Loading...
HomeMy WebLinkAboutApplicationCEi\' Garfield County 18 1015 Community Development Department 5�� 108 8`h Street, Suite 401 GARFIELD CU til y Glenwood Springs, CO 81601 ViMUNtin DBIcLrJ; t,�: �V • '1 i (970) 945-8212 www.earfield-countv.com TYPE OF CONSTRUCTION a, Commercial/Multi-Family •D Residential (SF, Duplex, or Townhome) ri Manufactured Home (SF or Duplex) BUILDING PERMIT APPLICATION ❑ Demolition ❑ Reroof O Grading (locate all utilities prior to grading) INVOLVED PARTIES Property Owner: Colorado Rocky Mountain School Phone: ( 970 ) 963-2562 Mailing Address: 1493 County Road 106, Carbondale, CO 81623 Contractor: B&H General Contractors Phone: ( 970 ) 945-0102 Mailing Address: 5317 County Road 154, Suite 206, GWS, CO 81601 Architect: Mt Daly Enterprises LLC Phone: ( 970 ) 963-9896 Mailing Address: 981 Cowen Drive, Ste C, Carbondale, CO 81623 Engineer: KL&A Structural Engineers Phone: ( 720 ) 881-7611 Mailing Address: 129 Emma Road, Unit A, Basalt, CO 81621 Manufactured Home Installer: NA Phone: ( Mailing Address: NA PROJECT NAME AND LOCATION Describe Work: Landscape Enhancements at Bar Fork & Tennis Courts )NA Job Address: 1493 County Road 106, Carbondale, CO 81623 (old 'New Boys Dorm') Assessor's Parcel Number: 239333100012 Sub. Lot Block Owner's Valuation of Work: $ 80 e(5 ) 3, 05". — Property Size (Sq.Ft or Acres): NA 1 Sq.Ft of Building: NA 456 xz4.99 Height:NA (existing) # of Floors: NA Class of Work❑ New T. Alteration Garage: Septic: 0 Attached • Addition — 0 Repair 0 Move/Relocation O Detached ❑ ISDS Type of Heat: 0 Natural Gas 0 Propane Driveway Permit: 0 Exempt Grading Square Feet of Earthwork ❑ Community 0 Electric ❑ Permit #: 0 Other Cubic Yards of Earthwork NOTICE Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County ISDS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, ISDS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above as well as have ' vided the required inform . on which is correct and accurate to the best of my knowledge. Pro y Owner Print and Sign gra. Cfr date OFFICIAL USE ONLY Special Conditions: Adjusted Valuation_ 15, 6755 - Plan Check Fee: 154. Z ( Permit Fee: Z 3 7. Z5 Manu home Fee: --- Misc Fees: ,_-- Total Fees: 9/. ii 6 Fees Paid: Whi :24 Balance Due: Z; 7.25 BP No: ISDS No: BLCO-3819 setbacks /725;e2.54 -5/v OCC Group: LA-- Const Type: uz5 zona - BUILDING / PLANNING DIVISION 6.004...........s 9z3 ii--- Signed Approval g PP pate Yd'}1s`I•111 ccs qig115 GarfieldCounty uilclin ®ni Han eview_ hec list Permit Number: /3GGo - 38 7? Building Engineered Foundation Driveway Permit Nl4 Al/i9 Surveyed Site Pian Septic Permit and Setbacks Grade/Topography 30% Attach Residential Plan Review List Subdivision Plat Notes Fire Department Review Valuation Determination/ Fees Red Line Plans/ Stamps/ Sticker Attach Conditions Application Signed Plan Reviewer to Sign Application Parcel/ Schedule No. 40# Snowload Letter— Manu. Homes Soils Report Planning/ Zoninj Property Line Setbacks 30 ft. Stream Setbacks / Flood Plain Building Height Zoning Sign -Off Nf41 Road Impact Fees Grade/ Topography 40% Planning Issues /U// Subdivision Plat General Comments: 131675- Mp�k"