HomeMy WebLinkAbout11 Permit!1111 lMXZi1'0*L tail LIli'!':k4NDMinci41,1I Ilf
Reception#: 867979
09/15/20/5 02;15:22 PM Jean Rlberico
1 of 3 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
AMENDED
LAND USE CHANGE PERMIT
for
An Amendment to a Land Use Change Permit (Resolution 2012-41) to Modify a
Condition of Approval to Make The Telecommunication Facility Permanent, On
a 183.1,7 Acre Property Owned By Ski Sunlight, Inc, Located Approximately 12.5
Miles South Of The City Of Glenwood Springs Off County Road 117 In Section
33, Township 7 South, Range 89 West Of The 60 P.M., Garfield County
(Assessor's Parcel No. 2395-333-00-051)
In accordance with and pursuant to provisions of the Garfield County Land Use and
Development Code of 2013, as amended, and a Resolution of Approval (Resolution
Number 2014-51, amending Resolution Number 2012-41) of the Board of County
Commissioners of Garfield County, State of Colorado, the following activity is hereby
authorized by Land Use Change Permit:
An Amended Land Use Change Permit for a Telecommunication Facility as shown on
the Site Plan Attached as Exhibit A
(LPAA-7912)
This Amended Land Use Change Permit is issued subject to the conditions contained in
the Exhibit B and shall be valid only during compliance with such conditions and other
applicable provisions of the Garfield County Land Use and Development Code, as
amended, Building Code, and other regulations of the Board of County Commissioners
of Garfield County, Colorado.
ATTEST:
ret_, m
erk of the Board
GARFIE,LDOUNTY BOARD OF COUNTY
COMM} SIO RS, GARFIELD COUNTY,
COLORADO
/c.
Date
Page 1 of 3
3
Rill lliralUTA,14,:i'i NUA ®I 01
Reception##: 867979
09/1512015 02:15:22 PM Jean Alberico
2 of 3 Rec Fee.$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
Exhibit A
(Project Site Plan)
1a
X111`
(l�l►$t i
0
ill
W 11111
f
e
i
II§
pis
.
$�
1"
99
7
d54
ia
B
9 ¢
i<
;
Ili
e
I��
liN
Fill
fairf,
,h------
N.
S. W▪ rs.en ▪ to
N.
de/11,1* &
•::;11)11101.1.40.518
N.
e..6 \: IIL
1tflltMt ,
i ror �®//
J. \
N.
ii'/� ^ . , .�' mom.". ..vii• .. \
el 0,i10.11,4•4
•
4 /
\ V •''' \ \
.
1.111111,011..h•1
t
rmrowwngr. unntir
t n
wrwion[0..e ..1 /01,.................... N illii.411411111
c�
0 RIM.
Nilill
0 J
N.
' \
PROJECT SITE PLAN ` ru'n.rir::iC
Page 2 of 3
■CJI reaRMICOIV,L'`lflliiiMIWillhitlityi 11111
Reception14: 867979
09/15/2015 02:15.22 PM Jean Alberico
3 of 3 Rec Fee $0.00 Doc Fee:0.00 GARFIELD COUNTY CO
Exhibit B
(Conditions of Approval)
Prior to Issuance of the Land Use Change Permit
1. The applicant shall provide Glenwood Springs and Rural Fire Protection
District with MSDS sheets on all the hazardous materials and quantities
that will be contained on the site and in the building. These sheets shall
also be appropriately located on the cabinets and outside the fence of the
site and in compliance with applicable codes. The doors to the building or
equipment cabinet shall be signed in a viable location with hazardous
materials identification signs as specified in NFPA 704 and Section
2703.5 in the 2009 edition of the International Fire Code (IFC). The
building and area surrounding it shall comply with all the sections that
apply in Chapter 27, Hazardous Materials -General Provisions and
Chapters 28-44, 2009 edition of the IFC. These improvements shall be
reviewed and installation confirmed by the Glenwood Springs and Rural
Fire Protection District prior to issuance of the Land Use Change Permit.
Other Conditions
2. That all representations made by the Applicant in the application shall be
conditions of approval, unless specifically altered by the Board of County
Commissioners.
3. That, with exception to the elimination of condition number 5 as identified
in Resolution 2012-41, all other conditions from Resolution 2012-41 shall
remain in effect including that the facility shall operate in accordance with
all state, federal and local regulations, the tower shall be a painted /
powder coated a darker non -reflective color that blends with the
surrounding area, the mechanical pad shall be fenced that incorporates
screening, and the facility shall be signed appropriately for all hazardous
materials or applicable dangers.
4. Through the elimination of condition number 5 in Resolution 2012-41,
the Land Use Change Permit for the Telecommunication Facility shall not
be limited to two years.
Page 3 of 3