Loading...
HomeMy WebLinkAboutApplicationGarfield County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-county.com TYPE OF CONSTRUCTION iI Commercial/Multi-Family ❑ Manufactured Home (Single or Multi -Level) ❑ Residential (SF, Duplex orTownhome) INVOLVED PARTIES ❑ Demolition O Reroof coo- ars-R- Property Owner: P id en i nveshYlen45., ( Phone: (170 ) (04_(04 q . Mailing Address: PO L3b ( b Pa.0 Sic % 5 (I7Q yam IlilC�j'"(} 1'te �. (1:0'-‘ Contractor: FbUtlark.A130 ' '` iC 0 - 5-1' Go . r�Phone: (I e o ) ai-i5-71 u Mailing Address: I a-1 CIA' �� e ct 1 l rz^-114. y . g. 1st) 1 Architect: Phone: ( ) Mailing Address: Engineer: Recker' le L., • Phone: (470 ) as7- q aU'R MailingAddress: dt`t3� r Corners tY Vt �t1LG1 T Un� of1 Co 5733 / � � Manufactured Home installer: Phone: (_) Mailing Address: PROJECT NAME ANDrLOCATION Describe Work:-CrUunda l o,n I(' P 0.! Job Address: 1 Q 3 1kd S bJOul , Po...ra Lek- t Co Assessor's Parcel Numbeaq 06P 7 3 / coo (-( Sub. S 9 9A -bp/ Y Lot 11 Block Owner's Valuation of Work: $ TVI 000 Property Size (Sq. Ft. or Acres):S. ((°o 1 o2.54C!"ec Sq. Ft. of Building: F( CO Height: a a, # of Floors: Class of Work: 0 New 0 Alteration 0 Addition KRepair 0 Move/Relocation Garage: 0 Attached 0 Detached Septic: k9 OWTS 0 Community Type of Heat: 0 Natural Gas gPropane 0 Electric ❑ Other Driveway Permit: 0 Exempt 0 Permit #: NOTICE Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION I hereby certify that i have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure{s) and facilities detailed on the submittals reviewed by the Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. 1 further acknowledge that the issuance of the Budding Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required informaSion which is correct and accurate to the best of my knowledge. �47Q1 w / Property Owner Print and Sign Date OFFICIAL USE ONLY Special Conditions: Adjusted Valuation: //44 oo , Plan Check Fee: .5.'.2. 79 Permit Fee: �j 5 L Z ' / Manu home Fee: Mist Fees: ......--^ Total Fees: 99 5:54 Fees Paid: 351. Balance Due: Cgd-IC BP No: OWTS No: FLCD"IlD Setbacks: OCC Group: Zg Const Type: -Zig Zoning: BUILDING / PLANNING DIVISION : Signed d -j /0 d Approval Date pa. 352141, ✓�ting4,q�zz��s Garfield County �'•4> Il 1 ZoniJ1ian Review Checklist Permit Number: /jeep 74_13 _ Engineered Foundation NSA Driveway Permit Surveyed Site Plan Septic Permit and Setbacks Grade/ Topography 30% Attach Residential Plan Review List Subdivision Plat Notes Fire Department Review Valuation Determination/ Fees Red Line Plans/ Stamps/ Sticker Attach Conditions Application Signed f Plan Reviewer to Sign Application Parcel/ Schedule No. A// Nle Soils Report 40# Snowload Letter — Manu. Homes Planning/ Zoning Property Line Setbacks 30 ft. Stream Setbacks Flood Plain Building Height Zoning Sign -Off Road Impact Fees Grade/ Topography 40% Planning Issues Subdivision Plat General Comments: