HomeMy WebLinkAboutApplication- PermitJob Address
Garfield County
Building, Sanitation,
& Planning Department
108 8" ` Street, Suite #201
Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 3
Nature of Work Building Permit ay 07 -
Use of ldin_ T / 0.-3d
Owner
Contractor nt
NO. Oa9
:4-5003
be* I sr-bl ock 4I
t • a ' •
J
u-'/P°±A°
Amount of Permit $� .
GARFIELD COUNTY BUILDING PERMIT APPLICATION
TELEPHONE: (970) 9454212
GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO
PERMIT NO. 9D a9
INSPECTION LINE: (970) 945-9139
PARCEusciDULE No. a N o 7/ g 3c y C 1(
l UfAL\\"1csrr' C \4 TEL�Qc�(_� y AlrV35
KB ADDRESS:LO[
(
No. P BLOCK NO. U 11 SUBDIVISION/EXEMPTION
/ / fir oAMntfry rcKteh, yll,)45e..
2
mini
PAvi0 To A. at1
ALOIS A pi
";9riN Irl
i[Ta
3
CWNACTO• /ONDee GDNSTiQN c-Y;N
A°"N S U c 4. Toe)fAiPivoTv Le. ?/LJ t
T`� ?r7y9J
uc
4
.ua¢cecVwm.m
A°D.a.
Tr
LE NO.
5
f7.
so. .r®nom 2C41
.° Fr. (CLOT 7 7 7 3 5.... AT.
r
a�2j-9"N°TR!
�
6
a°' ° A S i o en- �c /ten/ra0
7
°acl"`"°" f/'4/ne0 STAItic7H,j' e S/s j1G J4,t;'2y D4i'e//1�5
8
a.... Mint_ Xam. 11.00111014 oKnA„M
Min 0.10.w.
9
CARPORT
GUAM )E°°u.m
OAS= c°°Y..II
10
Jcairn
X aa TNl
D IY.irelic Im _/ :MN Y1[ SEWDEPOSAL I arra �
W
°IVyqrSEWAGE/;7 % pp O, C'& Annum
vA1OMmNOL
/)
vArOATt 1 jQ !/ S% . COD
=MI CaNDITE010
A SEPARATE
COLORADO.
THIS PERMIT
AUTHORIZE-9
WORK I5
AFTER WORK
I HEREBY
KNOW
GOVERNING
HEREON
AUTHORY
LOCAL
CO
A. S
NOTICE
ELECTRICAL PERMIT 3 REQLHRED AND MUST BE ISSUED
BECOMES NULLND VOID IF WORK
.A
IS NOT COMMENCED WTTfLLN ISO DAYS. OR IF
SUSPENDED OR ABANDONED FOR A PERIOD OF 180
IS COMMENCED.
CERTIFY THAT I HAVE READ AND EYAMONED THIS
THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS
MI5 TYPE OF WORK WILLBE COMPLIED WITH
OR NOT. THE GRANTING OF A PERMIT DOES NOr
IT TO VIOLATE OR CANCEL THE PROVISIONS OF ANY
LAW REGULATING 0 E UCTION OR THE
BY TILE STATE OF
OR CONSTRICTION
CONSTRUCTION OR
DAYS AT ANY TIME
APPLICATION AND
OF LAWS
SPECIE
METIER ®
PRESUME TO GIVE
OTHER STATE OR
PERFORMANCE OF
PLAN CHECK FEE:
q6(0. 2// ^
L�
PEILfMIQnT�'F�EE:
ig0.55
TOTAL FEE: I DATE PERMIT ISSUED:
2452 -S l
OCC^QIOLT: /
K.. 8�/�
1
CONST: TYPE:
)
ZONING.
SETBACKS:
UCTION.
A oaf ...
5
. m m..°h°nad own . .. fj
�.,IA �O1 P., .1
T, �.. j v.
/ ,/
MANU. HOME:
,�E yAAy�41k.i
ICS/D"S—NO. a FEE: /aT gerai
AGREEMENT
PERMISSION 15 HEREBY GRANTED TO TILE APPUCANT AS OWNER CONTRACTOR ANILOR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS
DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT. THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED Bl
GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULL)
COMPLIED WITH IN THE LOCATION. ERECTION. CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE TTE PERMIT MAY THEN BE REVOKED BY NOTICE EROM‘
THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PIANS, SPECIFICATIONS AND OTHER DATA SHALL L NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE
CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED I ON THEREUNDER WHEN D
VIOLATION OF THIS CODE OK ANY OTHER ORDINANCE OR REGULATION OF THIS 8URISDICTION.
THE REVIEW OF THE Sr) PLANS AND SPECWICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTTTHITE AN ACCEPTANCE OF AW
RESPONSIBILTITES OR LIABILITIES BY G,ARFEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND t P 1. E TrIF �j AiIOI
DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER BUILDER AND OWNER. COMMENTS ARE INTENDED TO CO NATIVE AND IN SUPPOR:
OF THE OWNERS INTEREST.
1 _ iv vl ✓"
Gortirmoo3
R�L(� I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL)
(P\ (/*II yU Dl
t3
1.117,51:`,7)
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot and cold running
water, non-absorbent floors and walls finished and a privacy door;
5 All steps outside or Side over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all 1994 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all
the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATION
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupanc usse aid the issuance of a
Certificate of Occupancy for the dwelling under building permit # a�
Signature Date
bpcont
VALUATION/FEE DETERMINATION
Applicant (tom
Address 31
Date 2-2.5-
Finished (Livable Area):
ocn-e
Lwu
4.24
2 3/2.
*3 624
*
cibco
Total Square Feet
Valuation
Basement:
Unfinished
Conversion of Unfinished to Finished
Plan Check Fee for Conversion
Valuation
Garage:
Crawl Space:
Valuation
Valuation
Subdivision M on UM1Vf'CfeeLkit (n5e
Lot/BlockLot (5 0140C Y
Contractor ro Ake- Co, r'uc t .a .-
24 "9 17Z,224
518 1g IQ,779
Decks/Patios:
Covered
Valuation /44 K y
Open
Valuation Cj(0 }co -
Total
/>
Total Valuation
Garfield County
Road and Bridge Department
P.O. Box 426
Rifle, CO 81650
Phone -(970)625-8601 Fax- (970)625-8627
Invoice
Invoice Date: 3/8/2004 Invoice Number: 8
Bill To: David Tonder
1104 CR 308
Parachute , CO 81635
Driveway Permit Number. 8
$75.00 per Driveway Permit.
Driveway Permit Fee: $75.00
Total Due: $75.00
Thank You!
a*
Garfield County
Application for Driveway Permit
Application Date: 3/8/2004 Permit Number:8
Termination Date:4/8/2004 County Road Number: 372
District: 3 Sub -Contractor:
Permitee: David Tonder
Inspector: Jake Mall
hereby requests permission and authority from the Board of County Commissioners to construct a driveway approach (es)
on the right-of-way off of County Road, 372, At address of 372L Hawthorn Lot #15, adjacent to Applicant's property
located on the North side of road for the purpose of obtaining access to property.
Applicant submits herewith for the consideration and approval of the Board of County Commissioners, a sketch of the
proposed installation showing all the necessary specification detail including:
1. Frontage of lot along road.
2. Distance from centerline of road to property line.
3. Number of driveways requested
4. Width of proposed driveways and angle of approach.
5. Distance from driveway to road intersection, if any.
6. Size and shape of area separating driveways if more than one approach.
7. Setback distance of building(s) and other structure improvements.
8. No unloading of equipment on county road, any damage caused to county road will be repaired at subdivision
expense.
9. Responsible for two years from the date of completion.
General Provisions
1) The applicant represents all parties in interest, and affirms that the driveway approach (es) is to be constructed by
him for the bona fide purpose of securing access to his property and not for the purpose of doing business or
servicing vehicles on the road right of way.
2) The applicant shall furnish all labor and materials, perform all work, and pay all costs in connection with the
construction of the driveway(s). All work shall be completed within thirty (30) days of the permit date.
3) The type of construction shall be as designated and/or approved by the Board of County Commissioners or their
representative and all materials used shall be of satisfactory quality and subject to inspection and approval of the
Board of County Commissioners or their representative.
4) The traveling public shall be protected during the installation with proper warning signs and signals and the Board
of County Commissioners and their duly appointed agents and employee shall be held harmless against any action
for personal injury or property damage sustained by any reason of the exercise of the Permit.
5) The Applicant shall assume responsibility for the removal or clearance of snow, ice, or sleet upon any portion of
the driveway approach (es) even though deposited on the driveway(s) in the course of the County snow removal
operations.
6) In the event it becomes necessary to remove any right-of-way fence, the posts on either side of the entrance shall
• be §urely braced before the fence is cut to prevent any slacking of the remaining fence and all posts and wire
removed shall be turned over to the District Road Supervisor of the Board of County Commissioners.
7) No revisions or additions shall be made to the driveways) or its appurtenances on the right-of-way without written
permission of the Board ofCounty Commissioners.
8) Provisions and specifications outlined herein shall apply on all roads under the jurisdiction of the Board of County
Commissioners of Garfield County, Colorado, and the Specifications, set forth on the attached hereof and
incorporated herein as conditions hereof.
Special Conditions:
1. Driveway width needs to meet Battlement Mesa's Standards.
2. Asphalt or Concrete Specifications need to meet Battlement Mesa's specifications.
3. Work zone signage required.
4. No stoarge of building materials or dumpsters on County Road.
5. Inspection of driveway will be required upon completion and must be approved by person issuing permit.
In signing this application and upon receiving authorization and permission to install the driveway approach (es)
described herein the Applicant signifies that he has read, understands and accepts the foregoing provisions and conditions
and agrees to cptruct the driveway(s) in acce with the accompanying specification plan reviewed and approved
//�� ox�tp,,e}syofprd of County Commissioners.
%
Signed: � M )% _
David Tonder `�
Address: //t) 1a G� c d" pp><re /", t; re) C,2), s�/ s
Telephone Number: .9 l 0 d j `7r 1(1 ! l
Permit granted 3/8/2004, subject to the provisions, specifications and conditions stipulated herein.
For Board of County Comrpissioners' of Garfield County, Colorado;
aeltfL
Representative of Garfield County Road and Bridge Signature
Specifications
1. A driveway approach is understood to be that portion of the county road right -of way between the pavement edge
and the property line that is designed and used for the interchange of traffic between the roadway and abutting
property.
2. At any intersection, a driveway shall be restricted for a sufficient distance from the intersection to preserve the
normal and safe movement of traffic. (It is recommended for rural residence entrances that a minimum
intersection clearance of 50 feet be provided and for rural commercial entrances a minimum of 100 feet be
provided.)
3. All entrances and exits shall be so located and constructed that vehicles approaching or using them will be able to
obtain adequate sight distance in both directions along the county road in order to maneuver safely and without
interfering with county road traffic.
4. The Applicant shall not be permitted to erect any sign or display material, either fixed or movable, on or
extending over any portion of the county road right-of-way.
5. Generally, no more than one approach shall be allowed any parcel or property the frontage of which is less than
one hundred (100) feet. Additional entrances or exits for parcels having a frontage in excess of one hundred 100)
feet shall be permitted only after showing of actual convenience and necessity.
6. All driveways shall be so located that the flared portion adjacent to the traveled way will not encroach upon
adjoining property.
7. No commercial driveway shall have a width greater than thirty (30) feet measured at right angles to the centerline
of the driveway except as increased by permissible radii. No noncommercial driveway shall have a width greater
than twenty (20) feet measured at right angles to the centerline of the driveway, except as increased by
permissible radii.
8. The axis of an approach to the road may be at a right angle to the centerline of the county road and of any angle
between ninety (90) degrees and sixty (60) degrees but shall not be less than sixty (60) degrees. Adjustment will
be made according to the type of traffic to be served and other physical conditions.
9. The construction of parking or servicing areas on the county road right-of-way is specifically prohibited.
Commercial establishments for customer vehicles should provide off -the -road parking facilities.
10. The grade of entrance and exit shall slope downward and away from the road surface at the same rate as the
normal shoulder slope and for a distance equal to the width of the shoulder but in no case less than twenty (20)
feet from the pavement edge. Approach grades are restricted to not more than ten percent (10%).
1 I. All driveways and approaches shall be so constructed that they shall not interfere with the drainage system of the
street or county road. The Applicant will be required to provide, at his own expense, drainage structures at
entrances and exits, which will become an integral part of the existing drainage system. The Board of County
Commissioners or their representative, prior to installation, must approve the dimensions and types of all drainage
structures.
Note: This permit shall be made available at the site where and when work is being done. A work sketch or
drawing of the proposed driveway(s) must accompany application. No permit will be issued without drawing,
blueprint, or sketch.
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
for
SINGLE FAMILY DWELLING CONSTRUCTION
including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
and
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and expedite the
issuance of a permit it is important that complete information be provided. Adequate and complete
information will prevent delays in the plan review process. Reviewing a plan and the discovery that
required information has not been provided by the applicant may result in the delay of the permit
issuance and in proceeding with building construction. The owner or contractor may be required to
provide this information before the plan review may proceed This causes delays because other plans
that are in line for review may be given attention before the new information may be reviewed after it
has been provided to the Building Department.
Please review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review. If you do not, it may be
helpful to obtain a book titled "Dwelling Construction under the Uniform Building Code".
This book is available to you through this department at our cost. Also, please consider using
a design professional for assistance in your design and a construction professional for
construction of your project.
To provide for a more understandable plan in order to determine compliance with the building,
plumbing and mechanical codes, applicants are requested to review the following checklist prior to
and during design. Applicants are required to indicate appropriately and to submit the
completed checklist at time of application for a permit.
1
j
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to
scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A
section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -
rap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square
foot up to 7,000 feet in elevation, an 80 M.P.H. windshear, wind exposure B, windload of 15 pounds
per square foot, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or your
plans will be returned.
All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC.
1. Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each corner of the proposed structure(s) prepared by a
licensed surveyor and has the surveyors signature and professional stamp on the drawing?
Propertiesyvith slopes of 4S% or greater must be shown on the site plan.
Yes L- 3o°6,
2. Does the site plan also include any other buildings on the property, setback easements and
utility ease9ents?
Yes I/
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjacent prerties), streams or water courses?
Yes o
4. Does the site plan indicate the location and direction of the County or private road accessing
the property?
Yes
5. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
1
design?/
Yes v
6. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and thf clearances required between wood and earth?
Yes
7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist
spaces's ffits?
Yes
8. Do the plans include design loads as required by Garfield County for roof snow loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wind loads?
Yes V SG l3MmT t STC
9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
construct"?
Yes V
10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rpfiers or joists or trusses?
Yes
11. Does the building section drawing or other detail include the method of positive connection of
all columns pnd beams?
Yes V
12. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing (un isturbed) grade contours?
Yes
13. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado P II certifications or phase II EPA certification?
Yes No V /1-4j
14. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building Coe Chapter 37?
Yes No V it /A
•
15. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform Building
Code? /
Yes 1/ No
16. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes 17 No s c e Roo 11 S.F.
17. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a
walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and
specify safejy glazing for these areas?
Yes �/ No
18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated n the plan?
Yes lNo
19. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes v No
20. Do you understand that if you belong to a homeowners association, it is your responsibility to
obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? If you do not have written permission from
the association, do you understand that the plan check fee will not be refunded should the
architectur committee deny or reject your building plans?
Yes No
21. Will thisbe he only residential structure on the parcel?
Yes �/ No If no -Explain:
22. Have two ) complete sets of construction drawings been submitted with the application?
Yes
23. Do you understand that the minimum size a home can be on a lot is a 20ft. x 2011?
Yes V No
24. Have you designed or had this plan designed while considering building and other
construction code requirements?
4
Yes
No
25. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection y the Garfield County Building Department?
Yes No
26. Do you understand that approval for design and/or construction changes are required prior, to
the applicat n of these changes?
Yes__ No
27. Do you understand that the Building Department will collect a "Plan Review" fee from you at
the time of application submittal and that you will be required to pay the "Permit Fee" as well
as any "Road Impact" or "Septic System' fees required, at the time you pick up your building
permit?
Yes V No
28. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be
called in by 12:00 p.m. the day before; afternoon inspections must be called in by 4:00
p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will
delay your' spection one (1) day. Inspections are to be called in to 384-5003.
Yes No
29. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occupancy occupancy of the building?
Yes No
30. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent
of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for
the project c mplying with the Uniform Building Code?
Yes 1No
31. Are you aware that prior to issuance of a building permit you are required to show proof of a
driveway access permit or obtain a statement from the Garfield County Road & Bridge
Department stating one is not necessary? You can contact the Road & Bridge Department at
625-8601.
Yes No
32. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
5
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be required
at time of applicable inspection.
Yes V No
33. Are you aware, that on the front of the Building Permit Application you will need to fill in the
Parcel/Schedule Number for the lot you are applying for this permit on prior to issuance of a
building pe t? Your attention in this is appreciated.
Yes V No
I hereby acknowledge that I have read, understand and answered these questions to the
best of my ability.
Date
Signature
Phone: 9 7 0 a 91C 71/ ?/ (clays);
Project Name: '3/ ,.)9 l✓T Po/hive
(evenings)
(cerr)0€N�e�
Project Address: 7) »4/07ijcCw-1Ari V PAifAc4kiT JGO, /L
Notes:
If you have answered "No" on any of the questions, you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in issuing
the permit are to be expected. Work may not proceed without the issuance of a permit. If it is
determined by the Building Official that additional information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, the application may be placed
behind more recent applications for building permits in the review process and not reviewed until
required information has been provided and the application rotates again to first position for review,
delay in issuance of the permit or delay in proceeding with construction.
bpminreq
04/02
6
t
BATTLEMENT MESA SERVICE ASSOCIATION
ARCHITECTURAL COMMITTEE APPLICATION & CHECKLIST
(for New Home Construction projects)
Homeowner. A ii) b To ,v pG e
Home Mailing Address: 1 Com, o g �A (b c 9 w Tc) o• �%� ��
Horne Phone: 97e' 8s1 a_�i 11P) Wor Phone(ifdesired):
Project Address: 3/ AidwTw (4. 4,1 Lot: S" Block: L% Subdivision: Aloes mete c/Peer v')!n?c
Production Home PllaannName (if applicable):
Homebutlder: /cNDcR co Ns new Cris P'
Business Mailing Address: )) o y c 1P • l o g PAR b c 9 k Te) co, Riga r
Business Phone: ?7o rs 1 y ) Fax(ifdesired): S'J eh e
Submittal Date: 30 TbN o 1 Estimated Start Date: i C/N hp o k Estimated Completion Date: / 4 H n 0 i/
SUBMITTAL REQUIREMENTS: Two Copies each of items 1, 2 & 4 need to be submitted.
(Check -off items attached to the Application. Fill in spaces as indicated.)
✓ 1. Site Plan Drawing (I" = 10' or 1" = 20' scale) with the following information shown:
✓ Lot, Block & Subdivision name.
►✓ Street Address of Project.
I/ Building Setback Lines (also fill-in the shortest distance between property line to the
exterior wall closest to that property line). Please be aware that all Building Setback
Lines are taken from your Property Line Pins!! Your Property Line is NOT the
Curb Line!!
Dwelline Unit Garage
From Setback: 1 i� - 4 /1 95-1-‘1)
Left Side Setback: ( -- ? " ti/4
Right Side Setback: L '- " /D '
Rear Setback: N/A
✓ Utility Easements.
_ 41/44 55' Clear Site -Line at Intersection Corner Lots.
✓ Site Grading Elevations & Drainage.
First (main) Floor Height in relation to top of street curb at front -center of lot.
Driveways (including width of driveway), Walkways, Patios, etc.
Outbuildings.
Page 2 of 6
2. Architectural Drawings (1/4" = 1' or 1/8" = 1' scale) with the following information shown.
Floor Plan(s) with overall dimensions (fill-in the following square foot areas).
98 ' Sy, cr.
3 1 7 square feet
417 N square feet
S +I c
esD'Lb 'mg 34'13 F/oogCIA PPele
fc h ly team First Floor Finished Living Area:
Ng R ..m Nei. Second Floor Finished Living Area:
Lower Floor Finished Living Area:
Total Finished Living Area:
Total Unfinished Living Area:
Garage Area:
70
square feet
square feet
7 square feet
�o a 14 square feet
Building Elevations Plans indicating doors, windows, exterior materials, building height,
roof pitch, roof -mounted evaporative coolers, etc. (fill-in maximum height below).
Maximum building height to highest ridge line or building structural projection
6 feet above top of street curb at front -center of your lot.
Engineered (stamped) Foundation Plan.
44� Outbuildings indicating dimensions, elevations and overall height to ridge line.
3. Exterior Materials (,`.ill -in the selections below):
Roofing Material: AS PAIA) T Color: %3I)
Primary Siding Material: Color:
Accent Siding Material: Color:
Trim Material: Color:
Masonry Material: Color:
Stucco Materials: Color:
Front Door Material: 5 Tce / Color: %B D
Garage Door Material: ,2 eT4/- saesuleTe0 Color:
COLOR SAMPLE COLOR SAMPLE
COLOR SAMPLE COLOR SAMPLE
Page 3 of 6
SBD
COLOR SAMPLE
COLOR SAMPLE
T D 4. Landscape/Irrigation Plans with the following information:
Planting Plan (indicate areas of irrigated lawn, tree placement, shrub beds, ground covet,
etc.).
Plant Material listing by species of trees, shrubs and grasses.
Groundcover Material with weed control barrier.
Fences.
Other Landscape Improvements (decks, site lighting, flag poles, etc.).
5. Variance Request (if applicable) Give details below:
6. Residential Construction Monetary Deposit:
I/We hereby acknowledge and understand that our failure to complete Home Construction, Improvement
Projects or Landscaping Construction within the time constraints noted in Conditions 2. & 3. On Page
6 of this Application will result in a Notice and Opportunity for a Hearing before the BMSA Board of
Directors. If I/We are found in violation of these Conditions at the Hearing it will result in a fine to the
Owner of not less than 5500.00 per month for each full month in excess of the allotted completion time
frame.
I/We hereby acknowledge that Home Construction or Improvement Projects or Landscape Construction
features which are built in non-conformance with this full application, including the Conditions of
Approval noted on Page 6 of 6 herein, I/We will be cited by the BMSAJAC in written citation form at the
time of discovery. In extenuating circumstances a Variance may be requested from the BMSAJAC,
provided sucb Variance request item is within the purview and approval jurisdiction of the BMSAJAC.
If a Variance is not granted by the BMSA/AC and if the Non -Conforming Items are not corrected within
60 days after the date of written citation, Me will be served Notice of a Hearing before the BMSA Board
of Directors, and if IIWe are found in violation of these Non -Conforming Items at the Hearing I./We will
be fined a minimum of 5500.00 per Non -Conforming Item. Notwithstanding the foregoing, I/We
acknowledge that the BMSA Board of Directors and/or Architectural Committee may pursue any legal
remedy available in the event of a non-compliance.
Page 4 of 6
Failure to pay fines levied as determined at the Hearing may also result in a Lien being placed on your
Property or litigation Process initiated by the BMSA Board of Directors to secure conformance with this
full Application and its respective Conditions Of Approval.
LWe understand that Architectural Committee approval does not constitute approval of the local building
department, drainage design or structural soundness, nor does it constitute assurance that the plans
comply with all applicable codes, regulations, ordinances and laws.
1/We further acknowledge that any subsequent field changes whicb 1/We may desire to the Home
Construction or Improvement Projects of this original Application Submittal and the original Conditions
of Approval issued by the BMSA/AC will require an additional Revised Application Submittal on our
behalf, and that I/We will not proceed with any subsequent field changes until a Revised Conditions of
Approval have been issued to us by the BMSA/AC.
Owner's Signature(s): AS 1 4
Owner's Printed Narnes:
Builder's Signature
Q d v 10 evD eg Date: j O LT AO ,' G 5'
Date:
Builders Printed Name: b 4 v i D e To ND l/Q Date: e T 4 ^v o V
Pace 5 of 6
This portion of the Application Form is to be completed by the
Architectural Committee (not the Applicant).
CONDITIONS OF APPROVAL or DISAPPROVAL
1. No sitework or building construction may proceed on any Lot (including no preliminary she clearing,
grubbing, grade alteration, storing of rnaterial, foundation excavation, extension of underground utilities,
etc.) untf the Project has received a Project approval from the Architectural Committee and has been
issued a Building Permit (as required by Garfield County for new home or Renovation projects).
2. All general building and site improvements construction for any Project shall be completed and shall have
issued a Certificate of Occupancy from the Garfield County Building Department no later than. one (1)
year after the issuance date of this Architectural Committee Approval.
3. The complete landscaping and revegetation of the improved Lot, to specifically include the front, side and
rear yard areas, shall be completed no later than six (6) months from the date of the Ceniticate of
Occupancy.
4. If the selection of colors and /or landscaping plans are not included with this application they must be
submitted for approval before any action is taken to install the missing items.
5.
6.
is of Architectural Committee Members):
Application Approy for Construction subject to the above conditions:
By Chairman: Date:
Application Denied (Initials of Architectural Committee Members):
By:
Application Denied for reason(s) stated above:
By Chairman:
Page 6 of 6
Date:
BATTLEMENT MESA SERVICE ASSOCIATION
ARCHITECTURAL COMMITTEE APPLICATION SUBMITTAL FORM
(For New Home Construction)
INSTRUCTIONS:
This Application & Checklist is to be used for all project submittals to the Battlement Mesa Service Association
Architectural Committee (BMSA/AC). This form is intended to assist in ensuring that the application submittal
is complete. This will help provide a quicker, more thorough review process.
It is recommended that each Applicant thoroughly review the requirements of the current Arcbitectunl
Standards, the Amended and Restated Declaration of Covenants (including Resolutions) and the recorded
Final Plat for their respective neighborhood prior to preparing a submittal.
Applicants preparing a submittal should compare the information they are about to submit with the requirements
of this form and "check off' each required item on the form. If any item is not checked, the Application submittal
is not complete and should not be submitted. Incomplete Applications will not be processed and will be returned
to the Applicant.
In addition to the checklist, Applicants should fill in al] of the places on the Application Form where information
is requested. The Architectural Committee will use this information in evaluating your Application. If information
is requested but is not applicable to your specific project submittal, write "N/A" in the space provided. If some
required information is yet to be determined (such as exterior paint colors you may not have yet selected) write
"TBD" in the appropriated space provided. You will then be required to make a follow-up submittal with these
selections at a later date but before installation in the home.
DO NOT till in any information in the "Conditions for Approval" section of this form. This portion of the form
is for Architectural Committee use only.
When an Application is complete, please mail or deliver it to the following address:
Battlement Mesa Service Association
Architectural Committee Application
73-G Sipprelle Drive
P.O. Box 6006
Battlement Mesa, Colorado 81636
The Architectural Committee meets twice monthly on the 1" and 3"1 Wednesday, and Applications are due
one week prior to the Scheduled Meeting Dates for prior review by Committee members Please contact
Jane Chapman at (970) 285-9740 to confirm the next scheduled meeting date or to request further information.
We thank you in advance for your cooperation and in complying with the Architectural Standards of the
Battlement Mesa Service Association.
Page 1of6
PLAN REVIEW CHECKLIST
Applicant T R Date z-2 S- 041
Building
,/ Engineered Foundation
Planning/Zoning
Property Li Setbacks
30ft Streau Setbacks
Flood P .in
Vrtf Septic Pet -mit and Setbacks Build g Height
Grade/Topography 30% Zo ng Sign -off
Mach Residential Plan Review List ' .ad Impact Fees
Minimum Application Questionnaire ' OA/DRC Approval
Subdivision Plat Notes Grade/Topography 40%
/4. Fireb�Department Review Planning Issues
�\ aluation Determination/Fees Subdivision Plat Notes
Aa -Attach
I Line Plans/Stamps/Sticker
Aa Attach Conditions
✓Application Signed
Plan Reviewer To Sign Application
t/ Parcel/Schedule No.
14e1 40# Snowload Letter- Manf. Hms.
GENERAL NOTES:
441 Motor St
GRAND JUNr?iQN
LINCOLN DeVORE, Inc.
GEOTECHNICAL ENGINEER§ —GEOLOGISTS
rand Junction, CO 81505
40.
t
Toadet Construction .
'• • ll(4_Co. 1d. -3Q8
l araeliute, C(1'81635
Re: ' 'Garfield County Building Permit # 9029
31 Hawthorne Wy., Battlement Mesa, CO
Gentlemen:
April204 2004:
):',.
• +tr-
4 r, -
Y
•
- .
TEL ,(SC3t)242-8968
(9 ) 242-1561
GrandJunction Lincoln DeVore personnel have examined the in-place foundation RicKing at the above rekerenced Site on
s 3-25-04. bur examination was based on foundation engineering drawingsiptinatAlt siestatetcarby Grand Junction
-
Lincoln DeVore, Inc. for this site.
fl'footings were the correct width and depth as per our foundation design,
!'i'.
`*A
Junction Lincoln DeVore personnel have observed the foundationreinforcing steel at the above referenced site on
3-25-04:
Proper placement and quantity of steel reinforcing bars were found 41 the time of ors observation. rvation. Therefore, it is our
conclusion that the work done is in conformance with our previous reeommendatioats for this site.
We hope this letter has provided you with the information required. If questions arise or further information is needed,
please feel free to contact Grand Junction Lincoln-DeVore at any time.
Respectfully submitted,
GRAND JUNCTION
LINCOLI4-DeVORE, INC.
by: Edward M. Morris PE
Principal Engineer
GJLD Job # 90735-6J
,R,
ts
•
•
O
a
to
O
V
N
o'
C
a
N
0 r
3Cs?
C in
5 °'
0
N
com
c
0
o a
N
w
7
N
0
D
0
0
O
o
co0
O
U
N
W
C
D.
N
O r
O N
°?
0
:70'
0
n
m
sc
0
oa
N
W
(0
+r
N
-F.,
o
0
r
Job located
Job located
Permit No.
0' 41
N
0'
r c
c c
0' 0
i
w V
v 0.6
> C
"fa0
-w
(0'CL) no
0) r+
C
cw
N
L l00
d w
> d
A N
E
a
w,
0 W
N 9
O)
w C
•o IA
C C
0' 0
0
Z
V 0
O
0 o'
N C
L
w0
' O
c
d
^N r+
C
3
T� w
a
a 13
L 10
0) H
t0 H
L E
0•
a
0
ei
•° o
N
V
m co
a. a
c o
a ;:
a m
to
3 c
E
C m
O a
u c
m c
ucm
c w
0 0 v
mti
° 'o
m d E
2
m .0 c
tu
.L+m
,o a
m
m
ICCO
O t
C y JJJ"-- ... N
O
a 0 $ a ii
in
` 4. ma
u
CO
m
c
R
Y
V
a
m
a
N
3
E
0
u
O
U
O p
a U
A
m
.P
ma
Y
m
0
O
C
r
.0
1-
L
m
7
_c
.c - 5' O
3 0 ma
When correction(s) have been made, call for inspection at 970-384-5003.
Phone (970) 945-8212
No —1C2‘
BUILDIN
Assessor's Parcel No.&' 'll-lraiO4,1 Q{S
Date 3�
RMIT C D
Job Address �_:�� � (�- (-
Owner p 4QJ, , • L�lt4 Addresst\&tLK tIthPhone I "74A
ContractorcWfer AddressCfl ►1 _ Phone #s,OLAr-�
Settt cks: aFot Rear RH LH
�-✓�/ — CrOSPECTIONS
Soils Test
Footing
Foundation
Grout
Underground Plumbin
Rough Plumbinga
Framing (Q
Insulation
Roofing
Drywall i1 -Up -DV
Gas Piping (Q -.9.-0Cie
NOTES
Zoning
Weatherproofing
Mechanical KR Electrical Rough (State) "/-d Nle
Electrical Fi (State) o-1({ `) cat)
Final - Checklist Completed?
Certificate Occupancy #
Date
Septic System #
Date
Final
Otherrtu----7iWIErCr—
itaclau.,
(continue on back)
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issues * Zoned Area Permit No
!! // AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspecto d IMMEDIATELY BECOME NULL AND VOID.
Setbacks Front
Side Side
Rear
* 'YtliTCard Must Be Posted So It is Plainly Visible From The Street Until Final Inspectlon. -
INSPECTION RECORD
Footing c/
Foundatio n, d,ie, V j
I
Underground Plumbing 9 - S- r' , r it
Insulation (0_ (I_0�
Rough Plumbing (o_a �vav
Drywall ‘)_1(o D
Chimney & Vent 6 .a
le -/G
Piping 6 _a _O!�yy�
Final $_ll{ Gt#0yy1
Flectric Rough IDv <, . Sr Y 1..
Septic Final Abl,-
F � pla& dWi
(To includeplane and Windows
and Doone installed).
Notes• 11
D /i rat,
h I (Jr ,Qr,.'
:41, _v 4
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
Phone 384-5003 109 8th Street County Courthouse Glenwood Springs, Colorado.
APPROVED
Date
By
IF PLACED OUTSIDE - COVER WITH CLEAR PLASTIC