HomeMy WebLinkAbout3.0 BOCC Staff Report 10.01.1984• •
BOCC 10/1/84
PROJECT INFORMATION AND STAFF COMMENTS
PROJECT NAME: Cottonwood Hollow Subdivision
REQUEST: Final Plat
OWNER: Gallen Smith
PLANNER: Sundesigns Architects
ENGINEER/SURVEYOR: Mountain Engineering and Land
Surveying Company
LOCATION:
SITE DATA:
A parcel located in the NE 1/4 SE
1/4, Section 12, Township 7 South,
Range 88 West of the 6th Principal
Meridian. Generally located 5.2
miles up County Road 113 (Cattle
Creek) from the State Highway 82
intersection.
A 72.427 acre parcel to De split
into 13 single family lots.
WATER: Individual wells
SEWER: Individual septic system
EXISTING ZONING: A/R/RD
ADJACENT ZONING: North: O/S
South: A/R/RD
East: O/S
West: A/R/RD
I. STAFF COMMENTS:
On June 11, 1984, the Preliminary Plan for the Cottonwood Hollow
subdivision was approved by Resolution Number 84-105, with the
following conditions:
1. That prior to final plat submittal, a depth -area -capacity curve
be developed by survey of the McVey Reservoir and that the
appropriate staff gauge be included as a part of the subdivision
improvements agreement. Further, that a letter from the Division
of Water Resources approving the water plan be received prior to
Final Plat approval.
2. Tnat plat notes be included on the final plat that state:
There are severe geologic constraints to development in some
portions of this subdivision. Home builders should note:
a. That lots may be subject to severe geologic hazards as noted
in the Lincoln-Devore General Engineering and Geology Study,
MI, Me, Cl1�ZQ_rq
• •
d. That the floodplain be delineated on the Final Plat and a
plat note stating that the floodplain may limit some types
of individual sewage disposal systems.
3. That the applicant and the Carbondale Rural Fire Protection
District reach an agreement on annexation to the District prior
to Final Plat submittal.
4. That Holy Cross Electric submit a letter stating that utility
easements shown on the Final Plat are adequate.
5. That the homeowners association be incorporated and the covenants
be amended to include the following changes:
a. That Section 2.2 should be changed to read inspection
annually and pumping as necessary.
b. Limit building height to 25 feet in Section 8.4.
c. That the number of horses allowed on lot be consistent with
the augmentation plan limitations.
6. That the developer contribute an agreed upon amount of casn in
lieu of land to the RE -1 School District for school impact.
7. That the developer agrees to participate in off-site road
improvements, on a pro -rata basis, for that portion of County
Road 113 affected by the development. Further, that the
subdivision improvements agreement contain language committing
the developer to participate on a pro -rata basis for road
improvements to the portion of County Road 113 affected by the
development.
8. Prior to Final Plat submittal, the State Engineer submit a letter
of approval of the final water plan.
9. That the final road plan address the driveways to lots 7 & 8 and
9 & 10 as it intersects with the cul-de-sac.
10. That perpetual access easements be a part of the legal
description on the Final Plat including drives to lots 9 and 10,
7 and 8, 2 and 3.
All conditions of approval have been met (see enclosed letters
page ) .
II. RECOMMENDATION:
APPROVAL, authorizing the Chairman to sign the Final Plat and
Subdivision Improvements Agreement.