Loading...
HomeMy WebLinkAbout5.0 Eastbank Sketch Plan Presentation PC 4-22-09Eastbank Sketch Plan Garfield County Planning Commission April 22, 2009 PROJECT INFORMATION Owner:Eastbank, LLC Representative:Meritage Development Group LLC Location:South of Glenwood Springs, between Highway 82 and Roaring Fork River north of Hardwick Bridge/CR 109 Property Size: 110 acres Current Zoning:Rural Water / Sanitation:Roaring Fork Water and Sanitation Access:CR 154 Proposal:Sketch Plan for 247 Residential Units, 90,000 square feet of Commercial, School Site, Open Space/Recreation Comprehensive Plan:Residential Medium Density –6 to <10 acres/du Vicinity Map Zoning Map Aerial View Hwy 82 / CR 154 Signalized Intersection Orrison Distributing Westbank Ranch / Westbank Mesa Gravel Mining Mid 80’s to Mid 90’s SUP AREA Site Photos Proposed Site Plan School Site 18 acres Sports Fields 14 acres Neighborhood Commercial 9 acres Estate Lots 32 acres Mixed Residential 37 acres Land Use Summary Residential Units/Lots Size (Acres)Parking Provided Single Family -Estate 16 32 Per County Code Mixed Residential Single Family 77 18.5 Per County Code Duplex/Townhome 154 18.5 Per County Code Total 247 69 Floor Area (sq. ft.)Size (Acres)Parking Provided Commercial 90,000 9 Per County Code (4/1000 sf) Public/Quasi-Public TBD 18 Per County Code Open Space/Common Area TBD 14 Per County Code Total TBD 41 Comprehensive Plan Analysis Residential Medium Density Comprehensive Plan Issues Residential Medium Density 6 to <10 ac/du Sketch Plan gross residential density .45 ac/du and 90,000 square feet neighborhood commercial Affordable Housing Applicant commits to providing 15% affordable housing Transportation Relocation of CR 154 and improvements to intersection at SH82 Commercial Uses 90,000 square feet of ‘neighborhood’ commercial (undefined) Recreation and Open Space 14 acres provided –PUD requires minimum of 25% of site = 27.5 acres Water and Sewer Services Pre-Inclusion Agreement with Roaring Fork Water and Sanitation District Natural Environment River and riparian area protection; geologic studies / mitigation; drainage; protection of bluff Urban Area of Influence Access Proposed CR 154 Existing CR 154 Intersection issues related to stacking distance, number of entrances into site, relocation of CR 154 bisecting commercial area –all of which will inhibit the flow of CR 154 SH82 improvements Relocation / improvement of RFTA trail and Grand Thompson Ditch Internal road system adequate to support proposed uses (including the school site) Traffic Impacts Neighborhood commercial versus magnet commercial School site –bus traffic and peak hour impacts CR114/CR154/SH 82 intersection impacts CR109/CR154 intersection impacts CR 154 / SH82 Intersection CR 154 / CR 109 Intersection CR 154 / CR 114 / SH 82 Water & Sanitation Inclusion into District for service Construction of Improvements –River crossing(s) –Lift Station to pump upstream for treatment Open Space / Recreation Minimum open space in a PUD is 25% resulting in 27.5 acres required to adequately serve proposed development Provision of a fishing easement River and riparian area Open space and recreation is typically transferred to HOA for ownership and maintenance –this won’t be possible for the river/riparian area or the fishing easement 32 acres 16 2-acre sitesEncumbrances Include trails, lift station, water lines, fishing easement , etc Employee Housing Applicant commits to providing 15% of housing (38 of 247 units) as affordable Type / price / location of units unknown Garfield County Housing Authority requests discussion and specific information on the units Geology CTL Thompson, Inc. Geologic Hazard Evaluation CGS comments (received after staff report was completed) Geology Floodplain / Wetlands Additional information will be required at PP to assure that proposed uses occur outside of the floodplain. Army Corps of Engineers Comments School Site Dedication of site to satisfy School Land Dedication requirements? Traffic Impacts Zoning –inclusion into the PUD Recreation fields shared with development –Who will own, construct and maintain? ISSUES 1. Compliance with Comprehensive Plan 2. Access 3. Traffic Impacts 4. Open Space requirements 5. Employee Housing 6. Water and Sanitation 7. Geology 8. Floodplain, wetlands and riparian area 9. School Site