HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-9-15-3904
EnCana/Solvay Chemicals, Inc
Pump House Roof Replacement
Parachute, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS.
2) IF APPLICABLE, ELECTRICAL FINAL APPROVAL REQUIRED FOR COMPLETION INSPECTION.
3) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
4) CONCRETE REINFORCEMENT INSPECTION REQUIRED.
5) FINAL/COMPLETION INSPECTION REQUIRED.