Construction Observation Report 09.28.2015
I3EPWORTH-PAWLAK GEOTECHNICAL September 28, 2015 Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81612 {h hors ford silichconstruction.corn) I icruvurtlt•[' itatk Ocotcchnisa}, Int 5020 Cnunty Road 154 Glenut od Springs, Chloral() 31601 i'httnc. 970.945-7959 fax- 970945-54?4 vin til Ifirgety?hrgcotech cnin Job No. 115 066C Subject: Construction Observation and Testing Completion Letter, Proposed Residence, Lot 278, Ironbridge Development, Blue Heron Vista, Garfield County, Colorado Gentlemen: As requested, we are providing a summary of our observation and testing services provided for the above referenced project. The reports of the services requested and performed for the project are attached. We previously conducted a subsoil study for design of foundations at the site and presented our findings in a report dated March 30, 2015, Job No. 1 13 4711. The foundation bearing soils within the building excavation were observed and tested for compaction on May 27 and June 5, 2015 and are suitable for the recommended bearing pressure of 1,500 psf. Perimeter grade beam reinforcement steel was observed on June 11 and the fresh concrete placed for the grade beams was sampled and tested on June 11, 2015. The post -tensioned slab tendons were observed on June 22, the fresh concrete was sampled on June 23 and tensioning of the tendons was observed on July 6, 2015 according to the project specifications. The results of the tendon tensioning were submitted to Fuhrmann & Graf for their approval. Tendon 12 concrete pocket failed and the tendon pull after repair of the pocket was observed on July 20, 2015. We did not observe placement of the rigid foam insulation along the building perimeter, but since the perimeter grade beam has a minimum depth of 36 inches, it provides adequate frost protection rather than by insulation. Based upon inferences drawn from our observation and testing, as documented by the attached daily field and laboratory reports, it is our professional opinion that the Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989 Silich Construction Inc. September 28, 2015 Page 2 referenced construction has achieved the specified conditions. Please recognize that construction observation and testing are sampling functions that involve direct observation and testing of very Limited amount of the overall work to evaluate the construction compliance. If you have any questions or need further assistance, please call our office. Sincerely, HEPWORTH — PAWLAK GEOTCHNICAL, INC. Steven L. Pawlak, P. SLP/ksw Attachments: Observation & Testing Reports: 5/27/2015 through 7/20/15 cc: Silich Construction —John Silich (iohn@silichconstruction.com) Silich Construction - Eric Lintjer (elintier@silichhomes.com) Job Na. 115 0660 G&ech HEPWORTH-PAWLAK GEOTECHNICAL 6020 County Road 164 Glanwaod Springs, Colorado 81601 Pion: 970.446-7888 Fax: 970-9464464 amehrendschaza Earthwork Compaction Testing Report Client: Sikh Construction inc. Job No.: 115 066C Day: Wednesday Attn: Hayden Horsford Date: 5/27/15 303 AABC, Suite J Page: 1 of 1 Aspen, Colorado 81611 Project: Polorado Residence, Lot 278, Ironbridge Development, Blue Heron Vista, Garfield County, Weather. Cloudy, calm, rain overnight Temperature: ° at am Earthwork Contractor: Equipment Used: Not observed Description of Earthwork Building slab subgrade was tested for compaction of fill soils. Results were Tested: judged to be acceptable. Sample(s) Obtained: One large bulk composite sample was obtained from the test locations and submitted to our lab for classification and standard Proctor compaction testing. Results are attached and confirm that the field compaction test results were acceptable. Verbal Communication: None Placement and Compaction Procedure: Not observed by HP Geotech. Lift Thickness: Compactor(s) Used: Max. Rock Size: Moisture Conditioning: Number of Passes: Nuclear Gauge Test No. Location PT Slab Sub rade g Depth or Elev. Field Dry Density (PO Field Moisture Content % Field Comp. (%) Min. Comp. Req. (%) Proctor Lab No. 1 10' W of E building comer slab subgrade 116.5 15.6 102 98 091-15 —2 9' N of S building corner slab subgrade 116.0 12.3 102 98 091-15 3 12' E of W building comer slab subgrade 114.8 13.3 101 98 091-15 - 4 12' S of N building corner slab subgrade, 116.9 14.4 103 98 _ 091-15 Procter Sample Reference• . Lab No. Method I Description Max. Dry Dens. (%) 114.0 Opt. Moist. (%) 12.8 091.15 ASTM D 698 Sandy Silt MIS REPORT1WS NTS OPINIONS AS A RESULT Of OUR OOSERVATIONSO0 hu. PLACEMENT WE HAVE RELIED ON THE CONTRACT-hR TO CONTINUE APPLYING THE R COLOAg msn ..•++.-nr �ivc vrunr J fW �xur5rl,liE ii? FIU. UVfIING TFIE T ,%5 WHEN OUR OBSERVER IS NOT OBSERYWO OPERATIONS THE NUCLE DEHSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WnH ASTM O 6 e Distribution: Aspen Signature Homes of Ironbridge, LLC - Uwyd Ecclestone «pcclestoneepb1hii.ngt) Stitch Construction — Hayden Hansford(hhorsford@ylliehconstructign,com) Stitch Construction —John Stitch gohnes1Uchconstructfon,com} Stitch Homes —Jodi Thimsen doditeriilichhomes.com) TJW/ Thomas J. Westhoff, CET Steven L Pawlak, P.E. Field Technician Reviewed By Laboratory Proctor Compaction Test Report 115 5 Km a. allism al F 114MI Mi' II III � I ■Nr ■ a • .. • • 1125 c m v L d 111 - rI 1 109 5 1 ZAV for _._.� Sp.G, = 10B 1 1 2.50 9 10.5 12 13 5 15 16.5 18 Water content, % Test specification ASTM D 698-00a Method B Standard Elevl Classification Nat. % > % < Depth USCS AASHTO Moist. Sp -G. LL PI 318 in. No.200 ML A-4(0) 21 1'.P 5.0 70 TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 1 14.0 pcf Optimum moisture - 12.8 % sandy Silt Project No. 115066C Client: Silich Construction Inc. Project: Let 278, Ironbridge Development, Blue Heron Vista, Garfield County, Colorado o Location: Slab Subgrade Sample Number: 091-15 Remarks: See Figure IA for classification results Hepworth-Pawlak Geotechnical, inc. Glenwood Springs, Colorado Figure 1 Tested By: KO Checked By: SLP.. 1 PERCENT FINER Particle Size Distribution Report 5 5 0 00 o n e7, l' .: R N 1 a0 s f a >7 a a ]fl sn SPEC." PERCENT PASS? (X=NO) 1 1 1 1 1 I —_1 •I I 1• 1 I .375 •I • i I I s 1 I l i E 1 1 1 1 1 1 1 1 1 93 #16 92 #30 91 e0 4 1<50 88 'I 1 1 1 1 1 1 1 1 1 1 1 I 1 70 I 1 _I_ •' 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 I I 1 1 I I r1f- I I 1 1 1 1 1 11 1 70 10 I 1 1 I ; 1 l 1 1 i 1 1 1 1 I 1 i i i i 1 1 i 50 I I 1 1 1 1 1 1 1 1 1 1 I 1 I F 1 1 I -+-I-= 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1—. 1 1 t 1 1 1 1 1 1 1 1 1 1 1 1 to 10 I I I I 1 1 I I 1 I I I 1 I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I— 1 I I 1___1 ! I 1 1 I 1 1 t t I I 1 1 1 1 za — 10 -- I 1 1 1 1 1 1 1 I 1 1 1 I I 1 1 t -t 1 1 1 1 1 1 1 1 0 1 ! 1 �I I 1--1 I 1 I E t. 1 1 I !! 1 1 I ; ! I 1 1 1 1 1 ;; 1 1 1 1 1 1 - GRAIN SIZE - mm. 01 001 0.001 X +3' X Gravel X Sand X Fines 0 Coarse I Fine 3 3 Coarse 1 Medium 1 Fine Silt 1 3 1 20 70 Clay SIEVE SIZE PERCENT FINER SPEC." PERCENT PASS? (X=NO) 1.5 100 .75 97 .375 95 #4 94 !18 93 #16 92 #30 91 1<50 88 11100 81 11200 70 (no specification provided) Location: Slab Subgrade Sample Number. 091-15 Material Description Sandy Silt Atterberg Limits PL= NP LL= 21 PI= NP Coefficients 085= 0.2229 060= 030= 015= Cu= Cc= Classification USCS= MI.. AASHTO= A-4(0) Remarks See Figure I for standard Proctor compaction results. D50= D10= Date: 5/27/2015 Hepworth-Pawlak Geotechnical, Inc. Glenwood Springs, Colorado Client: Silich Construction Inc. Project: Lot 278, lronbridge Development, Blue Heron Vista, Garfield County, Colorado Project No: I I5066C - Figure i A Tested By: KO Checked By: SLP P 5020 County Road 154 GeeteCh Glenwood Springs, Colorado 81801 Phone: U0448-7988 HEPWORTH-PAWLAK GEOTECHNICAL Fax. 870-945-84 4 Earthwork Compaction Testing Report Client: Silich Construction Inc. Job No.: 116 066C Day: Friday Attn: Hayden Horsford Date: 615115 303 AABC, Suite J Page: 1 of 1 Aspen, Colorado 81611 Proposed Residence, Lot 278, Ironbridge Development, Blue Heron Vista, Garfield County, Colorado Project: Weather. Overcast, light wind, dry Temperature: 71° at 3:00 pm Earthwork Contractor. Equipment Used: Not observed Description of Earthwork Bottom of grade beam trenches were tested for compaction of existing fill Tested: soils. Results were acceptable. Verbal Communication: None Placement and Compaction Procedure: Not observed by HP Geotech. Lift Thickness: Compactor(s) Used: Max. Rock Size: Moisture Conditioning: Number of Passes: Nuclear Gauge !Moisture/Density Test Results Test No. • Location Bottom of Grade Beam Trenches Depth or Elev. Field Dry Density (PC} Field Moisture ContentReq. aha Field Comp. (/a) Min. Comp. eh) Proctor Lab No. 1 15' S of N building corner bottom of grade beam 116.0 9.8 102 98 091-15 2 22' S of N building corner bottom of grade beam 112.7 10.0 99 98 091-15 3 20' E of W building corner bottom of grade beam 114.5 10.9 100 98 091-15 4 20' E, 10' S of W building corner bottom of grade beam100 113.5 10.6 98 091-15 Lab No. Method Description 091-15 ASTM D £98 Sand Silt Max. Dry Dens. (%) 114.0 Opt. Moist. (%) 12.8 THIS REPORT PRESENTS OPAMONS AS A REtuLT OF OUR OBSERVATIONSOF FILL PLACEIAENT HAVE RELIED ON THE CONTRACTOR TO CONTINUE APPLYING THE AECOMMENOED COMPACTNE EFFORT AND MOISTURE TO ALL DURING THE TIMES WHEN OUR OBSERVER IS NOT DESERVING OPERATIONS THE NUCLEAR DENSOIIIETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM D5930 Distribution: Aspen Signature Homes of Ironbridge, LLC - Uwyd Ecclestone fleccIostoneftblhfl.nel) Silich Construction — Hayden Horsford (hborsfordesilichcons CH4n.com) Stitch Construction — John Sikh (Johni9lsiikhconebuction.conT) Stitch Homes—Jodi'rhimsen (ioditilsillchhomes.cem) TJW/ Thomas J. Westhoff, CET Steven L. Pawtak, P.E. Field Technician Reviewed By H H Gedtech 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 Fax: 970-945-8454 HEPWORTH -PAWLAK GEOTECHNICAL hpgeo@hpgeotech.com CONCRETE TEST REPORT Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 Job No. 115 066C Date Cast: 06-11-15 Sheet: 1 of 1 Project: Proposed Residence, Lot 278, Ironbridge Development, Blue Heron Vista, Garfield County, Colorado Placement Location: Grade Beams Supplier: Casey Concrete Truck No: 6388 Ticket No: 33304718 Mix Design: 37010550 Method of Placement Pump Time Sampled: Air Temp: Concrete Temp: Water Added: Communication: Time Batched: Time Arrived: Time Placed: 12:07 pm Wet Unit Wt: 60° Slump: 70° Air Content: 7 gallons per Contractor 11:40 am 11:59 am 12:03 pm Sample Point: 140.8 pcf 41/2 inches 5.4 % Load Size (Yds): Yds Delivered: Yds Ordered: Truck Discharge 10 10 50 The Contractor and Supplier were informed of our field test results. Time Cylinders Cast: 12:17 pm Initial Cure Time On Site: 1 day Field Storage: Water Bath Date in Lab: 06-12-15 Cylinder Temperature at Pick Up: 82° Min/Max: 55°/820 Compressive Strength Data 2015 Lab Number Age Days Date Load lbs. Diameter in. Area int Compressive Strength (psi) 28 Day Avg. (psi) 358A 7 06-18-15 67,500 4.01 12.63 5340 6720 358B 28 07-09-15 83,300 4.01 12.63 6600 358C 28 07-09-15 86,200 4.01 12.63 6830 358D Hold/56 Discarded Specified Strength for Structure: 4500 psi at 28 days Specified Strength for Mix: 4500 psi at 28 days Notes: Distribution: Aspen Signature Homes of ironbridge, LLC - Llwyd Ecclestone {Iecclestoneta pblhfl.net) Sllich Construction — Hayden Horsford(hhorsford(d)silichconstruction.com) Silich Construction — John Silich (IohnCdtsilichconstruction.com) Silich Construction — Jodi Thlrnsen (lodifEbsilichconstruction.com) Casey Concrete — Shawn Vondette (svondetteews-concrete.com) Paul Weiser Field Technician Thomas J. Westhoff, CET Reviewed By G&ech HEPWORTH- PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945,7988 Fax: 970-245-8454 hoaeolt9haaeotech.com REINFORCEMENT STEEL INSPECTION REPORT Client: Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 Job No.: 115 066C Day: Thursday Date: 6/11/15 Page: 1 of 1 Project: Proposed Residence, Lot 278, Ironbridge Development, Blue Heron Vista, Garfield County, Colorado Area of Inspection: PT Trenches, grade beams Reference Documents Structural Plans, Sheets F1.1, FD1 Used: Inspection Notes: Inspection Status: 0 Preliminary © Final Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. 0 Exceptions Noted: Verbal Communication: Distribution: Aspen Signature Homes of Ironbridge, LLC - Llwyd Ecclestone pocdloatoneepblhfi.net) Silich Construction — Hayden Horsford thhorsfordifihstlidiconstruction.corni Silich Construction —John Silich flohnl ilichconstruction.con) Silich Construction — Jodi Thlmsen (odiesilichconstruction.com) lksw Paul Weiser Steven L. Pawlak, P.E. Field Technician Reviewed By G&ech HEPWORTH-PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 Fax: 970.945.8454 hogeoehpaeQtech.com REINFORCEMENT STEEL INSPECTION REPORT Client SiItch Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 Job No.: 115 066C Day: Monday Date: 6122/15 Page: 1 of 1 Projects Proposed Residence, Lot 278, Ironbridge Development, Blue Heron Vista, Garfield County, Colorado Area of Inspection: Post-Tenslon Slab Reference Documents County Approved Drawings dated 3/24/15, Sheets F1.0 & FD.1 Used: Inspection Notes: High subgrade near plumbing area was reported to Hayden Horsford with Silich and was corrected prior to concrete placement. Inspection Status: ❑ Preliminary El Final © Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents, 0 Exceptions Noted: Verbal Hayden Horsford with Silich was informed of our inspection results. Communication: Distribution: Aspen Signature Homes of Ironbridge, LLC - Uwyd Ecclestone Oecclestonepblhil.netj Sllich Construction — Hayden Horsford(hhorsford(i$sliichconsbvction,com) Silich Construction—John Silich (johnes111chconstruction.com) Silich Construction —Jodi Thimsen floditlFizltichconstructlon.coin? TJWF Thomas J. Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By 1 Gtech 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945.7988 Fax: 970-945-8454 HEPWORTH-PAWLAK GEOTECHNICAL hpgeo@hpgootech.com CONCRETE TEST REPORT Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 Job No. 115 068C Date Cast: 06-23-15 Sheet: 1 of 1 Project: Proposed Residence, Lot 278, Ironbridge Development, Blue Heron Vista, Garfield County, Colorado Placement Location: Post -Tension Slab Supplier. United Truck No: 6384 Ticket No: 33304801 Time Batched: Time Arrived: Time Placed: Mix Design: 37010550 Class D State Method of Placement: Pump Time Sampled: Air Temp: Concrete Temp: Water Added: 8:08 am Wet Unit Wt: 56° Slump: 77° Air Content: 10 gallons per Contractor 7:30 am 8:00 am 8:05 am Sample Point: 140.3 pcf 5.0 in. 6.2 Load Size (Yds): Yds Delivered: Yds Ordered: 10 10 40 Truck Discharge Specifications: Slump: 6 ± 1 inches Air Content: 5 to 8 Communication: The Contractor and Supplier were informed of our field test results. Time Cylinders Cast: 8:15 am Initial Cure Time On Site: 1 day Field Storage: Insulated Cure Box in Water Bath Date in Lab: 06-24-15 Cylinder Temperature at Pick Up: 73° Min/Max: 721910 Compressive Strength Data 2015 Lab Number Age Days Date Load lbs. Diameter in. Area in2 Compressive Strength (psi) 28 Da Y Avg. (psi) 402A 6 06-29-15 50,000 4.01 12.63 3960 5600 402B 28 07-21-15 72,300 4.01 12.63 5720 402C 28 07-21-15 68,800 4.01 12.63 5450 402D 28 07-21-15 71,000 4.01 r 12.63 5620 pecmea Strength for structure: 4500 psi at 28 days Specified Strength for Mix: 4500 psi at 28 days Notes: Distribution: Aspen Signature Homes of Ironbridge, LLC - Llwyd Ecclestone itecclostonbihfi.netj Silich Construction — Hayden Horsford thhorsfordesilichconstluction.com} Silich Construction — John Silich (iohr flIchcanstructian.com) Stitch Construction — Jodi Thimsen jiodfetsiiichconstruc ion.com) United — Holly Martin (Holiv.martineoldsa rtaterials.com) United - Misty Grosse (Mlstv.Mwngunited-oi.corn) Tom Westhoff, CET David A. Young, P.E. Field Technician Reviewed By HEPWORTH - PAWLAK GEOTECHN1CAL POST TENSIONING FIELD REPORT Client: Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 5020 County Road 154 Glenwood Springs, CO 81501 Phone: 970-945-7988 Fax: 970-945-8454 hpgeo@hpgeotech.com Job No.: 115 066C Day: Monday Date: 7/6/15 Page: 1 of 2 Project: Proposed Residence, Lot 278, Ironbridge Development, Blue Heron Vista, Garfield County, Colorado Weather Cloudy, Tight wind, rain overnight Temperature: 62°F at 8:15 am Field Notes: Cable tensioning was performed using Jack #539 by Gary Anderson & crew with K&G Rebar, starting at the slab northwest corner and progressing to the slab southeast corner. Tendon No. Location Jacking Force (kips) - Gauge Reading (FSS Length (ft.) Calculated Elongation (in.) Measured Elongation (in.) Min. Max A NW Corner 27 5400 46% 31/4 4 31/2 B West Side 27 5400 46% 31/4 4 3% C West Side 27 5400 46% 31/4 4 3% D West Side 27 5400 46% 3'/ 4 3Y4 E West Side 27 5400 46%8 3'/. 4 35/8 F West Side 27 5400 46%8 3'/ 4 3% G West Side 27 5400 47% 3% 4% 3% H West Side 27 5400 47% 3' 4%e 4 I West Side 27 5400 511/2 3% 41/2 3% J West Side 27 5400 511 3% 41/2 41/5 K West Side 27 5400 501/2 3% 4% 3'/e L West Side 27 5400 511/2 3% 41/2 4% M SW Comer 27 5400 5112 35/ 41/2 4 Distribu ;on Aspen Signature Homes of Ironbridge, LLC - Liwyd Ecclestone (lecclestone{a pblhfl.net) Sikh Construction — Hayden Horsford [hhorsfordesilichconstruction.corn) Silich Construction — John Silich (lohnesilichconstruction.com) Silich Construction — Jodi Thimsen (iodiesilichconstruction.com) TAT Thomas J. Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By Gtech HEPWORTH - PAWLAK GEOTECHNICAL POST TENSIONING FIELD REPORT Client: Silich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 Project: Weather: Field Notes: 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 Fax: 970-945-8454 hpgeo@hpgeotech.com Job No.: 115 066C Day° Date: Page: Monday 716115 2 of 2 Proposed Residence, Lot 278, Ironbridge Development, Blue Heron Vista, Garfield County, Colorado Cloudy, light wind, rain overnight Temperature: 62°F at 8:15 am *The fixed end of Tendon #12 moved an estimated Y4 to % inch when initially tensioned, breaking the concrete surface and exposing the end anchor, apparently due to an air void in the concrete next to the fixed end. The cable was left at a reduced tension of 3600 psi gauge pressure (22 kips force). Hayden Horsford with Silich was informed. We understand from discussions that the concrete at the anchored end will be repaired and the Engineer will be contacted for direction regarding re -tensioning of the cable. Photo of Tendon #12 exposed fixed end is attached. Tendon No.Force Location Jacking (kips) Gauge Reading (psi) Length Cu Calculated Elongation (in.) Measured Elon aeon (in.) 9. Min. Max. 1 SW Comer 27 5400 40 2% 3'/2 31/4 2 South Side 27 5400 40 2% 3'/2 3% _ 3 South Side 27 5400 40 2% 3/ 3% 4 South Side 27 5400 40 2% 3/ 3'/ . 5 South Side 27 5400 40 2% 3'/ 3% 6 South Side 27 5400 40 2h 3% 3% 7 South Side 27 5400 40 2% 3% 3 8 South Side 27 5400 40 2% 31/2 3'/s 9 South Side 27 5400 40 2% 3% 3% 10 South Side 27 5400 40 2% 3% 3 11 South Side 27 5400 40 2% 3%2 3% *12 South Side 22 3600 40 2% 31/2 2% 13 South Side 27 _ 5400 40 2% 3%2 3/ 14 South Side 27 5400 40 2% 3% 3% 15 SE Comer 27 5400 11% '/ 1+ 3/ Distribution. Aspen Signature Homes of Ironbridge, LLC - Llwyd Ecclestone tlecclestonethobihf.netl Silich Construction — Hayden Horsford(hhorsfordeelllchconatruc1lon.com) Stitch Construction — John Silich jiohnas1IIchconstructiort.EOm) Silich Construction — Jodi Thlmsen (bdiegpichconsiruction,com) TJWI Thomas J. Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By HEPWORTH-PAWLAK GEOTECHNICAL POST TENSIONING FIELD REPORT Client: Siiich Construction Inc. Attn: Hayden Horsford 303 AABC, Suite J Aspen, Colorado 81611 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 Fax: 970-945-8454 hpgeo@hpgeotech.com Job No.: 115 066C Day: Monday Date: 7/20(15 Page: 1 of 1 Project: Proposed Residence, Lot 278, Ironbridge Development, Blue Heron Vista, Garfield County, Colorado Weather: Clear, Calm, Dry Temperature: 57°F at 8:05 am Field Notes: Tendon #12 had reportedly been de -stressed and the fixed end was repaired. The cable was re -tensioned successfully with no apparent movement at the fixed end. Tendon No. Location Jacking Force (kips) Gauge Reading (psi) Length (ft.) Calculated E ongation (in.) Measured Elongation (in.) Min. Max. 12 South Side 27 5400 40 2'18 3V2 3.0 Distribution: Aspen Signature Homes of Ironbridge, LLC - Llwyd Ecclestone (Iecciestone(a7obihf.net) Sillch Construction — Hayden Horsford(hhorsford{tsilichconstruction.com) Stitch Construction — John Stitch (john ansiiichconstruction.com) Stitch Construction — Jodl Thimsen (todiailsitichconstruction.com) TJWI Thomas J. Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By