Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-9-15-3904 EnCana/Solvay Chemicals, Inc Pump House Roof Replacement Parachute, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS. 2) IF APPLICABLE, ELECTRICAL FINAL APPROVAL REQUIRED FOR COMPLETION INSPECTION. 3) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 4) CONCRETE REINFORCEMENT INSPECTION REQUIRED. 5) FINAL/COMPLETION INSPECTION REQUIRED.