Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT Aspen Signature Homes, LLC Lot 267 Ironbridge PUD 38 River Vista GWS, Colorado 1) SEE PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS. 2) ALL WORK SHALL COMPLY WITH THE 2009 INTERNATIONAL RESIDENTIAL CODE (IRC) AND THE MANUFACTURERS INSTALLATION SPECIFICATIONS. 3) GEOTECHNICAL ENGINEER SHALL FIELD VERIFY PLACEMENT OF COMPACTED STRUCTURAL FILL; 1500 PSF. PROVIDE ENGINEER SEALED APPROVAL REPORT AT UNDERGROUND PLUMBING INSPECTION. 4) STRUCTURAL ENGINEER SHALL FIELD VERIFY PLACEMENT OF REINFORCEMENT BARS, HOLD-DOWNS, AND TENDON INSTALLATION. PROVIDE ENGINEER SEALED APPROVAL REPORT AT UNDERGROUND PLUMBING INSPECTION, 5) STRUCTURAL ENGINEER SHALL FIELD VERIFY MEASURING OF POST TENSIONED SLAB CONSTRUCTION. PROVIDE ENGINEER SEALED APPROVAL REPORT PRIOR TO FRAMING INSPECTION. 6) ROOF AND SURFACE DRAINAGE MUST COMPLY WITH 2009 IRC, SECTION 801.3 AND THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER. REFER TO ATTACHED REPORT. 7) ONE (1) HOUR FIRE-RESISTANT CONSTRUCTION IS REQUIRED TO EXTERIOR WALLS AND TWENTY-FIVE PERCENT (25%) MAXIMUM OPENINGS ALLOWED. ONE (1) HOUR FIRE- RESISTANT CONSTRUCTION IS REQUIRED TO UNDERSIDE OF ROOF PROJECTIONS PER 2009 IRC, TABLE R302.1. AS NOTED ON PLANS. 8) ENGINEERED TRUSS SHOP DRAWINGS ARE REQUIRED AT FRAME INSPECTION, 40 PSF. 9) ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED FOR FRAMING INSPECTION. 10) ELECTRICAL FINAL APPROVAL 15 REQUIRED FOR CO/FINAL INSPECTION. /GAG '! F - copy