HomeMy WebLinkAboutApplication- PermitJob Address
Nature of Work
Use of Building
Garfield County
Building, Sanitation,
& Planning Department
108 8"' Street, Suite #201
Glenwood Springs, Co. 81601
Office- 945-8212 Inspection Line- 384-5003
NO. ccflD
/77o
Building Permit
4 -
teal /03 Cy( esSia P/c 23
Owner /4Gaa 09-ac
Contractor. /2"1-4-1/1/4.
Amount of Permit $ 66 a • a3 f3 �9' 9 b
Date
*ins? Awe
X74-ta)
` »O3
6 (� / 0) .' 4vAt ft t tut 6-c ClerkC,E1124.-t
' GARFIELD COUNTY BUILDING PERMIT APPLICATION
108 811 Street, Suite 201, Glenwood Springs, CO 81601
Phone: 970-945.8212 / Fax: 970-384-3470 / Inspection Line: 970-384-5003
Parcel/Schedule No: (9353a y '7 0033 7
/9
AGREEMENT
PERMISSION 15 HEREBY GRANTED TO THE PLI ANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE 1SSSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 3028.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT
IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF
ANY RESPONSIBILITIES OR LIABLTTIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS
AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, A OWNER. COMMENTS ARE
INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
de��Carfom.00J
iO� I HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL):
Job Address: 1870 Cole&Yti RVAre,(03Calei3o-NPA-te CO 8/47_3
1 Lot No: Block No: / Sulid. / Exemption:
2
Owner: ,JACK 41 cLy/nOA
Aca.SNe«
Address 54rrric
14-ODCtSs
AS •/o6
443ovt
Ph:
970 3o9 362v
Ph:
Wk Ph:
77o 7633373
Lic. No.
3
Contractor:
Toni Ru al of
Address:
4
Architect/Engineer: j s,/ cgouPtiy
ERivEsr goLtaift iT
A dress: /Goo BArts:r( OR.
KBerrnocf Co 8a.2.3
Ph: q -7o Cig 4(oo9 c.“...
77o 963 89/4 TEL
Lic. No.
5
Sq. Ft. of Building:��
Sq. Ft. of Lot: / 115
7Q���
Height:
No. of Floors:
fin.
T
6
Use of Building: ��,,�'' '. � - 2
7
Describe Work: A -Da P�0.„.,p.�, y ktie-iiz_-
8
Class of Work: w' New o Alteration o Remove
o Addition ❑ Move
9
10
Garage: o Single
V Double
Carport: o Single
o Double
>1 Driv w y Permi o On -Site Sewage Disposal ❑ Site Plan
/' (Septic)
11
Valuation of Work: $
Adjusted Valuations: $ 245i9, J
72 600C
12
No05/44,117-4 / S ���der e ¢-24
C
�-- IJ IQi q{�
NOTICE
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE
BY THE STATE OF COLORADO.
THISPERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION
AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR, IF
CONSTRUCTION OR WORK 15 SUSPENDED OR ABANDONED FOR A
PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL
PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE
COMPLETED WITHIN WHETHER SPECIFIED HEREIN OR NOT. THE
GRANTING OF A PE • T DOES NOT PRESUME TO GIVE AUTHORITY
TO 1 LATE 0 • AN 1 • L THE PROVISIONS OF ANY OTHER STATE OR
•CA 1 W "GU INC CONSTRUCTION OR THE PERFORMANCE
1PC0' RUC
r 1 /) f I lo 03
Plan Check Feesi) S
2 4
Per It Fe��j,
. 35-
5THISISSUED
Total Fee: Dated Permit Issued:
64 3 I n la=A I Ey Iq
)
0 C Groep,• C st. Type:'
, ��3 (/ I /
L^JI V -/Y
Zoning:
Setbacks:
Manu. Home: ISDS No. &
Fee:
1
/1\
■ I i�.R �• D
• , fI-2.5.03-�
• 29
•'
ji �Q
CLQ .t ii
DEPT NG. WEPT.'
APPRO DATE s/ " HOYALJ9ATE -
/9
AGREEMENT
PERMISSION 15 HEREBY GRANTED TO THE PLI ANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT
THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE 1SSSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 3028.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT
IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED
STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER
REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING
CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF
ANY RESPONSIBILITIES OR LIABLTTIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS
AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, A OWNER. COMMENTS ARE
INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
de��Carfom.00J
iO� I HEREBY ACKNOWLEDGE THAT 1 HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL):
Garfield County
Road and Bridge, District 1
7300 Hwy 82, Glenwood Springs, CO 81601
970-945-1223 ph. 945-1318 FAX
Date: 12-16-03
To: Building & Planning
From: Bobby 13
Re:
For: ack Gausnell
Carbondale CO 81623
Location: Same
ption
Scope of Work: Obtain building permit
Road and Bridge Concerns: For the current application this property currently meets
county roads standards and is therefore exempt from County driveway permit
requirements.
Bobby Branham
Dist.1 Road and Bridge
1
/ re-
(-)`\
. -, er; CMS
G,ARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT Permit N r 3 9 5 2
( 109 8th Street Sulte 303
Glenwood Springs, Colorado 81601
Phone (303) 945-8212
INDIVIDUAL SEWAGE DISPOSAL PERMIT
PROPERTY
Owner's Name
System Location
Present dress
Assessor's Parcel No.
This does not constitute
a building or use permit.
4090
O /D J 3
Phone tZ3 --- 3 57,3
393 —V4' Cx5-557
/C70
Legal Description of Assessor's Parcel No
SYSTEM DESIGN
7S—C2 0/0 Septic Tank Capacity (gallon) Other
11
Percolation Rate (minuteslinch) Number of Bedrooms or other)
Required Absorption Area - See Attached
Special Setback Requirements:
6-/G- 097
Date
193,t
09‘29//2-13'
cp Z tbi I!N Po i
Inspector
FINAL
FINAL SYSTEM INSPECTION AND APPROVAL (as installed)
Call for Inspection (24 hours notice) Before Covering Installation
System Installer
Septic Tank Capacity /6900
Septic Tank Manufacturer or Trade Name
Septic Tank Access within 8" of surface
Absorption Area /J1°1/
Absorption Area Type and/or Manufacturer or Trade Name
Adequate compliance with County and State regulations/requirements
Other �,y Z 1 �a
Date ( 2 3 ` C"r Inspector Le -...v ein
RETAIN WITH RECEIPT RECORDS AT CORUCTION SITE
*CONDITIONS:
1. All installation must comply with all requirements of the Colorado State Board of Health Individual Sewage Disposal Systems Chapter
25, Article 10 C.R.S. 1973, Revised 1984.
2. This permit is valid only for connection to structures which have fully complied with County zoning and building requirements. Con-
nection to or use with any dwelling or structures not approved by the Building and Zoning office shall automatically be a violation or a
requirement of the permit and cause for both legal action and revocation of the permit.
3. Any person who constructs,alters, or installs an individual sewage disposal system in a manner which involves a knowing and material
variation from the terms or specifications contained in the application of permit commits a Class I, Petty Offense ($500.00 fine —6
months in jail or both).
White - APPLICANT Yellow - DEPARTMENT
PLAN REVIEW CHECKLIST
ApplicantGA ) u K1u Date 1/ Z, $"-03
Building
/
✓ Engineered Foundation
R+( j2,-16--3
..,Driveway Permit
�urveyed Site Plan
4. Septic Permit and Setbacks
---Grade/Topography 30%
attach Residential Plan Review List
-/ Minimum Application Questionnaire
`4ubdivision Plat Notes
1(
/14 Fire Department Review
✓Valuation Determination/Fees
✓Red Line Plans/Stamps/Sticker
44,4 Attach Conditions
Application Signed
,Si4u. 0 r2
../Ian Reviewer To Sign Application
✓Pereeligeheelde-No.
Rill)
Tp i 40# SnowloadLetter- Man£ Hr .
GENERAL NOTES:
/40 $ Ig = Z51920
Planning/Zoning
Property Lin Setbacks
30ft Stre. • Setbacks
Flood P
Buil .g Height
g Sign -off
Impact Fees
OA/DRC Approval
ade/Topography 40%
Planning Issues
Subdivision Plat Notes
S s_
720 >~ /a iz, %o
72.0 w.W? J 34 720
51
la" 996,80
Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and
drawn to scale.
Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with
decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line.
A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar,
anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house -
rap, (which is required), siding or any approved building material.
A window schedule. A door schedule.
A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square
foot up to 7,000 feet in elevation, an 80 M.P.H. windshear, wind exposure B, windload of 15 pounds
per square foot, and a 36 inch frost depth.
All sheets to be identified by number and indexed. All of the above requirements must be met or
your plans will be returned.
All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC.
1. Is a site plan included that identifies the location of the proposed structure or addition and
distances to the property lines from each corner of the proposed structure(s) prepared by a
licensed surveyor and has the surveyors signature and professional stamp on the drawing?
Properties with slopes of 30% or greater must be shown on the site plan. NOTE: 106.3.1
(7.) Any site plan for the placement of any portion of a structure within 50 ft. of a
property line and not within a previously surveyed building envelope on a subdivision
final plat shall be prepared by a licensed surveyor and have the surveyors signature and
professional stamp on the drawing. Any structure to be built within a building envelope
of a lot shown on a recorded subdivision plat, shall include a copy of the building
envelope as it is shown on the final plat with the proposed structure located within the
envelope.
Yes
2. Does the site plan also include any other buildings on the property, setback easements and
utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution
if the property you are applying for a building permit on is located on a comer lot. Special
setbacks do a ply.
Yes V
3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to the property lines, wells (on subject property and
adjacent properties), streams or water courses?
Yes
2
4. Does the site plan indicate the location and direction of the County or private road accessing
the property
Yes
5. Do the plans include a foundation plan indicating the size, location and spacing of all
reinforcing steel in accordance with the uniform building code or per stamped engineered
design? ✓
Yes
6. Do the plans indicate the location and size of ventilation openings for under floor crawl
spaces and the clearances required between wood and earth?
Yes AVA
7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist
spaces's and soffits?
Yes ✓
8. Do the plans include design loads as required by Garfield County for roof snow Loads, (a
minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor
loads and wigd loads?
Yes ✓
9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof
construction?
Yes ✓
10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling
joists, roof rafters or joists or trusses?
Yes
11. Does the building section drawing or other detail include the method of positive connection
of all columns and beams?
Yes ✓
12. Does the plan indicate the height of the building or proposed addition from the highest point
of the building or addition measured at mid span between the ridge and the eave down to
existing (undis rbed) grade contours?
Yes
13. Does the plan include any stove or zero clearance fireplace planned for installation including
make and model and Colorado Phasy II certifications or phase II EPA certification?
Yes No ✓
3
14. Does the plan include a masonry fireplace including a fireplace section indicating design to
comply with the Uniform Building Code Chapter 37?
Yes No
15. Does the plan include a window schedule or other verification that egress/rescue windows
from sleeping rooms and/or basements comply with the requirements of the Uniform
Building Cod
Yes /vNo
16. Does the plan include a window schedule or other verification that windows provide natural
light and ventilation for all habitable rooms?
Yes V No
17. Do the plans indicate the location of glazing subject to human impact such as glass doors,
glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as
a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures
and specify safety glazing for these areas?
Yes tI//} No
18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters
indicated op�the plan?
Yes g°/nA No
19. Do you understand that if you are building on a parcel of land created by the exemption
process or the subdivision process, are building plans in compliance with all plat notes and/or
covenants?
Yes V No
20. Do you understand that if you belong to a homeowners association, it is your responsibility
to obtain written permission from the association, if required by that association, prior to
submitting an application for a building permit? If you do not have written permission from
the association, do you understand that the plan check fee will not be refunded should the
architectural ommittee deny or reject your building plans?
Yes /Jf� No
21. Will this be the only residential structure on the parcel?
Yes No / If no -Explain: 7413 15 Moi 4 fee- S/ca4u-n4j
srnucru t
22. Have two (2) complete sets of construction drawings been submitted with the application?
Yes ✓
23. Do you understand that the minimum dimensions a home can be on a lot is 20ft.wide and
20ft. long?
Yes (✓ No
4
24. Have you designed or had this plan designed while considering building and other
construction code requirements?
Yes ✓ No
25. Do your plans comply with all zoning rules and regulations in the County related to your
properties zone district?
Yes ✓ No
26. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the Garfield County Building Department?
Yes V No
27. Do you understand that approval for design and/or construction changes are required prior to
the applicatiogof these changes?
Yes ✓✓ No
28. Do you understand that the Building Department will collect a "Plan Review" fee from you
at the time of application submittal and that you will be required to pay the "Permit Fee" as
well as any "Road Impact" or "Septic System" fees required, at the time you pick up your
building p it?
Yes No
29. Are you aware that twenty-four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the mornings and
from Glenwood Springs to Carbondale in the afternoons. All inspections must be
called in by 3:30 p.m. the day before. Failure to give twenty-four (24) hour notice for
inspections will delay your inspection one (1) day. Inspections are to be called in to
384-5003.
Yes ✓ No
30. Are you aware that requesting inspections on work that is not ready or not accessible will
result in a $47re-inpsection fee?
Yes No
31. Are you aware that you are required to call for all inspections required under the Uniform
Building Code including approval on a final inspection prior to receiving a Certificate of
Occupancy an- occupancy of the building?
Yes l/ No
32. Are you aware that the Permit Application must be signed by the Owner or a written
authority be given for an Agent and that the party responsible for the project must comply
with the Unifo Building Code?
Yes V No
5
33. Are you aware that prior to submittal issuance of a building permit application you are
required to show proof of a driveway access permit or obtain a statement from the Garfield
County Road & Bridge Department stating one is not necessary? You can contact the Road
& Bridge Department at 625-8601.
Yes ✓ No
34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician
and Plumber to perform installations and hookups, unless you as the homeowner are
performing the work? The license number of the person performing the work will be
required at time of applicable inspection.
Yes ✓ No
35. Are you aware, that on the front of the Building Permit Application you will need to fill in
the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal
of a building pe t application? Your attention in this is appreciated.
Yes No
I hereby acknowledge that I have read, understand and answered these questions to the
best of y ; ' ility.
Signa ffe of
__l tiutfu I? t
Phone: 770-3o9-36..24
Date
/110/0.3
(days); 970 — %.3 — 573 (evenings)
Project Name: �A /3N4 LL GE
Project Address: 1870 COuArr'1 /2A9 1o3/ t% dtrArDi cb 8(C Z3
Notes:
If you have answered "No" on any of the questions, you may be required to provide this information
at the request of the Building Official prior to beginning the plan review process. Delays in issuing
the permit are to be expected. Work may not proceed without the issuance of a permit. If it is
determined by the Building Official that additional information is necessary to review the application
and plans to determine minimum compliance with the adopted codes, the application may be placed
behind more recent applications for building permits in the review process and not reviewed until
required information has been provided and the application rotates again to first position for review,
delay in issuance of the permit or delay in proceeding with construction.
bpminreq
04/2003
6
Page I of I
Tim H Iliday
From: Jack Gausnell Ijgausnell@wsiwebsitestudio.com]
Sent: Monday, May 16, 2005 9:14 AM
To: Tim Holliday
Subject: Building Permit 8970 Extension
Dear Tim,
We received your letter last week regarding the possible expiration of our building permit number 8970. Last year
we filed for a building permit for the construction of a detached garage with an ADU on the second floor. We
finished the construction of the building, but have not finished the ADU interior on the second floor which will
include plumbing, wiring, drywall, and fixtures. Our home and newly constructed garage is situated a considerable
distance from our neighbors and is not even visible from our road since they are situated away from the road on a
forty-five acre lot. The exterior of the building Is complete. We are in the process of accumulating enough money
to finish the project which we estimate will be this fall. Therefore, we would like to extend the term of the existing
building permit until the end of this year. Is this possible?
Best regards.
Jack G. Gausnell
Owner/Broker
Roaring Fork Realty
0326 Highway 133
Suite 270A
Roaring Fork Valley, CO 81623
Tel (970) 309 3620
Toll Free (800) 963 7172
Fax (970) 963 4455
jgausnell@roa ringforkrea Ity.com
www.RoaringForkRealty.com
5/16/2005
Date: 5-- 12.-0
To: \ac;C Co,.eamOi
(Rio at 103
Mzs naatr Co 21623
Garfield County
BUILDING do PLANNING DEPARTMENT
Code Compliance Office
sihacicett@aarfield-county. ,our
Dear Permit Holder,
Please refer to your building permit number g9 70 , issued 11/i4f 0 3.
A routine review of our open building permits indicates that we have not received a request for an inspection
on this permit since &-Z3-o1
Please be advised that building permits expire, pa lhri£otm Building Code, section 106.4.4. "Every permit
issued by the building official under the provisions of this code shall expire by limitation and become null
and void if the building or work authorized by such permit is not commenced within 180 days from the date
of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time
atter the work has commenced for a period of 180 days. Before such work can be recommenced, a new
permit shall first be obtained to do so, and the fee therefore shall be one half the amount required for a new
pent for such work, provided no changes have been made or will be made in the original plans and
specifications for such work, and provided further that such suspension or abandonment has not exceeded
one year. In order to renew action on a parcit after expiration, the permittee shall pay a new fall permit fee."
Please contact this office at your very earnest convenience, in writing, to advise us about the status of your
Permitted work
If yon have not responded within thirty days from the receipt of this notice the permit will be dosed
rad a past notation will be placed in the property records at the City Anon office that
indicates that the work permitted was not inspected, b not approved and that the build* or area say
tot be legally occupied.
Thank you for your coopaauona
Sincerely
ratIfollifay
eaarMasi
Building Inspaxots
108 8th Street, Suite 201, Glenwood Springs, Colorado 81601
COUNTY OF GARFIELD - BUILDING DEPARTMENT
CORRECTION NOTICE
108 8th St., Suite 201 Glenwood Springs, Colorado
Phone (970) 945-8212
Job located at IS 7D (7I, /03
Permit No. B JC
1 have this day inspected this structure and these
premises and found the following corrections needed:
t 410 ,P a A Pint/ 5 0if f nn r,C4.a
/1/$101:
At10�&: fern.„-ca4c,,feaC%k—
6P,,;i2e 647 049 U40"4 evit
You are hereby notified that the above correction must be inspected
before covering.
When correction(s) have been made, call for inspection at 970-384-5003.
Date
//-' y-eir
Building Inspector
Phone (970) 945-8212
,20
No 3-9111)
Job Addres
Owner
Assessor's Parcel No 0239 3.;44eco33 7
Date � (f/ its`
BUILDING PERMIT CARD
lSgo CyRio3��((rp.,,
LLA -811m -P1 * 4L1#tLAddress IR 10C it c3c*Lk file -UP hone #•304- 36ajikiLLa
Contractor
Setbacks: Front
Address
RH LH Zoning
INSPECTIo S tp „(o/»'o/ / �7R`)/ _l�r(
+4n� eathe proofing : ._. r,4
Mechanical
Electr ough (State) 1- 71' o f • I w
ectrical Final ( tate) 1
Final& Z b*heckli Co�mpletedy
Certificate Occupancy ba
•/ -CG
Septic System # 375.
' Date 6///05,
Final i' -Z3 Cc/731---
Soils Test
Footing
Foundation
Grout
Underground Plumbing
Rough Plumbing /2-2-0S7'7i-
Framing l Z' 2 rorTli-
Insulation / 7-t'.) ir6
Phone #
Roofing
Drywall /2/6 0570
Gas Piping /2,-2.- -0$7ll-
TES
a
Other ozA
n :sit 1'0
(Continue on uack3b
fowl
'x' 1`cocl4
cy„70 276'
uar -1067
INSPECTION WILL NOT BE MADE UNLESS
" THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date IssuedI -1140°Zoned Area Permit No fi°
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Ins peytor and IMMEDIATELY B COME NULL AND VOID.
' uric mow•
Address or Legal�Description u�
Owner�Y^ss' ve `1
Use
Ah L (,bo\/Q
X03 Cla kr
Contractor r0 N1
Setbacks Front Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
��,//
Footing DilIN' 1-/ k / Yr , -- -C/- - - / :7/
Foundation /- 26_661/+1.'
Underground Plumbing
Insulation , _7 c 7
Rough Plumbing �'L--z.-c t—"j
Drywall -t ,- ,
Chimney & Vent
Electric Final (by State Inspectorial I44'Ji(/
Gas Piping I -, _ z_,,, s-^
Final (pr-(7...9Ce ,tier `l
Electric Rough (By State Inspector)
Septic Final
Framing l 2 - z---f/t—
(To include Roof in place and Windows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
Phone -384-5003
THIS PERMIT IS NOT TRANSFERABLE
109 8th Street County Courthouse Glenwood Springs, Colorado.
APPROVEDDDOANOT DESTROY THIS CARD
Date
PLACED
B CD `UT O WITH CLEAR PLASTIC