Loading...
HomeMy WebLinkAbout11 Permit!1111 lMXZi1'0*L tail LIli'!':k4NDMinci41,1I Ilf Reception#: 867979 09/15/20/5 02;15:22 PM Jean Rlberico 1 of 3 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO AMENDED LAND USE CHANGE PERMIT for An Amendment to a Land Use Change Permit (Resolution 2012-41) to Modify a Condition of Approval to Make The Telecommunication Facility Permanent, On a 183.1,7 Acre Property Owned By Ski Sunlight, Inc, Located Approximately 12.5 Miles South Of The City Of Glenwood Springs Off County Road 117 In Section 33, Township 7 South, Range 89 West Of The 60 P.M., Garfield County (Assessor's Parcel No. 2395-333-00-051) In accordance with and pursuant to provisions of the Garfield County Land Use and Development Code of 2013, as amended, and a Resolution of Approval (Resolution Number 2014-51, amending Resolution Number 2012-41) of the Board of County Commissioners of Garfield County, State of Colorado, the following activity is hereby authorized by Land Use Change Permit: An Amended Land Use Change Permit for a Telecommunication Facility as shown on the Site Plan Attached as Exhibit A (LPAA-7912) This Amended Land Use Change Permit is issued subject to the conditions contained in the Exhibit B and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Land Use and Development Code, as amended, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. ATTEST: ret_, m erk of the Board GARFIE,LDOUNTY BOARD OF COUNTY COMM} SIO RS, GARFIELD COUNTY, COLORADO /c. Date Page 1 of 3 3 Rill lliralUTA,14,:i'i NUA ®I 01 Reception##: 867979 09/1512015 02:15:22 PM Jean Alberico 2 of 3 Rec Fee.$0.00 Doc Fee:0.00 GARFIELD COUNTY CO Exhibit A (Project Site Plan) 1a X111` (l�l►$t i 0 ill W 11111 f e i II§ pis . $� 1" 99 7 d54 ia B 9 ¢ i< ; Ili e I�� liN Fill fairf, ,h------ N. S. W▪ rs.en ▪ to N. de/11,1* & •::;11)11101.1.40.518 N. e..6 \: IIL 1tflltMt , i ror �®// J. \ N. ii'/� ^ . , .�' mom.". ..vii• .. \ el 0,i10.11,4•4 • 4 / \ V •''' \ \ . 1.111111,011..h•1 t rmrowwngr. unntir t n wrwion[0..e ..1 /01,.................... N illii.411411111 c� 0 RIM. Nilill 0 J N. ' \ PROJECT SITE PLAN ` ru'n.rir::iC Page 2 of 3 ■CJI reaRMICOIV,L'`lflliiiMIWillhitlityi 11111 Reception14: 867979 09/15/2015 02:15.22 PM Jean Alberico 3 of 3 Rec Fee $0.00 Doc Fee:0.00 GARFIELD COUNTY CO Exhibit B (Conditions of Approval) Prior to Issuance of the Land Use Change Permit 1. The applicant shall provide Glenwood Springs and Rural Fire Protection District with MSDS sheets on all the hazardous materials and quantities that will be contained on the site and in the building. These sheets shall also be appropriately located on the cabinets and outside the fence of the site and in compliance with applicable codes. The doors to the building or equipment cabinet shall be signed in a viable location with hazardous materials identification signs as specified in NFPA 704 and Section 2703.5 in the 2009 edition of the International Fire Code (IFC). The building and area surrounding it shall comply with all the sections that apply in Chapter 27, Hazardous Materials -General Provisions and Chapters 28-44, 2009 edition of the IFC. These improvements shall be reviewed and installation confirmed by the Glenwood Springs and Rural Fire Protection District prior to issuance of the Land Use Change Permit. Other Conditions 2. That all representations made by the Applicant in the application shall be conditions of approval, unless specifically altered by the Board of County Commissioners. 3. That, with exception to the elimination of condition number 5 as identified in Resolution 2012-41, all other conditions from Resolution 2012-41 shall remain in effect including that the facility shall operate in accordance with all state, federal and local regulations, the tower shall be a painted / powder coated a darker non -reflective color that blends with the surrounding area, the mechanical pad shall be fenced that incorporates screening, and the facility shall be signed appropriately for all hazardous materials or applicable dangers. 4. Through the elimination of condition number 5 in Resolution 2012-41, the Land Use Change Permit for the Telecommunication Facility shall not be limited to two years. Page 3 of 3