Loading...
HomeMy WebLinkAboutApplication- PermitJob Address Garfield County Building, Sanitation, & Planning Department 108 8th Street, Suite #201 Glenwood Springs, Co. 81601 Office- 945-8212 Inspection Line- 384-5003 NO. 8890 Nature of Work Building Permit prttlSt — (:-.)(4 — `V — at..., Use of Building 4 €d Q fililc$ n Owner --MP 1 , Orl&j Contractor / Amount of Permit $ (4 l TIl'' • S( • GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8" Street, Suite 201, Glenwood Springs, CO 81601 Phone: 970-945-8212 / Fac: 970-384-3470 / Inspection Line: 970-384-5003 Parcel/Schedule No: 9.1109 o3 003 Permit No: cSZS 9 l:::1 �L AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICAp l A OWNER. CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30,28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT W THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. GarfomO03 aI Y ACKNOWLEDGE THAT 1 HAVE READ AND UNDERITI STAND THE AGREEMENT ABOVE(INAL): Th Job Address: `�. (. ( C L l / I) • CA 1--E3/: ti (NO l F ' ( / c 1 Lot No: Block No: Suhd. / Exemption: 2 Owner: ` _ !-�r�, l(I(fki Address_ - /'i/. T' t(" /` ('' 1(.((!r,-11ll,Ii// Ph: %f . 1(/J Wk Ph: 3 Contractor: i. I,_''. ire Address: Ph: Lic. No. 4 Architect/Engineer: Address: Ph: Lic. No. 5 Sq. Ft. of Building:/ Sq. Ft. of Lot: Height: No. of Floors: 6 Use of Building: Y m C/fa (141616.6 ` kr/IC/fa 7 Describe Work: ', 8 Class of Work: a/New o Alteration o Remove o Addition o Move 9 10 Garage: o Single ❑ Double Carport: o Single ❑ Double ❑ Driveway Permit On -Site Sewage Disposal Site Plan I • .-I u (' (. / 6 L r / re. I_ (Septic) ! i . . / ,. 11 Valuation of Work: S Adjusted Valuations: S Pit 003 -C,o 12 Special Conditions: p� k Lt- (Mt4.. 1-. °1/4- Witiaj ,".* # $g9 NOTICE A SEPARATE ELECTRICAL PERMIT 15 REQUIRED AND MUST BE ISSUED BY THE STATE OF COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS,OR, IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. 1 HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS GOV RNING THIS TYPE OF WORK WILL BE COMPLETED WITHIN W HER SPECIFIED HEREIN OR NOT. THE GRANTING OF A P)<RM ES NIT PRESUME TO GIVE AUTHORITY TO VIOLATz ORCCf/tt7NNC : L HE PROVISIONS OF ANY OTHER STATE OR LOCALy�,YW RE•U A N s sN OR THE PERFORMANCE OF CON RUC T . I iCif _ 3 Plan Check Fee: /4 3.31 Permit Fee: n!'/26— !Permit Total Fee: Dated Issued: / t//_ 4 SIO 4 OCC Group: CO L Ty e: N / ' J , ` ti �/ /�( Zoning: Setbacks: Manu. Home: ISDS No. & Fee: �+yra.; R i . I,�,r�//♦ Mt �',I• 9...03 i /97774 rig/ B , D ' a N 'APPROVA ,ATE APPROVAL .ICPT. IylE 2 �L AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICAp l A OWNER. CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT. IN CONSIDERATION OF THE ISSSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30,28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT W THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPILED WITH IN THE LCOATION, ERECTION, CONSTRUCTION, AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABLITIES BY GARFIEID COUNTY FOR ERRORS, OMISSIONS OR DISCREPENCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICIALLY WITH THE ARTICTECT, DESIGNER, BUILDER, AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. GarfomO03 aI Y ACKNOWLEDGE THAT 1 HAVE READ AND UNDERITI STAND THE AGREEMENT ABOVE(INAL): Th The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non- absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with washbowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1997 UBC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOTOCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISE UNTIL ABOVE CONDITIONS ARE MET. 1 understand ..d agree to abide by the above conditions for occu anc u d the issuance of' a Certificaje of a •oupan.s, for dwelling under building permi#` `� eat Date i Signature, BpcontO82002 PLAN REVIEW CHECKLIST Applicant IIrrC4(t1-L. Date 9•24 .0 Building 1,1 ' 4 Engineered Foundation "riveway Permit ._,...{everic& Site Plan 14,4 Septic Permit and Setbacks ..✓/Grade/Topography 30% Attach Residential Plan Review List /Minimum Application Questionnaire ubdivision Plat Notes Ps . Fire Department Review ✓ Valuation Determination/Fees ✓Red Line Plans/Stamps/Sticker 4,4 -Attach Conditions Application Signed Plan Reviewer To Sign Application �harceule No. -442,103 40# Snowload Letter- Manf. Hms. GENERAL NOTES: Th: +ig= X4,040 Planning/Zoning Property Line tbacks 30ft Stream setbacks Flood PI Buildi ' g Height Z g Sign -off R. ad Impact Fees OA/DRC Approval Grade/Topography 40% Planning Issues Subdivision Plat Notes Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re -bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house - rap, (which is required), siding or any approved building material. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, an 80 M.P.H. windshear, wind exposure B, windload of 15 pounds per square foot, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 1997 UBC, UMC and 1997 UPC. 1. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each comer of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. NOTE: 106.3.1 (7.) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes I 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building permit on is located on a comer lot. Special setbacks do Apply. Yes 3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent pr9Perties), streams or water courses? Yes 2 4. Does the site plan indicate the location and direction of the County or private road accessing the property Yes 5. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? / Yes 6. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the c ances required between wood and earth? Yes 7. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces's and/soffits? Yes 1/ 8. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads andvri 6loads? Yes 9. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction Yes 10. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes 1/ 11. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes V 12. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing (undjsturbed) grade contours? Yes 1/ 13. Does the plan include any stove or zero earance fireplace planned for installation including make and model and Colorado Ph II certifications or phase 11 EPA certification? Yes No 3 14. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes No 15. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping r ms and/or basements comply with the requirements of the Uniform Building Code Yes l No 16. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes V No 17. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No 18. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No 19. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? / - Yes 20. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? If you do not have written permission from the association, do you understand that the plan check fee will not be refunded should the architectural committee deny or reject your building plans? Yes t % No 21. Will this be the only residential structure on the parcel? Yes No If no -Explain: 22. Have two (2) 96mplete sets of construction drawings been submitted with the application? Yes 23. Do you understand that the minimum dimensions a home can be on a lot is 20ft.wide and 20ft. long? Yes No 4 24. Have you desi ed or had this plan designed while considering building and other construction de requirements? Yes No 25. Do your plans comply with all zoning rules and regulations in the County related to your properties zon district? Yes No 26. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes l/ No 27. Do you understand that approval for design and/or construction changes are required prior to the application f these changes? Yes No 28. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your building permit? Yes ✓ No 29. Are you aware that twenty-four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale in the afternoons. All inspections must be called in by 3:30 p.m. the day before. Failure to give twenty-four (24) hour notice for inspections will delay your inspection one (1) day. Inspections are to be called in to 384-5003. Yes ✓ No 30. Are you aware that requesting inspections on work that is not ready or not accessible will result in a 547.00 re-inpsection fee? Yes v No 31. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy apd occupancy of the building? Yes / No 32. Are you aware that the Permit Application must be signed by the Owner or a written authority be giv,en for an Agent and that the party responsible for the project must comply with the Unif Building Code? Yes No 5 33. Are you aware that prior to submittal issuance of a building permit application you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Dep a ment at 625-8601. Yes / No 34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at time of applicable inspection. Yes V No 35. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule)dumber for the lot you are applying for this permit on prior to submittal of a building p application? Your attention in this is appreciated. Yes No 1 heieby ackn best of m " ed e that I have read, understand and answered these questions to the Signature of O n - Date � �/ Phone: )!J% / (days); (evenings) /1/I f -cue (4 sl`CQ ►c 2 (& ray t Project Address: �C w la frac Project Project Name: Notes: If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minimum compliance with the adopted codes, the application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. bpminreq 04/2003 6 06/24/2003 02:05 6258627 ROAD AND BRIDGE PAGE 01 Garfield County Garfield County Road and Bridge Department June 24, 2003 Mr. Orley Mitchell 0656 CR 340 CO Garfield County Building and Planning Department Dear Mr. Mitchell; The driveway that you have in place is in accordance with the Garfield County Road and Bridge Department's specifications for driveways and you do not need a permit for this driveway. If you have any questions or problems, please feel free to contact me. erely. Mall District Foretnan Garfield County Road and Bridge Department 0067 County Rand 332 P.O. Ike 426 Mt, CO 31630 Pbin: 970423.0601 For 970-as.06Z7 No. C7 Rc Assessor's Parcel No.O b1 -D34150-0 01 Date 10-3-03 BUILD ERMIT CARD Job A res �r 3L10Owne Address 1 Contractor 7T %D 1 Address Setbacks: Front Rear .l ro-91-o3 Foundation JO -91-o3 Soils Test Footing Grout Underground Plumbing Rough Plujibinng Nffr Framing O' :2( 7' ^o 1 Insulation q- /0 -0 41/e1-71 Roofing A Drywall 7 ' 1 t „VAL- Gas Piping _4/gi Phon Phone RH LH Zoning INSPECTIONS NOTES Weatherproofing Mechanical 3-2-4751A Electrical Rough (State) Electrical Fintate) /D-�'0'( a Fin��hecklist Completed? Certificate Occupancy # Date Septic System # Date Final Other (continue on back) INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO Date IssuedlL . �.a.....Zoned Area Permit No.. / AGREEM ENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspecto and IMMEDIATELY BECOME NULL AND VOID. Use / fs j 4fib jj Setbacks rout " Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing (1>'/4t 03 /m Foundation (Q-2.1-Ok.yy`_ Underground Plumbing �� Insulation q–J0 -0/ Rough Plumbing Ai�. Drywall t-'_i6�B Chimney & Vent A/t Electric Final (by State Inspector 4)2 r,,, Gas Piping _ _— Final Io _ 0 t/ ArtL_ Electric Rough (By State Inspector) $_a g Septic Final A./4 - Framing e-? 7-09'/�i,c– (To include Roof in place and Windows and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. Phone 384-5003 THIS PERMIT IS NOT TRANSFERABLE 109 8th Street County Courthouse Glenwood Springs, Colorado. APP ' • VEDDO NOT DESTROY THIS CARD Date ED OUTSID - 1 VER WITH CLEAR PLASTIC