Loading...
HomeMy WebLinkAboutSystem Design1,000 GALLON 2—COMPARTMEN PLASTIC SEPTIC TANK W/ EFFLUENT FILTER 3Sf10H 16100M3B c 10.3' 4.7' TOP OF PIPE = 92.77 34.6' 38.7' CLEANOUT 4" SCHD.40 PVC FF HOUSE = 100.0' 0 2X MIN. LEACH FIELD: ARC 36 CHAMBER INFILTRATOR UNITS (38 TOTAL). TWO (2) TRENCHES W/ 19 UNITS IN EACH TRENCH. A. CALCULATIONS 1. PERCOLATION RATE = 22 MPI AVG. (TIMBERLINE ENGINEERING 10/6/15) 2. DESIGN FLOW = .3 BEDROOMS X 2 PEOPLE/BEDROOM X 75 X 1.5 = 675 GALLONS PER DAY 3 REQUIRED SEPTIC TANK CAPACITY = 675 X 1.25 = 844 GALLONS USE ONE (1) — 1.000—GALLON, TWO—COMPARTMENT SEPTIC TANK 4. ABSORPTION AREA REQUIRED = A = ( 675 / 5) * 22A1/2 = 633 SF 30X REDUCTION FOR TRENCH SYSTEM = 633 " 0.70 = 444 SF 5. ABSORPTION CHAMBER TRENCH INSTALLATION (ARC 36): 444 SF / 14.17 SF PER UNIT = 32 UNITS MIN. REQUIRED. 38 UNITS PROVIDED. DRAWING 1� SEPTIC SYSTEM AS -BUILT DATE J HULTQUIST RESIDENCE TBD 245 Road GARFIELD COUNTY, COLORADO INSPECTION PORT TYPICAL NOT TO SCALE TIMBERLINE ENGINEERING P.O. Box 842 - CARBONDALE, CO.81623 `P/ F 970 963 9869 timberlineengineering@gmail.comj