C LOS Midland Avenue 27th Street to Airport Road Arterial 15,000 7,907 0.53 A 8,065 0.54 A 8,295 0.55 A Airport Center Road East of Airport Road Collector 5,000 149 0.03 A 152 0.03 A 382 0.08 A files\17237\table\17237a.008.xls 7/17/2014 21 TABLE 9 INTERSECTION OPERATIONS SUMMARY INTERSECTION 1 EXISTING OPENING YEAR WITHOUT PROJECT OPENING YEAR WITH PROJECT DELAY LOS DELAY LOS DELAY LOS 27th Street/Grand Avenue (S) AM Peak 7.1 A 7.2 A 7.2 A PM Peak 10.9 B 11.2 B 11.4 B Midland Avenue/27th Street (R) AM Peak 10.0 B 10.3 B 10.9 B PM Peak 19.8 C 21.5 C 23.7 C Midland Avenue/Mt. Sopris Drive (U) AM Peak SB L 8.3 A 8.3 A 8.4 A WB L 16.9 C 17.2 C 18.3 C WBR 12.4 B 12.6 B 13.0 B PM Peak SBL 7.9 A 7.9 A 8.0 A WBL 17.9 C 18.3 C 19.4 C WB R 9.7 A 9.7 A 9.9 A Midland Avenue/4 Mile Road (U) AM Peak EB TR 10.5 B 10.5 B 11.3 B WB LT 12.7 B 12.9 B 13.3 B NB LR 7.3 A 7.3 A 7.3 A PM Peak EB TR 10.4 B 10.4 B 11.0 B WB LT 11.3 B 11.3 B 11.5 B NB LR 7.3 A 7.3 A 7.3 A Airport Center Road/Project Driveway (U) AM Peak WB L -- - - 8.7 A PM Peak WB L - - - - 8.7 A Note: Delays and Level of Service calculated utilizing the methodologies described in Chapters 18, 19 and 21 of the 2010 Highway Capacity Manual (HCM). DELAY is measured in seconds LOS = Level of Service NB = northbound, SB=southbound, etc. T=thru movement, L=left turn movement, etc. (S) = Signalized intersection (U) = Unsignalized intersection (R) - Roundabout files\ 17237\table\ 17237a.009.xls 22 7/17/2014 Exhibit 9 shows a graphical representation of the proposed project area transportation recommendations for opening year (2015). 23 Rick Engineering Company O CVO NOT TO SCALE RICK ENGINEERING COMPANY EXHIBIT 9 _EEEND PROJECT ACCESS RECOMMENDATIONS FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY TRAFFIC IMPACT ANALYSIS U = EXISTING TRAFFIC SIGNAL } = EXISTING LANE v = EXISTING STOP/YIELD CONTROL T = PROPOSED STOP SIGN K ! = ROUNDABOUT 24 C 4) a 0 L C 0 O" O ▪ O 7 C U! 0 -p I v, W a C O O L U t / 0. O- L a o o o oin r o n o N I 7 4g •- a •- 0 L p X w � 0 p o O • a I / O 0 + a - p E D 0 01 O 01 3 T l0 O C O 0N O I - C + N / 0 N W � L 010 0 0 0 0 7 00 0 0 0 0 •-+N + in Lc 0 -m / oI" L M + » 7 H / REFERENCES 1. City of Glenwood Springs, Comprehensive Plan, March 2011. 2. City of Glenwood Springs, Long Range Transportation Plan 2003-2030, July 17, 2003. 3. City of Glenwood Springs, Street Standards, July 7, 2005. 4. Garfield County, Comprehensive Plan 2030, October 9, 2013. 5. Institute of Transportation Engineers, Trip Generation, 9th Edition, Washington, D.C., 2012. 6. Felsburg Holt & Ullevig, Glenwood Ridge Traffic Impact Study, Glenwood Springs, Colorado, March 25, 2014. 7. Trafficware, SYNCHRO, Version 8, Build 805, Sugar Land, Texas, 2013. 8. Transportation Research Board, Highway Capacity Manual, Washington, D.C., 2010. 25 APPENDIX A Traffic Volume Counts All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name Site Code Start Date Page No Groups Printed- Class 1 MIDLAND AVE Southbound 27TH ST MIDLAND AVE Westbound Northbound : #1 MIDLAND&27THAM :00000000 : 6/10/2014 :1 27TH ST Eastbound Start Time Right Thru Left Other Right Thru Left Other Right Thru Left Other Right Thru Left Other Int. Total 07:00 AM 07:15 AM 07:30 AM 07:45 AM Total 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total Grand Total Apprch % Total °A, 0 8 54 0 11 0 9 1 66 4 0 0 0 0 0 0 153 0 9 47 0 14 0 12 0 84 24 0 0 0 0 0 0 190 0 9 77 0 20 0 22 0 86 27 0 0 0 0 0 0 241 0 10 74 0 19 0 23 1 103 28 0 0 0 0 0 0 258 0 36 252 0 64 0 66 2 339 83 0 0 0 0 0 0 842 0 10 66 0 22 0 25 0 86 19 0 0 0 0 0 0 228 0 17 35 0 18 0 18 0 69 23 0 0 0 0 0 0 180 0 10 50 0 20 0 29 0 81 20 0 0 0 0 0 0 210 0 12 40 0 30 0 40 0 94 21 0 0 0 0 0 0 237 0 49 191 0 90 0 112 0 330 83 0 0 0 0 0 0 855 0 85 443 0 16.1 83.9 0 5 26.1 0 154 0 178 2 669 166 0 0 0 0 0 0 1697 0 46.1 0 53.3 0.6 80.1 19.9 0 0 0 0 0 0 0 9.1 0 10.5 0.1 39.4 9.8 0 0 0 0 0 0 0 F c r r- 0 0 O O O 0 O 0 0 MIDLAND AVE Out In Total 1 5281 01 851 4431 01 Right Thu LeLf+t Other I 3201 8481 North 6/10/2014 07:00 AM 6/10/2014 08:45 AM Class 1 4-1 T Left Thru Right Other 01 1661 6691 0I 1 8351 Out In Total mini ANn AVF 2631 I 10981 gym' s 1 N O CD A 0 N O All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltraffiedata.net File Name Site Code Start Date Page No : #1 MIDLAND&27THAM :00000000 : 6/10/2014 :2 Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM Int. Total 07:15 AM MIDLAND AVE Southbound 27TH ST Westbound MIDLAND AVE Northbound 27TH ST Eastbound Start Time Right Thru Left Other App. Total Right Thru Left Other App. Total Right Thru Left Other App. Total Right Thru I Left Other App. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM Int. Total 07:15 AM 0 9 47 0 56 14 0 12 0 26 84 24 0 0 108 0 0 0 0 0 190 07:30 AM 0 9 77 0 86 20 0 22 0 42 86 27 0 0 113 0 0 0 0 0 241 07:45 AM 0 10 74 0 84 19 0 23 1 43 103 28 0 0 131 0 0 0 0 0 258 08:00 AM 0 10 66 0 76 22 0 25 0 47 86 19 0 0 105 0 0 0 0 0 228 Total Volume 0 38 264 0 302 75 0 82 1 158 359 98 0 0 457 0 0 0 0 0 917 App. Total 0 12.6 87.4 0 47.5 0 51.9 0.6 78.6 21.4 0 0 0 0 0 0 PHF .000 .950 .857 .000 .878 .852 .000 .820 .250 .840 .871 .875 .000 .000 .872 .000 .000 .000 .000 .000 .889 0 1- O O O O O O O MIDLAND AVE Out In Total 1 i 3021 01 381 2641 01 Right Thru Left Other 1731 4751 Peak Hour Data North Peak Hour Begins at 07:15 Afll Class 1 r Left Thru Right Other I 01 981 3591 01 1 1 4571 Out In Total Mini ANI') AVF 1201 5771 O N W 0) W O All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltraffiedata.net File Name Site Code Start Date Page No Groups Printed- Class 1 MIDLAND AVE Southbound 27TH ST MIDLAND AVE Westbound Northbound : #1 MIDLAND&27THPM :00000000 : 6/10/2014 :1 27TH ST Eastbound Start Time 04:00 PM 04:15 PM 04:30 PM 04:45 PM Right 0 0 0 0 Thru 22 14 17 18 Left Other Right 55 0 55 33 0 50 37 0 87 53 0 89 Total 0 71 05:00 PM 0 05:15 PM 0 05:30 PM 0 05:45 PM 0 178 0 281 24 62 1 89 23 40 0 118 20 40 0 84 18 35 1 97 Total 0 Grand Total Apprch % Total °A, 85 177 2 388 0 156 355 0 30.4 69.2 0 6.4 14.5 2 669 0.4 47.4 0.1 27.3 Thru 0 0 0 0 0 0 0 0 0 0 Left 61 75 84 79 299 100 128 104 103 435 0 734 0 52 0 30 Other 1 1 1 0 Right Thru Left Other 57 12 0 0 43 11 0 0 51 19 0 0 45 18 0 0 Right Thru 0 0 0 0 0 0 0 0 Left 0 0 0 0 Other 0 0 0 0 196 60 0 4 38 15 0 4 1 48 18 0 0 0 58 23 0 0 0 46 18 0 0 5 190 74 0 4 8 386 134 0 4 0.6 73.7 25.6 0 0.8 0.3 15.8 5.5 0 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 F c ✓ N 0 O O O 0 O 0 0 MIDLAND AVE Out In Total 1 5131 1 01 1561 3551 21 Right Thu LeLf+t Other 8031 13161 North 6/10/2014 04:00 PM 6/10/2014 05:45 PM Class 1 Left Thru Right Other 1 01 1341 3861 41 1 1 5241 Out In Total mini ANn AVF 8901 14141 gym' 1 m 0 (D m co 0 C., Isa 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Int. Total 263 227 296 302 1088 337 376 329 318 1360 2448 All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name Site Code Start Date Page No : #1 MIDLAND&27THPM :00000000 : 6/10/2014 :2 Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM Int. Total 05:00 PM MIDLAND AVE Southbound 27TH ST Westbound MIDLAND AVE Northbound 27TH ST Eastbound Start Time Right Thru Left Other App. Total Right Thru Left Other App. Total Right Thru Left Other App. Total Right Thru I Left Other App. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM Int. Total 05:00 PM 0 24 62 1 87 89 0 100 4 193 38 15 0 4 57 0 0 0 0 0 337 05:15 PM 0 23 40 0 63 118 0 128 1 247 48 18 0 0 66 0 0 0 0 0 376 05:30 PM 0 20 40 0 60 84 0 104 0 188 58 23 0 0 81 0 0 0 0 0 329 05:45 PM 0 18 35 1 54 97 0 103 0 200 46 18 0 0 64 0 0 0 0 0 318 Total Volume 0 85 177 2 264 388 0 435 5 828 190 74 0 4 268 0 0 0 0 0 1360 App. Total 0 32.2 67 0.8 46.9 0 52.5 0.6 70.9 27.6 0 1.5 0 0 0 0 PHF .000 .885 .714 .500 .759 .822 .000 .850 .313 .838 .819 .804 .000 .250 .827 .000 .000 .000 .000 .000 .904 0 1- 1- to 1— r-- 0 — NO 0 0 0 0 0 0 0 MIDLAND AVE Out In Total 1 2641 01 851 1771 21 Right Thru Left Other 4621 7261 Peak Hour Data North Peak Hour Begins at 05:00 PIlI Class 1 r Left Thru Right Other 01 741 1901 41 1 1 2681 Out In Total Mini ANI') AVF 5201 7881 2 r O 03 0 01 J iCO" co rT O C --I =x to 0 iv All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name Site Code Start Date Page No Groups Printed- Class 1 GRAND AVE Southbound 27TH ST Westbound GRAND AVE Northbound : #2 GRAND&27THAM :00000000 : 6/10/2014 :1 27TH ST Eastbound Start Time Right Thru Left Other Right Thru Left Other Right Thru Left Other Right Thru Left Other Int. Total 07:00 AM 07:15 AM 07:30 AM 07:45 AM 7 7 8 7 18 11 12 15 Total 08:00 AM 08:15 AM 08:30 AM 08:45 AM 9 3 4 1 3 0 7 2 1 11 0 2 16 4 2 21 4 3 29 9 45 40 23 6 Total Grand Total Apprch % Total °A, 20 11 20 25 76 13 6 9 11 39 6 5 8 3 22 0 2 0 2 121 79 45 8 47.8 31.2 17.8 3.2 6.8 4.4 2.5 0.4 8 77 17 6 6 8 2 22 20 19 34 38 111 5 9 4 6 24 30 188 41 11.5 72 15.7 1.7 10.5 2.3 0 0 0 0 0 0 2 0.8 0.1 6 11 5 7 29 14 6 10 8 38 5 4 5 9 23 8 6 6 6 26 3 4 5 3 15 9 3 7 4 23 67 49 38 43.5 31.8 24.7 3.7 2.7 2.1 0 0 0 0 0 0 0 0 0 0 0 0 0 8 90 10 91 14 118 21 107 25 0 26 2 29 0 46 0 53 406 17 5 11 8 41 107 77 80 85 349 126 2 33 29 35 48 145 94 755 271 8.4 67.3 24.2 5.3 42.2 15.1 0 rn co N V rn GRAND AVE Out In Total 1 2531 I 1211 791 451 81 Right Thu Left Other 3501 6031 North 6/10/2014 07:00 AM 6/10/2014 08:45 AM Class 1 417 Left 1 381 T Thru Right Other 49I 671 0I 1 1 1541 In Total r;RANn AVF 2141 Out 3681 1 m 0 N 0 CO N CO V rn N CO 0 C 1 0 0 0 0 0 0 2 0.2 0.1 175 190 236 270 871 258 182 234 245 919 1790 All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name Site Code Start Date Page No : #2 GRAND&27THAM :00000000 : 6/10/2014 :2 Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM Int. Total 07:15 AM GRAND AVE Southbound 27TH ST Westbound GRAND AVE Northbound 27TH ST Eastbound Start Time Right Thru Left Other App. Total Right Thru i Left Other App. Total Right Thru Left Other App. Total Right Thru I Left Other App. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM Int. Total 07:15 AM 8 7 4 1 20 2 16 4 0 22 11 4 4 0 19 10 91 26 2 129 190 07:30 AM 18 11 3 0 32 2 21 4 1 28 5 5 5 0 15 14 118 29 0 161 236 07:45 AM 12 15 7 2 36 3 29 9 0 41 7 9 3 0 19 21 107 46 0 174 270 08:00 AM 20 13 6 0 39 6 20 5 0 31 14 8 9 0 31 17 107 33 0 157 258 Total Volume 58 46 20 3 127 13 86 22 1 122 37 26 21 0 84 62 423 134 2 621 954 App. Total 45.7 36.2 15.7 2.4 10.7 70.5 18 0.8 44 31 25 0 10 68.1 21.6 0.3 PHF .725 .767 .714 .375 .814 .542 .741 .611 .250 .744 .661 .722 .583 .000 .677 .738 .896 .728 .250 .892 .883 0 1- co op co CD N GRAND AVE Out In Total 1 1271 581 461 201 31 Right Thru Left Other 1731 3001 Peak Hour Data North Peak Hour Begins at 07:15 Afll Class 1 47 1 Left Thru Right Other 1 1211 261 371 101 1 1 841 In Total PRANr)AVF 1301 Out 2141 2 N O W rn 0) 0 N 0 N O _-1 = co O El All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name Site Code Start Date Page No Groups Printed- Class 1 GRAND AVE Southbound 27TH ST Westbound GRAND AVE Northbound : #2 GRAND&27THPM :00000000 : 6/10/2014 :1 27TH ST Eastbound Start Time Right Thru Left Other Right Thru Left Other Right Thru Left Other Right Thru Left Other Int. Total 04:00 PM 04:15 PM 04:30 PM 04:45 PM Total 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total Grand Total Apprch % Total % 56 8 54 5 58 10 58 12 226 35 75 90 58 72 295 4 0 3 0 3 2 10 1 20 3 7 5 2 12 6 2 10 3 0 10 3 0 39 17 4 521 74 81.5 11.6 19.9 2.8 37 5.8 1.4 7 1.1 0.3 7 4 7 6 24 11 7 13 15 46 70 7.6 2.7 61 72 90 91 314 12 8 12 12 44 0 0 0 0 0 96 7 0 137 6 2 127 4 1 110 3 0 470 20 3 784 85.1 29.9 64 6.9 2.4 3 0.3 0.1 13 12 8 12 45 9 11 5 8 33 11 7 13 16 47 18 15 10 9 52 3 11 27 15 56 20 19 14 16 69 78 99 125 25.8 32.8 41.4 3 3.8 4.8 0 0 0 0 0 0 0 0 0 0 0 0 0 6 6 8 8 28 3 10 9 6 28 56 7.4 2.1 86 53 58 63 260 81 57 64 47 249 509 67 19.4 23 23 21 27 94 24 24 27 26 101 195 25.7 7.4 0 M D) m 0 CL 0 GRAND AVE Out In Total 1 6391 1 5211 741 371 71 Right Thu Left Other 1 3641 10031 North 6/10/2014 04:00 PM 6/10/2014 05:45 PM Class 1 4-1 1 Left Thru Right Other 1 1251 991 781 01 1 1 3021 In Total r;RANn AVF 1 1941 Out 4961 gym' 1 m O st CD 0 A A W A A N 0 c., 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 290 258 317 331 1196 358 398 345 325 1426 2622 All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name Site Code Start Date Page No : #2 GRAND&27THPM :00000000 : 6/10/2014 :2 Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM Int. Total 04:45 PM GRAND AVE Southbound 27TH ST Westbound GRAND AVE Northbound 27TH ST Eastbound Start Time Right Thru Left Other App. Total Right Thru I Left Other App. Total Right Thru Left Other App. Total Right Thru I Left Other App. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM Int. Total 04:45 PM 58 12 10 1 81 6 91 12 0 109 12 16 15 0 43 8 63 27 0 98 331 05:00 PM 75 7 5 2 89 11 96 7 0 114 9 18 20 0 47 3 81 24 0 108 358 05:15 PM 90 12 6 2 110 7 137 6 2 152 11 15 19 0 45 10 57 24 0 91 398 05:30 PM 58 10 3 0 71 13 127 4 1 145 5 10 14 0 29 9 64 27 0 100 345 Total Volume 281 41 24 5 351 37 451 29 3 520 37 59 68 0 164 30 265 102 0 397 1432 App. Total 80.1 11.7 6.8 1.4 7.1 86.7 5.6 0.6 22.6 36 41.5 0 7.6 66.8 25.7 0 PHF .781 .854 .600 .625 .798 .712 .823 .604 .375 .855 .771 .819 .850 .000 .872 .750 .818 .944 .000 .919 .899 O F F rn C 1— r-- 0 — NO o co M 2 H� LF -7, O GRAND AVE Out In Total 1 3511 2811 411 241 51 Right Thru Left Other 1981 5491 Peak Hour Data North Peak Hour Begins at 04:45 PIlI Class 1 47 1 r Left Thru Right Other 1681 591 371 I OI 1 1 1641 In Total GRAM -I AVE 1001 Out 2641 2 N O V 01 m W 0)) 0 A O O — —I = 2 rn 0 El All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name Site Code Start Date Page No Groups Printed- Class 1 : #3 MIDLAND&MTSOPRISAM :00000000 : 6/10/2014 :1 MIDLAND AVE Southbound MT SOPRIS DR Westbound MIDLAND AVE Northbound MT SOPRIS DR Eastbound Start Time Right Thru Left Other Right Thru Left Other Right Thru Left Other Right Thru Left Other Int. Total 07:00 AM 07:15 AM 07:30 AM 07:45 AM Total 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total Grand Total Apprch % Total % 0 0 0 0 11 13 19 15 5 5 8 11 0 0 0 0 0 58 29 0 0 0 0 0 23 17 25 31 96 11 7 12 21 51 0 154 80 0 65.8 34.2 0 16.3 8.5 0 0 0 0 0 0 0 0 19 0 30 0 28 0 44 0 121 0 34 17 35 40 126 247 97.2 26.2 0 0 0 0 0 0 1 1 0 1 0 2 0 0 1 0 0 1 1 0 0 0 0 4 1 0 0 0 5 2 0.5 2 0.8 0.2 3 3 1 2 3 9 47 46 77 51 221 49 60 52 48 209 12 430 2.7 96.2 1.3 45.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3 0 1 1 0 0 0 0 2 0 2 0 1 3 5 1.1 0.5 0 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 etF 0 0 0) E a 0 cn m 0 O MIDLAND AVE Out In Total 1 2341 1 01 1541 801 01 Right Thu LeLf+t Other 6851 9191 North 6/10/2014 07:00 AM 6/10/2014 08:45 AM Class 1 4-1 T Left Thru Right Other 1 01 4301 121 51 1 1 4471 Out In Total MIDLAND AVE 1591 6061 1 0 O 0 V N A 1 1 0 1 3 8 100 0.8 0 0 0 0 0 0 0 0 86 97 133 125 441 123 106 128 145 502 943 All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name : #3 MIDLAND&MTSOPRISAM Site Code : 00000000 Start Date : 6/10/2014 Page No : 2 Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM Int. Total 08:00 AM MIDLAND AVE Southbound MT SOPRIS DR Westbound MIDLAND AVE Northbound MT SOPRIS DR Eastbound Start Time Right Thru Left Other App. Total Right Thru Left Other App. Total Right Thru Left Other App. Total Right Thru I Left Other App. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM Int. Total 08:00 AM 0 23 11 0 34 34 0 2 0 36 3 49 0 0 52 0 0 1 0 1 123 08:15 AM 0 17 7 0 24 17 0 1 0 18 1 60 0 2 63 0 0 1 0 1 106 08:30 AM 0 25 12 0 37 35 0 1 1 37 2 52 0 0 54 0 0 0 0 0 128 08:45 AM 0 31 21 0 52 40 0 0 0 40 3 48 0 1 52 0 0 1 0 1 145 Total Volume 0 96 51 0 147 126 0 4 1 131 9 209 0 3 221 0 0 3 0 3 502 App. Total 0 65.3 34.7 0 96.2 0 3.1 0.8 4.1 94.6 0 1.4 0 0 100 0 PHF .000 .774 .607 .000 .707 .788 .000 .500 .250 .819 .750 .871 .000 .375 .877 .000 .000 .750 .000 .750 .866 M 0 0 O MIDLAND AVE Out In Total 1 1471 1 01 961 511 01 Right Thru Left Other 3381 4851 Peak Hour Data North Peak Hour Begins at 08:00 Afll Class 1 r Left Thru Right Other 1 01 2091 91 31 1 1 2211 Out In Total Mini ANI') AVF 1001 3211 2 m O 0)) O O O All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name Site Code Start Date Page No Groups Printed- Class 1 : #3 MIDLAND&MTSOPRISPM :00000000 : 6/10/2014 :1 MIDLAND AVE Southbound MT SOPRIS DR Westbound MIDLAND AVE Northbound MT SOPRIS DR Eastbound Start Time Right Thru Left Other Right Thru Left Other Right Thru Left Other Right Thru Left Other Int. Total 04:00 PM 04:15 PM 04:30 PM 04:45 PM Total 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total Grand Total Apprch % Total % 0 0 0 0 42 36 47 40 23 27 31 28 0 0 0 0 0 165 109 0 0 0 50 68 59 57 234 45 54 45 35 179 1 399 288 0.1 58 41.9 0.1 35.2 25.4 0 0 0 0 0 0 0 0 20 0 11 0 14 0 16 0 61 0 0 0 1 0 3 0 0 0 4 0 17 0 1 0 29 0 2 0 30 0 2 0 19 0 1 0 95 0 6 0 156 94 13.7 0 0 0 10 6 0.9 0 0 0 3 2 1 0 6 2 1 3 1 7 36 36 38 20 130 24 36 33 28 121 13 251 4.7 90.6 1.1 22.1 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 1 1 4 0 0 0 2 2 3 2 9 13 4.7 1.1 0 0 0 0 0 25 0.1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 2 0 0 0 0 0 F et 0 0 Q c 0 0 O 2 O 0 0 iu 0 MIDLAND AVE Out In Total 1 6881 1 11 3991 2881 01 Right Thu LeLf+t Other 4101 10981 North 6/10/2014 04:00 PM 6/10/2014 05:45 PM Class 1 Left Thru Right Other 1 01 2511 131 131 1 1 2771 Out In Total mini ANn AVF 4101 6871 s 1 m O CD rn 0 CO rn A V 3 75 0.3 0 0 0 127 113 135 106 481 142 194 175 143 654 1135 All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name : #3 MIDLAND&MTSOPRISPM Site Code : 00000000 Start Date : 6/10/2014 Page No : 2 Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM Int. Total 05:00 PM MIDLAND AVE Southbound MT SOPRIS DR Westbound MIDLAND AVE Northbound MT SOPRIS DR Eastbound Start Time Right Thru Left Other App. Total Right Thru Left Other App. Total Right Thru Left Other App. Total Right Thru I Left Other App. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM Int. Total 05:00 PM 1 50 45 0 96 17 0 1 0 18 2 24 0 2 28 0 0 0 0 0 142 05:15 PM 0 68 54 0 122 29 0 2 0 31 1 36 0 2 39 0 0 2 0 2 194 05:30 PM 0 59 45 0 104 30 0 2 0 32 3 33 0 3 39 0 0 0 0 0 175 05:45 PM 0 57 35 0 92 19 0 1 0 20 1 28 0 2 31 0 0 0 0 0 143 Total Volume 1 234 179 0 414 95 0 6 0 101 7 121 0 9 137 0 0 2 0 2 654 App. Total 0.2 56.5 43.2 0 94.1 0 5.9 0 5.1 88.3 0 6.6 0 0 100 0 PHF .250 .860 .829 .000 .848 .792 .000 .750 .000 .789 .583 .840 .000 .750 .878 .000 .000 .250 .000 .250 .843 O F Ci COCi C 0 0 to 2 0 M N N 0 0 0 NJ MIDLAND AVE Out In Total 1 4141 1 1 11 2341 1791 01 Right Thru Left Other 2181 6321 Peak Hour Data North 2 Peak Hour Begins at 05:00 P Class 1 ,x O c 4-1 T r' Left Thru Right Other 01 1211 71 91 1 1 1371 Out In Total Mini ANI') AVF 2401 3771 CO O rn O 0 0) V 0 in 0 F 33 (n 0 0 iv MIDLAND AVE / AIRPORT RD Southbound All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltraffiedata.net File Name : #4 MIDLAND&4MILEAM Site Code : 00000000 Start Date : 6/10/2014 Page No : 1 Groups Printed- Class 1 4 MILE Westbound MIDLAND AVE / AIRPORT RD Northbound 4 MILE Eastbound Start Time Right Thru Left Other Right Thru Left Other Right Thru Left Other Right Thru Left Other Int. Total 07:00 AM 07:15 AM 07:30 AM 07:45 AM 6 5 0 0 6 8 0 0 11 6 0 0 9 6 0 0 Total 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total Grand Total Apprch % Total % 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15 0 0 0 18 0 0 0 27 0 0 0 21 0 0 32 25 0 0 16 10 0 0 10 8 0 0 13 13 0 0 19 13 0 0 58 44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 90 69 0 0 0 0 0 0 56.6 43.4 0 0 0 0 0 0 14.9 11.4 0 0 0 0 0 0 0 0 31 0 0 0 31 0 0 0 46 0 2 0 32 0 0 81 0 0 0 23 0 0 0 19 1 0 0 18 1 0 0 18 1 0 2 0 140 0 1 0 26 0 0 0 42 0 1 0 37 0 1 0 32 0 0 78 3 0 0 159 3 0 0 98.1 1.9 0 0 26.4 0.5 0 3 0 137 0 5 0 277 0 1.8 0 98.2 0 0.8 0 45.9 0 2 in (6 r O � HI Cf) N 0 LO 0 MIDLAND AVE / AIRPORT RD Out In Total 1 1 591 1 901 691 01 01 Right Thu LeLf4t Other 4361 5951 North 6/10/2014 07:00 AM 6/10/2014 08:45 AM Class 1 47 T Left Thru Right Other 31 1591 01 OI 1 1 1621 Out In Total MIDI ANT) AVF / AIRPORT Rn 741 2361 O O 0 O = 3 1 m m 9. 57 63 90 70 280 76 80 83 84 323 603 All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name Site Code Start Date Page No : #4 MIDLAND&4MILEAM :00000000 : 6/10/2014 :2 Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM Int. Total 08:00 AM MIDLAND AVE / AIRPORT RD Southbound 4 MILE Westbound MIDLAND AVE / AIRPORT RD Northbound 4 MILE Eastbound Start Time Right Thru Left Other App. Total Right Thru Left Other App. Total Right Thru Left Other App. Total Right Thru Left Other App. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM Int. Total 08:00 AM 16 10 0 0 26 0 0 0 0 0 0 23 0 0 23 1 0 26 0 27 76 08:15 AM 10 8 0 0 18 0 0 0 0 0 0 19 1 0 20 0 0 42 0 42 80 08:30 AM 13 13 0 0 26 0 0 0 0 0 0 18 1 0 19 1 0 37 0 38 83 08:45 AM 19 13 0 0 32 0 0 0 0 0 0 18 1 0 19 1 0 32 0 33 84 Total Volume 58 44 0 0 102 0 0 0 0 0 0 78 3 0 81 3 0 137 0 140 323 App. Total 56.9 43.1 0 0 0 0 0 0 0 96.3 3.7 0 2.1 0 97.9 0 PHF .763 .846 .000 .000 .797 .000 .000 .000 .000 .000 .000 .848 .750 .000 .880 .750 .000 .815 .000 .833 .961 0 1- J C 0 0 co 0 MIDLAND AVE / AIRPORT RD Out In Total 1 1021 2151 3171 1 1 581 441 01 01 Right Thru Left Other Peak Hour Data North Peak Hour Begins at 08:00 A Class 1 r Left Thru Right Other 1 31 781 01 01 1 1 811 Out In Total mini AM) AVF / AIRPORT Rfl 471 1281 c r 0 N 0 O 0 O 0 0 7 m 0 All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name Site Code Start Date Page No Groups Printed- Class 1 : #4 MIDLAND&4MILEPM :00000000 : 6/10/2014 :1 0 _1E O co m MIDLAND AVE / AIRPORT RD Out In Total 3981 2681 1301 01 01 Right Thru Left Other 263 6611 North 6/10/2014 04:00 PM 6/10/2014 05:45 PM Class 1 47 T r Left ThrguBl Right Other 01 01 1 1061 Out In Total MInI ANfl AVF / AIRPfRT nn 1331 2391 C m 0 (D 0 O 0 O 0 0 O O S 0 N r m MIDLAND AVE / AIRPORT RD Southbound 4 MILE Westbound MIDLAND AVE / AIRPORT RD Northbound 4 MILE Eastbound Start Time Int. Total 04:00 PM 21 21 0 0 0 0 0 0 0 16 2 0 1 0 22 0 83 04:15 PM 28 8 0 0 0 0 0 0 0 14 0 0 0 0 25 0 75 04:30 PM 32 18 0 0 0 0 0 0 0 21 1 0 0 0 19 0 91 04:45 PM 25 16 0 0 0 0 0 0 0 7 0 0 1 0 13 0 62 Total 106 63 0 0 0 0 0 0 0 58 3 0 2 0 79 0 311 05:00 PM 30 18 0 0 0 0 0 0 0 11 1 0 0 0 15 1 76 05:15 PM 52 15 0 0 0 0 0 0 0 10 2 0 0 0 23 0 102 05:30 PM 44 19 0 0 0 0 0 0 0 11 1 0 0 0 28 0 103 05:45 PM 36 15 0 0 0 0 0 0 0 8 1 0 1 0 20 0 81 Total 162 67 0 0 0 0 0 0 0 40 5 0 1 0 86 1 362 Grand Total 268 130 0 0 0 0 0 0 0 98 8 0 3 0 165 1 673 Apprch % 67.3 32.7 0 0 0 0 0 0 0 92.5 7.5 0 1.8 0 97.6 0.6 Total % 39.8 19.3 0 0 0 0 0 0 0 14.6 1.2 0 0.4 0 24.5 0.1 0 _1E O co m MIDLAND AVE / AIRPORT RD Out In Total 3981 2681 1301 01 01 Right Thru Left Other 263 6611 North 6/10/2014 04:00 PM 6/10/2014 05:45 PM Class 1 47 T r Left ThrguBl Right Other 01 01 1 1061 Out In Total MInI ANfl AVF / AIRPfRT nn 1331 2391 C m 0 (D 0 O 0 O 0 0 O O S 0 N r m All Traffic Data Services,Inc. 9660 W 44th Ave Wheat Ridge,CO 80033 www.alltrafficdata.net File Name Site Code Start Date Page No : #4 MIDLAND&4MILEPM :00000000 : 6/10/2014 :2 Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM Int. Total 05:00 PM MIDLAND AVE / AIRPORT RD Southbound q MILE Westbound MIDLAND AVE / AIRPORT RD Northbound q MILE Eastbound Start Time Right Thru Left Other App. Total Right Thru Left Other App. Total Right Thru Left Other App. Total Right Thru Left Other App. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM Int. Total 05:00 PM 30 18 0 0 48 0 0 0 0 0 0 11 1 0 12 0 0 15 1 16 76 05:15 PM 52 15 0 0 67 0 0 0 0 0 0 10 2 0 12 0 0 23 0 23 102 05:30 PM 44 19 0 0 63 0 0 0 0 0 0 11 1 0 12 0 0 28 0 28 103 05:45 PM 36 15 0 0 51 0 0 0 0 0 0 8 1 0 9 1 0 20 0 21 81 Total Volume 162 67 0 0 229 0 0 0 0 0 0 40 5 0 45 1 0 86 1 88 362 App. Total 70.7 29.3 0 0 0 0 0 0 0 88.9 11.1 0 1.1 0 97.7 1.1 P H F .779 .882 .000 .000 .854 .000 .000 .000 .000 .000 .000 .909 .625 .000 .938 .250 .000 .768 .250 .786 .879 0 H _J C O N co W r— m CO 00 O f— L Er; 0) L_ 0 MIDLAND AVE / AIRPORT RD Out In Total I 2291 355 1621 671 01 01 Right Thru Left Other 12d Peak Hour Data T North Peak Hour Begins at 05:00 P Class 1 Left Thru Right Other r 51 401 Ol 01 1 451 1 Out In Total Mlnl ANr1 AVF / AIRPfRT Rn 681 113 4 C r 0 W 0 O O O 0 T 7 m 0 iv Volume Start Date: 6/10/2014 Start Time: 12:00:00 AM Site Code: 5 Location 1: MIDLAND AVE S/O 27TH ST Date Time 6/10/2014 12:00 AM 6/10/2014 12:15 AM 6/10/2014 12:30 AM 6/10/2014 12:45 AM 6/10/2014 01:00 AM 6/10/2014 01:15 AM 6/10/2014 01:30 AM 6/10/2014 01:45 AM 6/10/2014 02:00 AM 6/10/2014 02:15 AM 6/10/2014 02:30 AM 6/10/2014 02:45 AM 6/10/2014 03:00 AM 6/10/2014 03:15 AM 6/10/2014 03:30 AM 6/10/2014 03:45 AM 6/10/2014 04:00 AM 6/10/2014 04:15 AM 6/10/2014 04:30 AM 6/10/2014 04:45 AM 6/10/2014 05:00 AM 6/10/2014 05:15 AM 6/10/2014 05:30 AM 6/10/2014 05:45 AM 6/10/2014 06:00 AM 6/10/2014 06:15 AM 6/10/2014 06:30 AM 6/10/2014 06:45 AM 6/10/2014 07:00 AM 6/10/2014 07:15 AM 6/10/2014 07:30 AM 6/10/2014 07:45 AM 6/10/2014 08:00 AM 6/10/2014 08:15 AM 6/10/2014 08:30 AM 6/10/2014 08:45 AM 6/10/2014 09:00 AM 6/10/2014 09:15 AM 6/10/2014 09:30 AM 6/10/2014 09:45 AM 6/10/2014 10:00 AM 6/10/2014 10:15 AM 6/10/2014 10:30 AM 6/10/2014 10:45 AM 6/10/2014 11:00 AM 6/10/2014 11:15 AM 6/10/2014 11:30 AM 6/10/2014 11:45 AM 6/10/2014 12:00 PM NB SB 2 0 0 0 0 1 1 1 0 1 1 1 0 0 5 2 1 1 1 11 5 10 30 39 54 60 77 96 79 90 118 129 90 95 97 112 88 59 77 74 48 48 43 51 57 59 50 54 64 6/10/2014 12:15 PM 51 62 6/10/2014 12:30 PM 56 61 6/10/2014 12:45 PM 75 66 6/10/2014 01:00 PM 53 65 6/10/2014 01:15 PM 44 54 6/10/2014 01:30 PM 50 56 6/10/2014 01:45 PM 61 54 6/10/2014 02:00 PM 61 38 6/10/2014 02:15 PM 43 60 6/10/2014 02:30 PM 56 63 6/10/2014 02:45 PM 54 57 6/10/2014 03:00 PM 42 63 6/10/2014 03:15 PM 59 72 6/10/2014 03:30 PM 56 68 6/10/2014 03:45 PM 71 70 6/10/2014 04:00 PM 65 80 6/10/2014 04:15 PM 48 84 6/10/2014 04:30 PM 70 98 6/10/2014 04:45 PM 57 91 6/10/2014 05:00 PM 57 125 6/10/2014 05:15 PM 70 143 6/10/2014 05:30 PM 78 116 6/10/2014 05:45 PM 60 118 6/10/2014 06:00 PM 58 128 6/10/2014 06:15 PM 44 106 6/10/2014 06:30 PM 43 92 6/10/2014 06:45 PM 42 85 6/10/2014 07:00 PM 38 79 6/10/2014 07:15 PM 44 65 6/10/2014 07:30 PM 38 69 6/10/2014 07:45 PM 34 69 6/10/2014 08:00 PM 38 66 6/10/2014 08:15 PM 25 56 6/10/2014 08:30 PM 39 61 6/10/2014 08:45 PM 32 64 6/10/2014 09:00 PM 25 31 6/10/2014 09:15 PM 24 45 6/10/2014 09:30 PM 22 33 6/10/2014 09:45 PM 15 36 6/10/2014 10:00 PM 13 40 6/10/2014 10:15 PM 12 35 6/10/2014 10:30 PM 11 16 6/10/2014 10:45 PM 7 17 6/10/2014 11:00 PM 2 18 6/10/2014 11:15 PM 3 11 6/10/2014 11:30 PM 7 6 6/10/2014 11:45 PM 2 9 3937 3970 7907 Volume Start Date: 6/10/2014 Start Time: 12:00:00 AM Site Code: 6 Location 1: AIRPORT CENTER RD E/O AIRPORT RD Date Time 6/10/2014 12:00 AM 6/10/2014 12:15 AM 6/10/2014 12:30 AM 6/10/2014 12:45 AM 6/10/2014 01:00 AM 6/10/2014 01:15 AM 6/10/2014 01:30 AM 6/10/2014 01:45 AM 6/10/2014 02:00 AM 6/10/2014 02:15 AM 6/10/2014 02:30 AM 6/10/2014 02:45 AM 6/10/2014 03:00 AM 6/10/2014 03:15 AM 6/10/2014 03:30 AM 6/10/2014 03:45 AM 6/10/2014 04:00 AM 6/10/2014 04:15 AM 6/10/2014 04:30 AM 6/10/2014 04:45 AM 6/10/2014 05:00 AM 6/10/2014 05:15 AM 6/10/2014 05:30 AM 6/10/2014 05:45 AM 6/10/2014 06:00 AM 6/10/2014 06:15 AM 6/10/2014 06:30 AM 6/10/2014 06:45 AM 6/10/2014 07:00 AM 6/10/2014 07:15 AM 6/10/2014 07:30 AM 6/10/2014 07:45 AM 6/10/2014 08:00 AM 6/10/2014 08:15 AM 6/10/2014 08:30 AM 6/10/2014 08:45 AM 6/10/2014 09:00 AM 6/10/2014 09:15 AM 6/10/2014 09:30 AM 6/10/2014 09:45 AM 6/10/2014 10:00 AM 6/10/2014 10:15 AM 6/10/2014 10:30 AM 6/10/2014 10:45 AM 6/10/2014 11:00 AM 6/10/2014 11:15 AM 6/10/2014 11:30 AM 6/10/2014 11:45 AM 6/10/2014 12:00 PM EB WB 6/10/2014 12:15 PM 1 4 6/10/2014 12:30 PM 2 1 6/10/2014 12:45 PM 3 0 6/10/2014 01:00 PM 2 0 6/10/2014 01:15 PM 2 2 6/10/2014 01:30 PM 0 1 6/10/2014 01:45 PM 0 2 6/10/2014 02:00 PM 0 0 6/10/2014 02:15 PM 2 0 6/10/2014 02:30 PM 0 0 6/10/2014 02:45 PM 0 1 6/10/2014 03:00 PM 1 0 6/10/2014 03:15 PM 1 2 6/10/2014 03:30 PM 0 2 6/10/2014 03:45 PM 0 3 6/10/2014 04:00 PM 2 2 6/10/2014 04:15 PM 2 2 6/10/2014 04:30 PM 1 1 6/10/2014 04:45 PM 3 0 6/10/2014 05:00 PM 0 4 6/10/2014 05:15 PM 1 0 6/10/2014 05:30 PM 0 1 6/10/2014 05:45 PM 1 1 6/10/2014 06:00 PM 1 1 6/10/2014 06:15 PM 1 1 6/10/2014 06:30 PM 1 1 6/10/2014 06:45 PM 2 1 6/10/2014 07:00 PM 1 0 6/10/2014 07:15 PM 0 1 6/10/2014 07:30 PM 1 0 6/10/2014 07:45 PM 0 1 6/10/2014 08:00 PM 1 0 6/10/2014 08:15 PM 1 0 6/10/2014 08:30 PM 1 0 6/10/2014 08:45 PM 1 0 6/10/2014 09:00 PM 0 0 6/10/2014 09:15 PM 0 0 6/10/2014 09:30 PM 0 0 6/10/2014 09:45 PM 1 0 6/10/2014 10:00 PM 0 0 6/10/2014 10:15 PM 0 0 6/10/2014 10:30 PM 0 0 6/10/2014 10:45 PM 0 0 6/10/2014 11:00 PM 1 0 6/10/2014 11:15 PM 0 0 6/10/2014 11:30 PM 0 0 6/10/2014 11:45 PM 0 0 79 70 149 APPENDIX B Intersection Calculation Sheets HCM 2010 Signalized Intersection Summary 1: Grand Avenue & 27th Street 17237a ex -am 6/22/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations "i 4 fir Volume (veh/h) 134 423 62 22 86 13 21 26 37 20 46 58 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 190.0 186.3 190.0 186.3 186.3 190.0 190.0 186.3 190.0 190.0 186.3 186.3 Adj Flow Rate, veh/h 146 460 67 24 93 14 23 28 40 22 50 63 Adj No. of Lanes 0 1 0 1 1 0 0 1 0 0 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 298 841 113 597 1052 158 154 74 85 169 170 194 Arrive On Green 0.66 0.66 0.66 0.66 0.66 0.66 0.12 0.12 0.12 0.12 0.12 0.12 SatFlow,veh/h 273 1266 170 872 1582 238 281 603 693 362 1384 1583 Grp Volume(v), veh/h 673 0 0 24 0 107 91 0 0 72 0 63 Grp Sat Flow(s),veh/h/In 1709 0 0 872 0 1821 1577 0 0 1747 0 1583 Q Serve(g_s), s 1.4 0.0 0.0 0.6 0.0 0.8 0.7 0.0 0.0 0.0 0.0 1.4 Cycle Q Clear(g_c), s 7.5 0.0 0.0 8.1 0.0 0.8 2.0 0.0 0.0 1.3 0.0 1.4 Prop In Lane 0.22 0.10 1.00 0.13 0.25 0.44 0.31 1.00 Lane Grp Cap(c), veh/h 1253 0 0 597 0 1210 313 0 0 339 0 194 V/C Ratio(X) 0.54 0.00 0.00 0.04 0.00 0.09 0.29 0.00 0.00 0.21 0.00 0.32 Avail Cap(c_a), veh/h 1253 0 0 597 0 1210 1242 0 0 1327 0 1137 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 3.3 0.0 0.0 5.5 0.0 2.2 15.3 0.0 0.0 15.1 0.0 15.1 Incr Delay (d2), s/veh 1.7 0.0 0.0 0.1 0.0 0.1 0.5 0.0 0.0 0.3 0.0 1.0 Initial 0 Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 4.1 0.0 0.0 0.2 0.0 0.4 0.9 0.0 0.0 0.7 0.0 0.6 LnGrp Delay(d),s/veh 5.0 0.0 0.0 5.7 0.0 2.4 15.8 0.0 0.0 15.4 0.0 16.0 LnGrp LOS A A A B B B Approach Vol, veh/h 673 131 91 135 Approach Delay, s/veh 5.0 3.0 15.8 15.7 Approach LOS A A B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 29.0 8.6 29.0 8.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 25.0 27.0 25.0 27.0 Max Q Clear Time (g_c+I1), s 9.5 3.4 10.1 4.0 Green Ext Time (p_c), s 5.0 1.1 4.9 1.1 Intersection Summary HCM 2010 Ctrl Delay 7.1 HCM 2010 LOS A Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 Roundabout 2: Midland Avenue & 27th Street 17237a ex -am 6/22/2014 Intersection Intersection Delay, s/veh 10.0 Intersection LOS B Approach WB NB SB Entry Lanes 1 1 1 Conflicting Circle Lanes 1 1 1 Adj Approach Flow, veh/h 171 497 328 Demand Flow Rate, veh/h 175 507 335 Vehicles Circulating, veh/h 109 293 91 Vehicles Exiting, veh/h 691 133 193 Follow -Up Headway, s 3.186 3.186 3.186 Ped Vol Crossing Leg, #/h 0 0 0 Ped Cap Adj 1.000 1.000 1.000 Approach Delay, s/veh 5.3 13.7 6.9 Approach LOS A B A Lane Left Left Left Designated Moves R R LT Assumed Moves R R LT RT Channelized Lane Util 1.000 1.000 1.000 Critical Headway, s 5.193 5.193 5.193 Entry Flow, veh/h 175 507 335 Cap Entry Lane, veh/h 1013 843 1032 Entry HV Adj Factor 0.977 0.980 0.980 Flow Entry, veh/h 171 497 328 Cap Entry, veh/h 990 826 1011 V/C Ratio 0.173 0.601 0.325 Control Delay, s/veh 5.3 13.7 6.9 LOS A B A 95th %tile Queue, veh 1 4 1 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 TWSC 7: Midland Avenue & Mt. Sopris Drive 17237a ex -am 6/22/2014 Intersection Int Delay, s/veh 6.4 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 18 279 209 46 177 96 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 0 Veh in Median Storage, # 0 0 - 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 20 303 227 50 192 104 Major/Minor Minorl Majorl Major2 Conflicting Flow All 741 252 0 0 277 0 Stage 1 252 Stage 2 489 Critical Hdwy 6.42 6.22 4.12 Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 Follow-up Hdwy 3.518 3.318 2.218 Pot Cap -1 Maneuver 384 787 1286 Stage 1 790 Stage 2 616 Platoon blocked, % Mov Cap -1 Maneuver 323 787 1286 Mov Cap -2 Maneuver 323 Stage 1 Stage 2 790 519 Approach WB NB SB HCM Control Delay, s 12.7 0 5.4 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - 323 787 1286 - HCM Lane V/C Ratio - 0.061 0.385 0.15 HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - 16.9 12.4 8.3 0 -C B A A - 0.2 1.8 0.5 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 9: 4 Mile Road & Midland Avenue 17237a ex -am 6/22/2014 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) 44 58 3 78 137 3 Sign Control Stop Stop Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 48 63 3 85 149 3 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 301 0 386 299 0 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 301 0 386 299 0 tC, single (s) 6.5 6.2 7.1 6.5 4.1 tC, 2 stage (s) tF (s) 4.0 3.3 3.5 4.0 2.2 p0 queue free % 91 94 99 85 91 cM capacity (veh/h) 555 1085 469 557 1623 Direction, Lane # EB 1 WB 1 NB 1 Volume Total 111 88 152 Volume Left 0 3 149 Volume Right 63 0 3 cSH 769 553 1623 Volume to Capacity 0.14 0.16 0.09 Queue Length 95th (ft) 13 14 8 Control Delay (s) 10.5 12.7 7.3 Lane LOS B B A Approach Delay (s) 10.5 12.7 7.3 Approach LOS B B Intersection Summary Average Delay 9.7 Intersection Capacity Utilization 21.0% ICU Level of Service A Analysis Period (min) 15 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 Signalized Intersection Summary 1: Grand Avenue & 27th Street 17237a ex -pm 6/22/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations "i 4 fir Volume (veh/h) 102 265 30 29 451 37 68 59 37 24 41 281 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 190.0 186.3 190.0 186.3 186.3 190.0 190.0 186.3 190.0 190.0 186.3 186.3 Adj Flow Rate, veh/h 111 288 33 32 490 40 74 64 40 26 45 305 Adj No. of Lanes 0 1 0 1 1 0 0 1 0 0 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 235 562 58 502 937 76 232 186 89 228 340 431 Arrive On Green 0.55 0.55 0.55 0.55 0.55 0.55 0.27 0.27 0.27 0.27 0.27 0.27 SatFlow,veh/h 245 1020 105 1054 1700 139 439 684 325 437 1247 1583 Grp Volume(v), veh/h 432 0 0 32 0 530 178 0 0 71 0 305 Grp Sat Flow(s),veh/h/In 1370 0 0 1054 0 1838 1448 0 0 1684 0 1583 Q Serve(g_s), s 2.0 0.0 0.0 1.0 0.0 8.2 1.3 0.0 0.0 0.0 0.0 7.9 Cycle Q Clear(g_c), s 10.2 0.0 0.0 11.2 0.0 8.2 4.0 0.0 0.0 1.3 0.0 7.9 Prop In Lane 0.26 0.08 1.00 0.08 0.42 0.22 0.37 1.00 Lane Grp Cap(c), veh/h 855 0 0 502 0 1013 507 0 0 567 0 431 V/C Ratio(X) 0.51 0.00 0.00 0.06 0.00 0.52 0.35 0.00 0.00 0.13 0.00 0.71 Avail Cap(c_a), veh/h 855 0 0 502 0 1013 943 0 0 1084 0 942 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 6.2 0.0 0.0 10.6 0.0 6.4 13.4 0.0 0.0 12.5 0.0 14.9 Incr Delay (d2), s/veh 2.1 0.0 0.0 0.2 0.0 1.9 0.4 0.0 0.0 0.1 0.0 2.1 Initial 0 Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 4.1 0.0 0.0 0.3 0.0 4.7 1.8 0.0 0.0 0.7 0.0 3.6 LnGrp Delay(d),s/veh 8.4 0.0 0.0 10.9 0.0 8.4 13.8 0.0 0.0 12.6 0.0 17.0 LnGrp LOS A B A B B B Approach Vol, veh/h 432 562 178 376 Approach Delay, s/veh 8.4 8.5 13.8 16.2 Approach LOS A A B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 29.0 16.4 29.0 16.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 25.0 27.0 25.0 27.0 Max Q Clear Time (g_c+I1), s 12.2 9.9 13.2 6.0 Green Ext Time (p_c), s 5.5 2.5 5.2 2.6 Intersection Summary HCM 2010 Ctrl Delay 10.9 HCM 2010 LOS B Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 Roundabout 2: Midland Avenue & 27th Street 17237a ex -pm 6/22/2014 Intersection Intersection Delay, s/veh 19.8 Intersection LOS C Approach WB NB SB Entry Lanes 1 1 1 Conflicting Circle Lanes 1 1 1 Adj Approach Flow, veh/h 895 287 284 Demand Flow Rate, veh/h 912 293 290 Vehicles Circulating, veh/h 82 196 482 Vehicles Exiting, veh/h 407 576 512 Follow -Up Headway, s 3.186 3.186 3.186 Ped Vol Crossing Leg, #/h 0 0 0 Ped Cap Adj 1.000 1.000 1.000 Approach Delay, s/veh 26.6 7.3 11.0 Approach LOS D A B Lane Left Left Left Designated Moves R R LT Assumed Moves R R LT RT Channelized Lane Util 1.000 1.000 1.000 Critical Headway, s 5.193 5.193 5.193 Entry Flow, veh/h 912 293 290 Cap Entry Lane, veh/h 1041 929 698 Entry HV Adj Factor 0.981 0.981 0.980 Flow Entry, veh/h 895 287 284 Cap Entry, veh/h 1022 911 684 V/C Ratio 0.876 0.315 0.416 Control Delay, s/veh 26.6 7.3 11.0 LOS D A B 95th %tile Queue, veh 12 1 2 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 TWSC 7: Midland Avenue & Mt. Sopris Drive 17237a ex -pm 6/22/2014 Intersection Int Delay, s/veh 4.3 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 16 130 121 10 188 234 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 0 Veh in Median Storage, # 0 0 - 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 17 141 132 11 204 254 Major/Minor Minorl Majorl Major2 Conflicting Flow All 800 137 0 0 142 0 Stage 1 137 Stage 2 663 Critical Hdwy 6.42 6.22 4.12 Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 Follow-up Hdwy 3.518 3.318 2.218 Pot Cap -1 Maneuver 354 911 1441 Stage 1 890 Stage 2 512 - Platoon blocked, % Mov Cap -1 Maneuver 296 911 1441 Mov Cap -2 Maneuver 296 Stage 1 Stage 2 890 428 Approach WB NB SB HCM Control Delay, s 10.6 0 3.5 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - 296 911 1441 HCM Lane V/C Ratio - 0.059 0.155 0.142 HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - 17.9 9.7 7.9 0 -C A A A - 0.2 0.5 0.5 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 9: 4 Mile Road & Midland Avenue 17237a ex -pm 6/22/2014 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) 67 162 5 40 86 1 Sign Control Stop Stop Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 73 176 5 43 93 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 188 0 400 188 0 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 188 0 400 188 0 tC, single (s) 6.5 6.2 7.1 6.5 4.1 tC, 2 stage (s) tF (s) 4.0 3.3 3.5 4.0 2.2 p0 queue free % 89 84 99 93 94 cM capacity (veh/h) 666 1085 412 666 1623 Direction, Lane # EB 1 WB 1 NB 1 Volume Total 249 49 95 Volume Left 0 5 93 Volume Right 176 0 1 cSH 916 623 1623 Volume to Capacity 0.27 0.08 0.06 Queue Length 95th (ft) 28 6 5 Control Delay (s) 10.4 11.3 7.3 Lane LOS B B A Approach Delay (s) 10.4 11.3 7.3 Approach LOS B B Intersection Summary Average Delay 9.7 Intersection Capacity Utilization 25.0% ICU Level of Service A Analysis Period (min) 15 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 Signalized Intersection Summary 17237a non -site -2015 -am 1: Grand Avenue & 27th Street 6/22/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations "i 4 fir Volume (veh/h) 137 431 63 22 88 13 21 27 38 20 47 59 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 190.0 186.3 190.0 186.3 186.3 190.0 190.0 186.3 190.0 190.0 186.3 186.3 Adj Flow Rate, veh/h 149 468 68 24 96 14 23 29 41 22 51 64 Adj No. of Lanes 0 1 0 1 1 0 0 1 0 0 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 299 838 112 586 1055 154 153 76 87 168 172 196 Arrive On Green 0.66 0.66 0.66 0.66 0.66 0.66 0.12 0.12 0.12 0.12 0.12 0.12 SatFlow,veh/h 275 1262 169 865 1590 232 275 612 699 355 1393 1583 Grp Volume(v), veh/h 685 0 0 24 0 110 93 0 0 73 0 64 Grp Sat Flow(s),veh/h/In 1707 0 0 865 0 1822 1587 0 0 1747 0 1583 Q Serve(g_s), s 1.8 0.0 0.0 0.6 0.0 0.8 0.7 0.0 0.0 0.0 0.0 1.4 Cycle Q Clear(g_c), s 7.8 0.0 0.0 8.4 0.0 0.8 2.0 0.0 0.0 1.3 0.0 1.4 Prop In Lane 0.22 0.10 1.00 0.13 0.25 0.44 0.30 1.00 Lane Grp Cap(c), veh/h 1249 0 0 586 0 1209 316 0 0 341 0 196 V/C Ratio(X) 0.55 0.00 0.00 0.04 0.00 0.09 0.29 0.00 0.00 0.21 0.00 0.33 Avail Cap(c_a), veh/h 1249 0 0 586 0 1209 1242 0 0 1325 0 1135 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 3.4 0.0 0.0 5.7 0.0 2.3 15.3 0.0 0.0 15.0 0.0 15.1 Incr Delay (d2), s/veh 1.7 0.0 0.0 0.1 0.0 0.1 0.5 0.0 0.0 0.3 0.0 1.0 Initial 0 Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 4.2 0.0 0.0 0.2 0.0 0.4 0.9 0.0 0.0 0.7 0.0 0.7 LnGrp Delay(d),s/veh 5.1 0.0 0.0 5.9 0.0 2.4 15.8 0.0 0.0 15.4 0.0 16.0 LnGrp LOS A A A B B B Approach Vol, veh/h 685 134 93 137 Approach Delay, s/veh 5.1 3.0 15.8 15.7 Approach LOS A A B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 29.0 8.7 29.0 8.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 25.0 27.0 25.0 27.0 Max Q Clear Time (g_c+I1), s 9.8 3.4 10.4 4.0 Green Ext Time (p_c), s 5.1 1.1 5.0 1.1 Intersection Summary HCM 2010 Ctrl Delay 7.2 HCM 2010 LOS A Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 Roundabout 17237a non -site -2015 -am 2: Midland Avenue & 27th Street 6/22/2014 Intersection Intersection Delay, s/veh 10.3 Intersection LOS B Approach WB NB SB Entry Lanes 1 1 1 Conflicting Circle Lanes 1 1 1 Adj Approach Flow, veh/h 175 507 334 Demand Flow Rate, veh/h 179 517 341 Vehicles Circulating, veh/h 111 298 93 Vehicles Exiting, veh/h 704 136 197 Follow -Up Headway, s 3.186 3.186 3.186 Ped Vol Crossing Leg, #/h 0 0 0 Ped Cap Adj 1.000 1.000 1.000 Approach Delay, s/veh 5.3 14.2 7.0 Approach LOS A B A Lane Left Left Left Designated Moves R R LT Assumed Moves R R LT RT Channelized Lane Util 1.000 1.000 1.000 Critical Headway, s 5.193 5.193 5.193 Entry Flow, veh/h 179 517 341 Cap Entry Lane, veh/h 1011 839 1030 Entry HV Adj Factor 0.978 0.980 0.980 Flow Entry, veh/h 175 507 334 Cap Entry, veh/h 989 822 1009 V/C Ratio 0.177 0.616 0.331 Control Delay, s/veh 5.3 14.2 7.0 LOS A B A 95th %tile Queue, veh 1 4 1 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 TWSC 17237a non -site -2015 -am 7: Midland Avenue & Mt. Sopris Drive 6/22/2014 Intersection Int Delay, s/veh 6.4 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 18 285 213 47 181 98 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 0 Veh in Median Storage, # 0 0 - 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 20 310 232 51 197 107 Major/Minor Minorl Majorl Major2 Conflicting Flow All 757 257 0 0 283 0 Stage 1 257 Stage 2 500 Critical Hdwy 6.42 6.22 4.12 Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 Follow-up Hdwy 3.518 3.318 2.218 Pot Cap -1 Maneuver 375 782 1279 Stage 1 786 Stage 2 609 Platoon blocked, % Mov Cap -1 Maneuver 314 782 1279 Mov Cap -2 Maneuver 314 Stage 1 Stage 2 786 509 Approach WB NB SB HCM Control Delay, s 12.9 0 5.4 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - 314 782 1279 - HCM Lane V/C Ratio - 0.062 0.396 0.154 HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - 17.2 12.6 8.3 0 -C B A A - 0.2 1.9 0.5 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 17237a non -site -2015 -am 9: 4 Mile Road & Midland Avenue 6/22/2014 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) 45 59 3 80 140 3 Sign Control Stop Stop Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 49 64 3 87 152 3 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 308 0 395 306 0 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 308 0 395 306 0 tC, single (s) 6.5 6.2 7.1 6.5 4.1 tC, 2 stage (s) tF (s) 4.0 3.3 3.5 4.0 2.2 p0 queue free % 91 94 99 84 91 cM capacity (veh/h) 550 1085 460 551 1623 Direction, Lane # EB 1 WB 1 NB 1 Volume Total 113 90 155 Volume Left 0 3 152 Volume Right 64 0 3 cSH 763 547 1623 Volume to Capacity 0.15 0.16 0.09 Queue Length 95th (ft) 13 15 8 Control Delay (s) 10.5 12.9 7.3 Lane LOS B B A Approach Delay (s) 10.5 12.9 7.3 Approach LOS B B Intersection Summary Average Delay 9.7 Intersection Capacity Utilization 21.2% ICU Level of Service A Analysis Period (min) 15 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 Signalized Intersection Summary 17237a non -site -2015 -pm 1: Grand Avenue & 27th Street 6/22/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations "i 4 fir Volume (veh/h) 104 270 31 30 460 38 69 60 38 25 42 287 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 190.0 186.3 190.0 186.3 186.3 190.0 190.0 186.3 190.0 190.0 186.3 186.3 Adj Flow Rate, veh/h 113 293 34 33 500 41 75 65 41 27 46 312 Adj No. of Lanes 0 1 0 1 1 0 0 1 0 0 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 230 549 57 476 931 76 233 188 91 232 342 438 Arrive On Green 0.55 0.55 0.55 0.55 0.55 0.55 0.28 0.28 0.28 0.28 0.28 0.28 SatFlow,veh/h 239 1003 104 1049 1699 139 438 679 327 446 1236 1583 Grp Volume(v), veh/h 440 0 0 33 0 541 181 0 0 73 0 312 Grp Sat Flow(s),veh/h/In 1346 0 0 1049 0 1838 1443 0 0 1682 0 1583 Q Serve(g_s), s 2.5 0.0 0.0 1.0 0.0 8.6 1.4 0.0 0.0 0.0 0.0 8.1 Cycle Q Clear(g_c), s 11.2 0.0 0.0 12.2 0.0 8.6 4.1 0.0 0.0 1.3 0.0 8.1 Prop In Lane 0.26 0.08 1.00 0.08 0.41 0.23 0.37 1.00 Lane Grp Cap(c), veh/h 836 0 0 476 0 1007 511 0 0 574 0 438 V/C Ratio(X) 0.53 0.00 0.00 0.07 0.00 0.54 0.35 0.00 0.00 0.13 0.00 0.71 Avail Cap(c_a), veh/h 836 0 0 476 0 1007 935 0 0 1076 0 937 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 6.5 0.0 0.0 11.4 0.0 6.6 13.3 0.0 0.0 12.4 0.0 14.9 Incr Delay (d2), s/veh 2.4 0.0 0.0 0.3 0.0 2.1 0.4 0.0 0.0 0.1 0.0 2.2 Initial 0 Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 4.3 0.0 0.0 0.3 0.0 4.8 1.9 0.0 0.0 0.7 0.0 3.7 LnGrp Delay(d),s/veh 8.9 0.0 0.0 11.7 0.0 8.7 13.7 0.0 0.0 12.5 0.0 17.0 LnGrp LOS A B A B B B Approach Vol, veh/h 440 574 181 385 Approach Delay, s/veh 8.9 8.8 13.7 16.2 Approach LOS A A B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 29.0 16.6 29.0 16.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 25.0 27.0 25.0 27.0 Max Q Clear Time (g_c+I1), s 13.2 10.1 14.2 6.1 Green Ext Time (p_c), s 5.4 2.5 5.1 2.7 Intersection Summary HCM 2010 Ctrl Delay 11.2 HCM 2010 LOS B Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 Roundabout 17237a non -site -2015 -pm 2: Midland Avenue & 27th Street 6/22/2014 Intersection Intersection Delay, s/veh 21.5 Intersection LOS C Approach WB NB SB Entry Lanes 1 1 1 Conflicting Circle Lanes 1 1 1 Adj Approach Flow, veh/h 913 293 292 Demand Flow Rate, veh/h 932 299 298 Vehicles Circulating, veh/h 84 201 493 Vehicles Exiting, veh/h 416 590 523 Follow -Up Headway, s 3.186 3.186 3.186 Ped Vol Crossing Leg, #/h 0 0 0 Ped Cap Adj 1.000 1.000 1.000 Approach Delay, s/veh 29.2 7.5 11.5 Approach LOS D A B Lane Left Left Left Designated Moves R R LT Assumed Moves R R LT RT Channelized Lane Util 1.000 1.000 1.000 Critical Headway, s 5.193 5.193 5.193 Entry Flow, veh/h 932 299 298 Cap Entry Lane, veh/h 1039 924 690 Entry HV Adj Factor 0.980 0.981 0.980 Flow Entry, veh/h 913 293 292 Cap Entry, veh/h 1018 907 676 V/C Ratio 0.897 0.324 0.432 Control Delay, s/veh 29.2 7.5 11.5 LOS D A B 95th %tile Queue, veh 13 1 2 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 TWSC 17237a non -site -2015 -pm 7: Midland Avenue & Mt. Sopris Drive 6/22/2014 Intersection Int Delay, s/veh 4.3 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 16 133 123 10 192 239 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 0 Veh in Median Storage, # 0 0 - 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 17 145 134 11 209 260 Major/Minor Minorl Majorl Major2 Conflicting Flow All 816 139 0 0 145 0 Stage 1 139 Stage 2 677 Critical Hdwy 6.42 6.22 4.12 Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 Follow-up Hdwy 3.518 3.318 2.218 Pot Cap -1 Maneuver 347 909 1437 Stage 1 888 Stage 2 505 Platoon blocked, % Mov Cap -1 Maneuver 288 909 1437 Mov Cap -2 Maneuver 288 Stage 1 Stage 2 888 419 Approach WB NB SB HCM Control Delay, s 10.6 0 3.5 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - 288 909 1437 - HCM Lane V/C Ratio - 0.06 0.159 0.145 HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - 18.3 9.7 7.9 0 -C A A A - 0.2 0.6 0.5 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 17237a non -site -2015 -pm 9: 4 Mile Road & Midland Avenue 6/22/2014 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) 68 165 5 41 88 1 Sign Control Stop Stop Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 74 179 5 45 96 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 192 0 408 192 0 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 192 0 408 192 0 tC, single (s) 6.5 6.2 7.1 6.5 4.1 tC, 2 stage (s) tF (s) 4.0 3.3 3.5 4.0 2.2 p0 queue free % 89 83 99 93 94 cM capacity (veh/h) 661 1085 404 662 1623 Direction, Lane # EB 1 WB 1 NB 1 Volume Total 253 50 97 Volume Left 0 5 96 Volume Right 179 0 1 cSH 914 619 1623 Volume to Capacity 0.28 0.08 0.06 Queue Length 95th (ft) 28 7 5 Control Delay (s) 10.4 11.3 7.3 Lane LOS B B A Approach Delay (s) 10.4 11.3 7.3 Approach LOS B B Intersection Summary Average Delay 9.8 Intersection Capacity Utilization 25.3% ICU Level of Service A Analysis Period (min) 15 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 Signalized Intersection Summary 17237a total -2015 -am 1: Grand Avenue & 27th Street 7/14/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations "i 4 fir Volume (veh/h) 137 454 63 22 112 13 21 27 38 20 47 59 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 190.0 186.3 190.0 186.3 186.3 190.0 190.0 186.3 190.0 190.0 186.3 186.3 Adj Flow Rate, veh/h 149 493 68 24 122 14 23 29 41 22 51 64 Adj No. of Lanes 0 1 0 1 1 0 0 1 0 0 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 292 847 108 564 1089 125 153 76 87 168 172 196 Arrive On Green 0.66 0.66 0.66 0.66 0.66 0.66 0.12 0.12 0.12 0.12 0.12 0.12 SatFlow,veh/h 265 1275 163 845 1641 188 275 612 699 355 1393 1583 Grp Volume(v), veh/h 710 0 0 24 0 136 93 0 0 73 0 64 Grp Sat Flow(s),veh/h/In 1704 0 0 845 0 1830 1587 0 0 1747 0 1583 Q Serve(g_s), s 2.3 0.0 0.0 0.6 0.0 1.0 0.7 0.0 0.0 0.0 0.0 1.4 Cycle Q Clear(g_c), s 8.4 0.0 0.0 9.0 0.0 1.0 2.0 0.0 0.0 1.3 0.0 1.4 Prop In Lane 0.21 0.10 1.00 0.10 0.25 0.44 0.30 1.00 Lane Grp Cap(c), veh/h 1246 0 0 564 0 1214 316 0 0 341 0 196 V/C Ratio(X) 0.57 0.00 0.00 0.04 0.00 0.11 0.29 0.00 0.00 0.21 0.00 0.33 Avail Cap(c_a), veh/h 1246 0 0 564 0 1214 1242 0 0 1325 0 1135 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 3.5 0.0 0.0 6.0 0.0 2.3 15.3 0.0 0.0 15.0 0.0 15.1 Incr Delay (d2), s/veh 1.9 0.0 0.0 0.1 0.0 0.2 0.5 0.0 0.0 0.3 0.0 1.0 Initial 0 Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 4.6 0.0 0.0 0.2 0.0 0.6 0.9 0.0 0.0 0.7 0.0 0.7 LnGrp Delay(d),s/veh 5.4 0.0 0.0 6.2 0.0 2.5 15.8 0.0 0.0 15.4 0.0 16.0 LnGrp LOS A A A B B B Approach Vol, veh/h 710 160 93 137 Approach Delay, s/veh 5.4 3.0 15.8 15.7 Approach LOS A A B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 29.0 8.7 29.0 8.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 25.0 27.0 25.0 27.0 Max Q Clear Time (g_c+I1), s 10.4 3.4 11.0 4.0 Green Ext Time (p_c), s 5.4 1.1 5.2 1.1 Intersection Summary HCM 2010 Ctrl Delay 7.2 HCM 2010 LOS A Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 Roundabout 17237a total -2015 -am 2: Midland Avenue & 27th Street 7/14/2014 Intersection Intersection Delay, s/veh 10.9 Intersection LOS B Approach WB NB SB Entry Lanes 1 1 1 Conflicting Circle Lanes 1 1 1 Adj Approach Flow, veh/h 201 532 334 Demand Flow Rate, veh/h 205 542 341 Vehicles Circulating, veh/h 111 298 119 Vehicles Exiting, veh/h 729 162 197 Follow -Up Headway, s 3.186 3.186 3.186 Ped Vol Crossing Leg, #/h 0 0 0 Ped Cap Adj 1.000 1.000 1.000 Approach Delay, s/veh 5.6 15.2 7.2 Approach LOS A C A Lane Left Left Left Designated Moves R R LT Assumed Moves R R LT RT Channelized Lane Util 1.000 1.000 1.000 Critical Headway, s 5.193 5.193 5.193 Entry Flow, veh/h 205 542 341 Cap Entry Lane, veh/h 1011 839 1003 Entry HV Adj Factor 0.980 0.981 0.980 Flow Entry, veh/h 201 532 334 Cap Entry, veh/h 991 823 983 V/C Ratio 0.203 0.646 0.340 Control Delay, s/veh 5.6 15.2 7.2 LOS A C A 95th %tile Queue, veh 1 5 2 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 TWSC 17237a total -2015 -am 7: Midland Avenue & Mt. Sopris Drive 7/14/2014 Intersection Int Delay, s/veh 6.2 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 18 285 236 47 181 122 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 0 Veh in Median Storage, # 0 0 - 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 20 310 257 51 197 133 Major/Minor Minorl Majorl Major2 Conflicting Flow All 808 282 0 0 308 0 Stage 1 282 Stage 2 526 Critical Hdwy 6.42 6.22 4.12 Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 Follow-up Hdwy 3.518 3.318 2.218 Pot Cap -1 Maneuver 350 757 1253 Stage 1 766 Stage 2 593 - Platoon blocked, % Mov Cap -1 Maneuver 291 757 1253 Mov Cap -2 Maneuver 291 Stage 1 Stage 2 766 492 Approach WB NB SB HCM Control Delay, s 13.3 0 5 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - 291 757 1253 - HCM Lane V/C Ratio - 0.067 0.409 0.157 HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - 18.3 13 8.4 0 -C B A A - 0.2 2 0.6 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 17237a total -2015 -am 9: 4 Mile Road & Midland Avenue 7/14/2014 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) 69 59 3 103 140 3 Sign Control Stop Stop Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 75 64 3 112 152 3 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 308 0 408 306 0 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 308 0 408 306 0 tC, single (s) 6.5 6.2 7.1 6.5 4.1 tC, 2 stage (s) tF (s) 4.0 3.3 3.5 4.0 2.2 p0 queue free % 86 94 99 80 91 cM capacity (veh/h) 550 1085 434 551 1623 Direction, Lane # EB 1 WB 1 NB 1 Volume Total 139 115 155 Volume Left 0 3 152 Volume Right 64 0 3 cSH 711 547 1623 Volume to Capacity 0.20 0.21 0.09 Queue Length 95th (ft) 18 20 8 Control Delay (s) 11.3 13.3 7.3 Lane LOS B B A Approach Delay (s) 11.3 13.3 7.3 Approach LOS B B Intersection Summary Average Delay 10.4 Intersection Capacity Utilization 22.4% ICU Level of Service A Analysis Period (min) 15 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 TWSC 17237a total -2015 -am 17: Airport Center Road & Project Driveway 7/14/2014 Intersection Int Delay, s/veh 3.5 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 23 0 3 24 0 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 Veh in Median Storage, # 0 0 - 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 25 0 3 26 0 9 Major/Minor Minorl Majorl Major2 Conflicting Flow All 25 16 0 0 29 0 Stage 1 16 Stage 2 9 Critical Hdwy 6.42 6.22 4.12 Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 Follow-up Hdwy 3.518 3.318 2.218 Pot Cap -1 Maneuver 991 1063 1584 Stage 1 1007 Stage 2 1014 Platoon blocked, % Mov Cap -1 Maneuver 991 1063 1584 Mov Cap -2 Maneuver 991 Stage 1 Stage 2 1007 1014 Approach WB NB SB HCM Control Delay, s 8.7 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - 991 1584 - HCM Lane V/C Ratio - 0.025 HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - 8.7 0 - A A - 0.1 0 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 Signalized Intersection Summary 17237a total -2015 -pm 1: Grand Avenue & 27th Street 7/14/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations "i 4 fir Volume (veh/h) 104 290 31 30 484 38 69 60 38 25 42 287 Number 5 2 12 1 6 16 3 8 18 7 4 14 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped -Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 190.0 186.3 190.0 186.3 186.3 190.0 190.0 186.3 190.0 190.0 186.3 186.3 Adj Flow Rate, veh/h 113 315 34 33 526 41 75 65 41 27 46 312 Adj No. of Lanes 0 1 0 1 1 0 0 1 0 0 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap,veh/h 219 559 54 449 935 73 233 188 91 232 342 438 Arrive On Green 0.55 0.55 0.55 0.55 0.55 0.55 0.28 0.28 0.28 0.28 0.28 0.28 SatFlow,veh/h 220 1021 99 1028 1706 133 438 679 327 446 1236 1583 Grp Volume(v), veh/h 462 0 0 33 0 567 181 0 0 73 0 312 Grp Sat Flow(s),veh/h/In 1339 0 0 1028 0 1839 1443 0 0 1682 0 1583 Q Serve(g_s), s 2.9 0.0 0.0 1.1 0.0 9.2 1.4 0.0 0.0 0.0 0.0 8.1 Cycle Q Clear(g_c), s 12.1 0.0 0.0 13.2 0.0 9.2 4.1 0.0 0.0 1.3 0.0 8.1 Prop In Lane 0.24 0.07 1.00 0.07 0.41 0.23 0.37 1.00 Lane Grp Cap(c), veh/h 832 0 0 449 0 1008 511 0 0 574 0 438 V/C Ratio(X) 0.56 0.00 0.00 0.07 0.00 0.56 0.35 0.00 0.00 0.13 0.00 0.71 Avail Cap(c_a), veh/h 832 0 0 449 0 1008 935 0 0 1076 0 937 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 6.7 0.0 0.0 12.1 0.0 6.7 13.3 0.0 0.0 12.4 0.0 14.9 Incr Delay (d2), s/veh 2.7 0.0 0.0 0.3 0.0 2.3 0.4 0.0 0.0 0.1 0.0 2.2 Initial 0 Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 4.7 0.0 0.0 0.3 0.0 5.2 1.9 0.0 0.0 0.7 0.0 3.7 LnGrp Delay(d),s/veh 9.4 0.0 0.0 12.4 0.0 9.0 13.7 0.0 0.0 12.5 0.0 17.0 LnGrp LOS A B A B B B Approach Vol, veh/h 462 600 181 385 Approach Delay, s/veh 9.4 9.2 13.7 16.2 Approach LOS A A B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 29.0 16.6 29.0 16.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 25.0 27.0 25.0 27.0 Max Q Clear Time (g_c+I1), s 14.1 10.1 15.2 6.1 Green Ext Time (p_c), s 5.4 2.5 5.0 2.7 Intersection Summary HCM 2010 Ctrl Delay 11.4 HCM 2010 LOS B Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 Roundabout 17237a total -2015 -pm 2: Midland Avenue & 27th Street 7/14/2014 Intersection Intersection Delay, s/veh 23.7 Intersection LOS C Approach WB NB SB Entry Lanes 1 1 1 Conflicting Circle Lanes 1 1 1 Adj Approach Flow, veh/h 939 315 292 Demand Flow Rate, veh/h 958 322 298 Vehicles Circulating, veh/h 84 201 519 Vehicles Exiting, veh/h 439 616 523 Follow -Up Headway, s 3.186 3.186 3.186 Ped Vol Crossing Leg, #/h 0 0 0 Ped Cap Adj 1.000 1.000 1.000 Approach Delay, s/veh 32.7 7.8 12.0 Approach LOS D A B Lane Left Left Left Designated Moves R R LT Assumed Moves R R LT RT Channelized Lane Util 1.000 1.000 1.000 Critical Headway, s 5.193 5.193 5.193 Entry Flow, veh/h 958 322 298 Cap Entry Lane, veh/h 1039 924 672 Entry HV Adj Factor 0.980 0.979 0.980 Flow Entry, veh/h 939 315 292 Cap Entry, veh/h 1018 905 659 V/C Ratio 0.922 0.348 0.443 Control Delay, s/veh 32.7 7.8 12.0 LOS D A B 95th %tile Queue, veh 14 2 2 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 TWSC 17237a total -2015 -pm 7: Midland Avenue & Mt. Sopris Drive 7/14/2014 Intersection Int Delay, s/veh 4.2 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 16 133 143 10 192 263 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 0 Veh in Median Storage, # 0 0 - 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 17 145 155 11 209 286 Major/Minor Minorl Majorl Major2 Conflicting Flow All 864 161 0 0 166 0 Stage 1 161 Stage 2 703 Critical Hdwy 6.42 6.22 4.12 Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 Follow-up Hdwy 3.518 3.318 2.218 Pot Cap -1 Maneuver 325 884 1412 Stage 1 868 Stage 2 491 Platoon blocked, % Mov Cap -1 Maneuver 268 884 1412 Mov Cap -2 Maneuver 268 Stage 1 Stage 2 868 405 Approach WB NB SB HCM Control Delay, s 10.9 0 3.4 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1WBLn2 SBL SBT Capacity (veh/h) - 268 884 1412 - HCM Lane V/C Ratio - 0.065 0.164 0.148 HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - 19.4 9.9 8 0 -C A A A - 0.2 0.6 0.5 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM Unsignalized Intersection Capacity Analysis 17237a total -2015 -pm 9: 4 Mile Road & Midland Avenue 7/14/2014 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) 92 165 5 61 88 1 Sign Control Stop Stop Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 100 179 5 66 96 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 192 0 421 192 0 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 192 0 421 192 0 tC, single (s) 6.5 6.2 7.1 6.5 4.1 tC, 2 stage (s) tF (s) 4.0 3.3 3.5 4.0 2.2 p0 queue free % 85 83 99 90 94 cM capacity (veh/h) 661 1085 383 662 1623 Direction, Lane # EB 1 WB 1 NB 1 Volume Total 279 72 97 Volume Left 0 5 96 Volume Right 179 0 1 cSH 883 627 1623 Volume to Capacity 0.32 0.11 0.06 Queue Length 95th (ft) 34 10 5 Control Delay (s) 11.0 11.5 7.3 Lane LOS B B A Approach Delay (s) 11.0 11.5 7.3 Approach LOS B B Intersection Summary Average Delay 10.2 Intersection Capacity Utilization 26.6% ICU Level of Service A Analysis Period (min) 15 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 HCM 2010 TWSC 17237a total -2015 -pm 17: Airport Center Road & Project Driveway 7/14/2014 Intersection Int Delay, s/veh 3.3 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 20 0 2 24 0 6 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 Veh in Median Storage, # 0 0 - 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 22 0 2 26 0 7 Major/Minor Minorl Majorl Major2 Conflicting Flow All 22 15 0 0 28 0 Stage 1 15 Stage 2 7 Critical Hdwy 6.42 6.22 4.12 Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 Follow-up Hdwy 3.518 3.318 2.218 Pot Cap -1 Maneuver 995 1065 1585 Stage 1 1008 Stage 2 1016 Platoon blocked, % Mov Cap -1 Maneuver 995 1065 1585 Mov Cap -2 Maneuver 995 Stage 1 Stage 2 1008 1016 Approach WB NB SB HCM Control Delay, s 8.7 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - 995 1585 - HCM Lane V/C Ratio - 0.022 HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - 8.7 0 - A A - 0.1 0 Fedex Ground Station 816 Rick Engineering Co. Synchro 8 Report Page 1 APPENDIX C Trip Generation FedEx Ground O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O r .. 66 d L) 66 R 00 6Or.. Ch d L) 66 R 00 6 6 r .. .M d 0 0 0 0 0 0 0 0 0 N N N N N 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 O O O O O O O O O O O O O O O O O O O O O O O O r .N. M. L) CD R. 00 O O r .. .M d' Ln CD R 00 6 O r .. Ch 0 0 0 0 0 0 0 0 0 C. N N N N cp r O ~O Total Vehicle Flow Full Phase i CO O. 4) 0 r r r r CO f- Lf) CO CO d' r d' O N N d' r - N r N r U, r r Arrive N' r LS) r LC) d' O r N CO d' CO N (NI N- r N r r (NI Li) 4- r r Linehaul Full Phase Depart r r r r d• Arrive N r r d Spot Trailers Full Phase t Ca 0) 0 o Arrive O P&D Van Full Phase Depart 6) 6) L() Lf) N 4) > L L Q LC) L() 6) 6) 0) N Automobile Full Phase t CO C1 4) 0 - r N d- N N C., Cc) r d' O N r r r r N r N CO Arrive - r L() r it I- LO N CO LC) CO N r r r r r N CO O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. r N M 4 L1) CD R Op 6) O r N M 4 Lfl CD R CO 6) O r N M 4 0 0 0 0 0 0 0 0 0 N N N N N OO O O O O O O O O O O O O O O O O O O O O O O .. .. O r N CO d L() CD N- CO 6) O r N CO d- Ln CD N- OD 6) O r N CO C. 0 C. C. 0 C. 0 0 0 0 N N N N r 0 H APPENDIX D Turning Templates LEGEND FRONT TIRES REAR TIRES VEHICLE BODY 30 00 4.00 SU 20 00 Width Track Lock to Lock Time Steering Angle feet 8 00 8 00 6 00 31 80 40 20 0 40 80 120 GRAPHIC SCALE 1" = 40' RICK" ENGINEERING COMPANY 5620 FRIARS ROAD SAN DIEGO, CA 92110 619.291.0707 (FAX)619.291.4165 EXHIBIT 10 SINGLE UNIT TRUCK TURNING TEMPLATE - ROUNDABOUT FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY LEGEND FRONT TIRES REAR TIRES VEHICLE BODY 30.00 4 00 20.00 SU Width Track Lock to Lock Time Steering Angle feet 8 00 8.00 6 00 31 80 sa 0 \ \G GFP 2g5'M FF 3 1 �p0 40 20 0 40 80 GRAPHIC SCALE 1" = 40' RICK' ENGINEERING COMPANY 5620 FRIARS ROAD SAN DIEGO, CA 92110 619.291.0707 (FAX)619.291.4165 EXHIBIT 11 SINGLE UNIT TRUCK TURNING TEMPLATE - DRIVEWAY FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY LEGEND 6 50 FRONT TIRES REAR TIRES VEHICLE BODY 28 50 28.50 33 11 00 WB -67D Tractor Width Trailer Width Tractor Track Trailer Track feet 8 00 8 50 8 00 8.50 7 00 Lock to Lock Time Steering Angle Articulating Angle 6 00 15 60 70 00 40 20 0 40 80 120 GRAPHIC SCALE 1" = 40' RICK" ENGINEERING COMPANY 5620 FRIARS ROAD SAN DIEGO, CA 92110 619.291.0707 (FAX)619.291.4165 EXHIBIT 12 WB -67D TRUCK TURNING TEMPLATE - ROUNDABOUT FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY LEGEND 6 50 FRONT TIRES REAR TIRES VEHICLE BODY 28 50 T 1" 28.50 2 33 11 00 WB -67D Tractor Width Trailer Width Tractor Track Trailer Track RICK" ENGINEERING COMPANY feet 8.00 8 50 8.00 8 50 7 00 Lock to Lock Time Steering Angle Articulating Angle 5620 FRIARS ROAD SAN DIEGO, CA 92110 619.291.0707 (FAX)619.291.4165 6 00 15 60 70 00 O 1 \NG GFP 2,51 M P 3 0 (Ivo EXHIBIT 13 WB -67D TRUCK TURNING TEMPLATE - DRIVEWAY FEDERAL EXPRESS GROUND DISTRIBUTION FACILITY 20 0 40 80 120 GRAPHIC SCALE 1" = 40' C N O L 11/ 4- a 0 O n 0 0 a 0 U c + 0 > o o L o a m N o I 0 a CO 40 m Y M o n ' X 0) 0 10 O a T N� / c v 0 O D c O Lo O D 6 / O O h M O 00) / / Q co MSI 7�I