HomeMy WebLinkAbout2.0 BOCC Staff Report 04.04.1994REQUEST:
APPLICANT:
LOCATION:
1
PROJECT INFORMATION & STAFF COMMENTS
'E,°A A
3 StPf"f ?.
�f L
BOCC 4-4-94
Exemption from the Definition of
Subdivision
Carl Midland
Located at the southeast corner of
SH 82 and CR 113 (Cattle Creek)
SITE DATA: 74.305 acres
WATER: Variety of water rights
SEWER: Individual Sewage Disposal System
(ISDS)
ACCESS: County Road 113 (Cattle Creek
Road)
ZONING: A/R/RD and C/L
ADJACENT ZONING:
North - C/L
South - A/R/RD, O/S
East - A/R/RD
West - A/R/RD
I. RELATIONSHIP TO THE COMPREHENSIVE PLAN
The tract of land is located in District C, Rural Areas, Minor Environmental
Constraints and District F, Severe Environmental Constraints.
II. DESCRIPTION OF THE PROPOSAL
A. Site Description: The subject parcel consists of creek bottom lands and steep
hillsides. Cattle Creek traverses the property in an east to west direction, with
a significant portion of thiloottom land being within the 100 year flood lain (see
vicinity map on page_ / • , and floodplain profile on page' 0• ). The
floodplain potentially contains federally protected wetlands. County Road 113
runs along the northern boundary of the property. The property is currently
undeveloped, with the exception of an existing house associated with the original
ranch. To the east of the property is an auto salvage yard, north of and across
Cattle Creek is an area of Commercial zoning (C/L) that includes both
residential and Commercial uses.
/s'f.
• •
B. Background: Approximately 44 acres of the 70 acre parcel was rezoned to
Commercial/General (C/L) by Resolution 92-047. Since that time, Mitch Heuer
was granted a floodplain SUP for a go-cart tract on the 11.056 acre tract (Parcel
A of the exemption proposal). To date, no building permit has issued for the go-
cart facility, pending compliance with conditions of approval associated with the
original SUP approval.
C. Project Description: The applicant is proposing to split the 74.305 acre parcel
in to three (3) parcels of approximately 11.06, 28.06, and 35.098 acres in size.
The proposed go-cart track will be located on the 11.06 acre parcel. A sketch
plan of the proposed exemption is shown on page ' Z / • .
III. MAJOR ISSUES AND CONCERNS
1.
Subdivision- Section 8:10 (Applicability -Exemptions) states that the Board has
discretionary authority to except a division of land from the definition of
subdivision. Following a review of the facts of each application, the Board may
approve conditionally or deny an exemption request. The board may not grant
an exemption unless the applicant can demonstrate compliance with zoning,
legal access, adequate water and sewer, state environmental health standards,
necessary road and drainage improvements, fire protection, adequate easements
and school impact fees.
In addition, Section 8.52 (A) states that a total of four (4) lots, parcels, interests
or dwelling units will be created from any parcel as that parcel was described in
the records of the Garfield County Clerk and Recorder's Office on January 1,
1973, and is not part of a recorded subdivision; however, any parcel to be
divided by exemption that is split by a public right-of-way (State or Federal
highway, County Road or Railroad) or natural feature, preventing joint use of
the proposed tracts, and the division occurs along the public right-of-way or
natural feature, such parcels thereby created may, at the discretion of the Board,
not be considered to have been created by exemption in regards to the four (4)
lot, parcel, interest or dwelling unit limitation otherwise applicable.
Records in the Clerk and Recorders Office indicate that the parcel has been its
existing configuration since February of 1970 (Book 384 Page 358). Therefore
up to four parcels can be created through to exemption process.
2. Zoning: All lots far exceed the minimum lot size requirements of 7,500 for the
Commercial/General (C/G) zone district. The existing structures appear to be
consistent with respect to setbacks for the C/G zone district.
3. Legal Access: Access for the Lot A would be directly from CR 113. Lots B and
C both appear to take access from a road recently improved from the frontage
road of State Highway 82 (SH 82). The proposed access easement from the
frontage road is shown on the plat as 30' access and drainage easement.
4. Water: The applicant retained Wright Water Engineers WE) to undertake
a water rights analysis of the property (see pages Z1 4). The applicant
intends on serving parcel C with an exempt well permit. Parcels A and B would
be served by taps from the Cattle Creek Sprits and Pipeline system, which
traverses the property (see letter on page a ).
• 1
WWE concluded that adequate water rights do exist to support the proposed
commercial uses on the property, although augmentation and additional
agreements with the Cattle Creek Springs and Pipeline system will be necessary.
Conversations with the applicant indicated that no well permits have been
applied for. Staff suggests that the resolution of these issues be a condition of
approval.
The State Engineer's Office has not responded to the referral.
5. Sewage: Sewage is proposed to be handled by ISDS. Staff reviewed the
County's Lincoln-Devore Hazards Maps, and these indicate that the site is
located in an area of "High Groundwater and Septic Limitation", as well as an
area ofevaporite. The relationship between the project and the hazards mapping
is shown on pages 0 . Staff suggests that the following plat note be a
condition of approval:
"All lots may be subject to the requirement of engineered wastewater systems.
At the time of building Permit Application for future structures, proof will be
required bya licensed Colorado Engineer regarding specific wastewater system
needs on each lot."
6. Natural Hazards: A review of soil and slope hazard maps (Lincoln-Devore
Testing Laboratories) indicate that the site includes significant portiong of soil,
slope and septic constraints. Hazard profiles are shown on pages 30
7. Fire Protection. Ron Leach has reviewed the project, and recommended that a
dry hydrant by installed, and all storage of fuel be stored consistent with NFPA
standards (see letter on page' 3 1 - ).
8. BLM: The BLM has reviewed the project, and indicated that adjacent lands are
subject to public recreation (see letter on page3 2. - ).
IV. SUGGESTED FINDINGS
1. The proposal is in general compliance with the Garfield County Comprehensive
Plan and the Garfield County Zoning Regulations.
2. The proposed land use would be consistent and compatible with the existing
surrounding land uses.
3. The proposal is in best interest of the health, safety, morals, convenience, order,
prosperity and welfare of the citizens of Garfield County.
V. RECOMMENDATION
1. All representations of the applicant shall be considered conditions of approval
unless otherwise stated by the applicant.
2. The applicant shall have 120 days to complete the required conditions of
approval. Extensions of 120 days may be granted by the Board for a period of
up to one (1) year.
3. A Final Exemption Plat will be submitted, indicating the legal description of the
property, dimension and area of all proposed lots or separate interests to be
• •
created, access to a public right-of-way, and any proposed easements for
drainage, irrigation, access or utilities.
4. The applicant shall submit$2Q.00/in School Impact Fees prior to the signing
of an exemption plat.
Proof of adequate water supply, either in the form of well permits/augmentation
plan (if necessary), and/or agreements with the Cattle Creek Water Company
must be submitted prior to approval of a Final Exemption Plat.
6. The following plat notes shall appear on the final plat:
1. All the lots may be subject to the requirement of engineered wastewater
systems. At the time of building permit application for future structures,
proof will be required by a licensed Colorado Engineer regarding specific
wastewater system needs on each lot.
2. Lots A, and B include regulated floodplain and may include federally
regulated wetlands. All development within the regulated floodplain
requires a Special Use Permit from Garfield County. Any development
in the wetlands may require approval from the U.S. Army Corps of
1/44Engineers.
\ Engineers.
Engineered foundations may be required for all structures. Engineered
stamped plans will be required prior to the issuance of a building permit.
Prior to the signing of an exemption plat,, the applicant shall install a dry
hydrant, consistent with NFPA Standard 1231 (Water Supply for Fire Fighting)
for fire protection purposes. The installation of the dry hydrant shall be
approved by the Chief of the Carbondale & Rural Fire Protection District, prior
to t.
' SSvP,-:., ..7I - p NKr,
co
8. Weed control is the responsibilty of the property owner.
.- Cam -N Ci L"'‘2
)`"5 `"5
TN6 P.Or.,L c"' Pclot
t ten pr <�_. r�.cf t';y lb rf�i f"P�4P
rc-TT 1c� �t.�sS !4
/ To 1= azure. x,;145., ►,ApTio�(b
%/i�'1'S ,s 11k7N rp L. k%t)vfrk.',
5u3Dt Vt.1o.1 o �. Tt� i'Ub T:''tc;. �� C� , lr�"�t= �""u! 1
. 17 •
' 4
n4.
•
ECTION
AN
It/
cb
0
1.;
were, ril
• •
BM
„6025
-......e... — 4 ..' . ''.
0
a)
—0
77
200
)14
11,
jAt F oq v AN-
FLoA) TA.pm,
MPI_a4-11) 5 B-3!
Ftoc>p PL/N Mon
4`
DebO.r 4•1...T •"
4 re
GA.RFIEL.D COUNTY, STA?
CO /V
X14 •► ►4/r
4)04D
7333,,
C(NIIRIM Ot WAICRIINC -
IASL II(NI
t ),rarer, 11.056 Ac, -5
11011'
rib• 00. /J
►4''Sr
rr M1L 4. 403.1„. •►. ►
r
4y.
)
\_ MPI. STARS INC m
CAS UNC PROW
U3
‘s.‘
U1
IRRIGATION ANO ACCESS IASIMtNI
-NMed?'
„lY 1 MVIO'�—S.K�4
` fit. 44
N 301413. srf a \v�) St,,e,r
1 70,1'p• e�
111'
ClNNRIRn O( CARR CRUK AS
SVRIt)t1l I/27/92 \
C(NIIRIIN(T WAItRIINt
(Asuman-
PARCEL "I)" --Iv'
�P. o 1 Rate,
3 0690'00' ! —
•
7„r
e - e7slr
e. Mt,1'
-117.0
CINIIRUNE Cr CA11LE CRIU(
41ty
`pta
•
MINI) OLM.
ALUMINUM CAP
,r7 SrI
Ks? 248.21'
1r
•
PARCEL "C”
35.098 ACRES
SOUP Un Cr 44-1/I S(CnP4 IS
,r11Cr
lam'
r rralbl' [
saint JO.jJ•
+ Ir r
•
{
I$
MUM gill Amino' CAP puAESTDD cams)/
(b.
C_t_t I/84 CORM
SCUM l.M. ALUMOIIJY CW
FOUND D.L.
MIS
Wright Water Engineers, Inc.
DENVER OFFICE
2490 West 26th Ave., Suite 100 A
Denver, Colorado 80211
(303) 480-1700
April 2, 1993
GLENWOOD SPRINGS OFFICE
818 Colorado Avenue
P. O. Box 219
Glenwood Springs, Colorado 81602
(303) 945-7755
Denver Direct Line: 893-1608
Mr. Mark Bean
Garfield County
Regulatory Office & Personnel
109 Eighth Street, Suite 303
Glenwood Springs, Colorado 81601-3303
RE: Domestic Water Supply for the Proposed Midland Exemption
Dear Mark:
Wright Water Engineers has been retained by Carl Midland to investigate the water resources
and water supply options for development of his Cattle Creek property located at the southeast
corner of Highway 82 and County Road 113.
Attached is a copy of our report dated April 2, 1993. Based upon our investigation, it is our
opinion that an adequate domestic water supply can be developed through construction of new
well(s) in the Cattle Creek alluvium and/or by tapping into the existing Cattle Creek Water
User's system, and/or by developing the unadjudicated spring located in the southern portion
of Parcel B.
Please call if you have any questions.
Very truly yours,
WRIGIIT WATER ENGINEERS, INC.
By:
Michael J.
Project M. .'ger
MJE/blh
931-023.000
cc: Carl Midland
P.E.
Wright Water Engineers, Inc.
DENVER OFFICE
2490 West 26th Ave., Suite 100 A
Denver, Colorado 80211
(303) 480-1700
April 2, 1993
Mr. Carl Midland
0726 County Road 137
Glenwood Springs, Colorado 81601
GLENWOOD SPRINGS OFFICE
818 Colorado Avenue
P. O. Dox 219
Glenwood Springs, Colorado 81602
(303) 945-7755
Denver Direct Line: 893-1608
RE: Cattle Creek Property — Water Resources Inventory and Water Supply Options
Dear Carl:
At your request, Wright Water Engineers (WWE) has investigated the water resources and
water supply options for development of your 70 -acre site on Cattle Creek. We have examined
the water rights appurtenant to the property, estimated the water demand based upon the
proposed land use, and evaluated the water supply options to serve the proposed development.
SUMMARY
The following water resources are associated with the property:
• 42 shares of the Glenwood Ditch for irrigation of 18 acres.
• A 3/4 -inch tap from the Cattle Creek Springs & Pipeline System (Cattle
Creek Water Users' system).
• Unadjudicated spring with an estimated flow of 5 gpm.
• Cattle Creek through the property.
• Alluvial groundwater aquifer.
The estimated average annual domestic water requirements for proposed development of the
property totals approximately 16,700 gallons per day (gpd). The demand for Parcel A can be
served by the existing 3/4 -inch tap from the Cattle Creek Springs. The remaining domestic
water demand can be supplied by either acquiring additional shares of the Cattle Creek Springs
& Pipeline or by drilling a new well(s) with a minimum long --terns safe yield of approximately
15 gpm. In our opinion, both alternatives would provide an adequate supply of water for the
proposed development. however, there are potential long -terns water quality concerns with
the Cattle Creek Springs and regulatory issues with the Colorado Department of Health
(CDOU). In addition, the unadjudicated spring can be developed to serve some of the water
demand.
Mr. Carl Midland
April 2, 1993
Page 2
WATER RIGHTS
Properly decreed water rights for potable and irrigation water are required to develop the
Midland property.
Irrigation Water Rights
In recent years the property has been irrigated by the Glenwood Ditch.
Midland holds a water rights lease to use 42 shares of the Glenwood Ditch. The lease is with
the previous owner of the land, Union Oil Company, and ends December 31, 2001. These
shares are part of a water augmentation plan (W-2206) whereby Union Oil, upon demand, can
transfer the historic consumptive use to their oil shale operation near Parachute, Colorado.
Midland is required to use the shares to irrigate 18 acres on the property.
To meet the irrigation needs on the Midland property, Union Oil's interests in the Glenwood
Ditch could be permanently acquired if Union agrees, or additional shares of the Glenwood
Ditch could be acquired and transferred to the property, provided that no portion of the Union
Oil water augmentation plan (W-2206) is violated.
Potable Water Supply 'Vater Rights
If the existing Cattle Creek Water Users' system were to be used to provide potable water to
the Midland property, the existing decreed right on that system, would, in our opinion, provide
a firm water right. It would be protected by the operating criteria for Green Mountain
Reservoir. The Cattle Creek Springs & Pipeline, for 70 gpm, was adjudicated in 1971 with
a 1968 appropriation date.
If a new well(s) is used as a source of water, water rights would need to be acquired. We
believe it would be easy and straightforward to acquire augmentation water from Ruedi
Reservoir for out -of -priority diversions by the well's junior rights. The only vested water
rights between a well on the property and the Roaring Fork River are for Cattle Creek
diversions to the -Glenwood Ditch. We believe that an agreement can be reached with the
Glenwood Ditch that would allow the "exchange" of Ruedi Reservoir water up Cattle Creek
past the Glenwood Ditch to the wells. In addition, shares of the Glenwood Ditch could be used
to augment the new depletions.
Mr. Carl Midland
April 2, 1993
Page 4
The estimated average annual potable water demand for the proposed development is approxi-
mately 15 gpm with a peak day demand of approximately 35 gpm. A storage tank may be
required to meet peak demands as well as fire flow requirements to be set by the Carbondale
and Rural Fire Protection District. The above is based upon conceptual level planning and
should be refined when more detailed plans for development of each parcel are available.
WATER SUPPLY OPTiONS
Cattle Creek Water Users Association
The Cattle Creek Water Users Association serves about 12 potable taps north of and including
the Midland property. Its water supply is delivered from a spring on Cattle Creek near the east
end of the Midland property. The water is chlorinated and reported to be hard. 1t is not
regulated by the State as a community public water supply because it currently serves less than
15 homes.
If the remaining four parcels (B, C, D and E) of the Midland property tapped into the
Association's water system, then the system would be required to meet the standards of a
public water supply as promulgated by the EPA and CDOII. Given the location of the spring
adjacent to the Circle Y Salvage Yard, the CDOII would require a Particulate Analysis and
tests for total petroleum hydrocarbons and primary drinking water standards test. Based upon
the results of these tests, an expensive filtration system and/or hydrocarbon removal may be
required.
According to Slim Welcher, the spring has provided an adequate water supply for the users for
many years. The spring is reported to yield 70 gpm. We have not confirmed this nor can we
state with certainty whether or not the added potable water requirements of the Midland
property would exceed the current yield of the existing collection and pumping system spring.
Based upon records kept in the pump house, the current average use is approximately 15 gpm
with an estimated peak day use of approximately 40 gpm.
Groundwater Supply
The bedrock under the property is the Eagle Valley Evaporite (Pennsylvanian). This formation
can be seen on the property above the valley bottom on the sides of the hills. These evaporites
have a high percent of gypsum, and are soluble and erodible. The Eagle Valley Evaporite is
known for its poor water quality and will not yield an acceptable quality of water for a potable
water system without extensive treatment such as reverse osmosis.
The fluvial deposits laid clown by Cattle Creek on the property are considered "younger
alluvium." The maximum depth on the property is unknown and may, on the western edge
of the property, be underlain by older alluvium that may have a higher water yield.
Mr. Carl Midland
April 2, 1993
Page 5
According to the State of Colorado's 1974 Environmental Geology No. 8 Report titled
"Roaring Fork and Crystal Valleys, an Environmental and Engineering Geologic Study," the
property is underlain by a potential sand and gravel source area.
There are no registered wells and no decreed springs on the property. There are numerous
wells in the Cattle Creek alluvium upstream of the Midland property with reported yields of
10 gpm to 45 gpm. Our field investigation of the spring in Parcel 13 indicated a flow rate of
approximately 5 gallons per minute on March 12 and March 26, 1993.
In our opinion, adequate water quantity and quality can be obtained from well(s) in the Cattle
Creek alluvium.
RECOMMENDATIONS
Based upon our investigation presented in this report, we offer the following recommendations:
• File a water rights application on the spring located at the base of the ridge
in Parcel B. This water can be developed for numerous uses on the property
including domestic and irrigation. Use of the spring will be out -of -priority
diversions and must be augmented.
• Acquire permanent shares of the Glenwood Ditch.
• Commence negotiations with the Cattle Creek Springs & Pipeline water users
to acquire shares of the system.
• Drill a test well in the Cattle Creek alluvium at the west end of the property
to verify adequate water quantity and quality. This would cost between
$5,000 and $10,000 depending upon the depth. This can could be converted
to a production well.
MJE/blh
931-023.000
Very truly yours,
WRIG1IT WATER ENGINEERS, INC.
By:
Michael J. Eri e
Project Mana:er
P.E
By:1L6L41/4'x`1
Wi liam L. Loran, P.E.
Vice President
7
8
9
10
11
12
C�l1SZ.�
(A) gi,\
:3/(41:
13
14
•15
16
17
15
19
20
21
22
23
24
25
26
27
elow
M►p�a.�� 93-35"
S pry c. GoA5tri\141}
it
SEPTIC
CONS TPA INTI
MIDLAND
EXEMPTION
Nq
_
:73
8
C
,.ji
4
F
k,
elow
M►p�a.�� 93-35"
S pry c. GoA5tri\141}
a9
WP
5 tL ��5► �1�lNT�
R,
ramammil
.
SOIL
HAZARDS
MIDLAND
EXEMPTION
1 M
w
ui
�
_
r�°r
`• F.
!� .►
L'-�::c.��•
tusumi
lemma
N
4l�s-
1i�
Iminim
..
m
a9
WP
5 tL ��5► �1�lNT�
=UM in no
‘11111•111101m •
INESTIM
1111:&+■
IWWI ■
flA4:3■
IMMO
Ii ! ■
IVA rfl ■
iZiU
■IC„■
Nl IAS-c4st5 6 - 35-
S L-oP� C,o r19T AI r4IT$
(303) 9634491.
February 5, 1994'
Dave Michealson
Garfield County Planner
109 8th,, St.
Olenwood.Springs, CO 81601.
Dear Mr. Michelalion,
•
- •• • ' i..4 • • - •
•
, ; - • "•- • ‘'.'3,'T./A,•,,-
••• • • '' • • ' '" ;
• , • •
. • •
• ;1412•tyre
.
' • '
.41
1 •• :') ••41) LIi?
Mitch Huer contacted MO yesterday- end asked me to comment to you on.fIre protection
the property looked. at. 0082 County Road 113 and.currentlyowned by, Carl Midland_Mr:;:
Iluer explained.that the current plan In to split the property into.i.wo pieces, anclin. utillzeionsK
of the parcela,as, a go cart track enterprise,. There are, currently no plans; for the; second weal
• -
d
This property is within the boundaries of the Carbonciale.8c Rural Fire:Protection District,an
the district will provide service to the property.
While I have not seen any plans for the proposed go cart track, I
conditions that would create unusual fire protection hazards with
storage. Any on -site fuel storago will be required to be installed
accordance with NFPA standard 30 (Flammable and Combustible
do not foresee any rpecial.'
the exception of on•site,lbel: ':,..-..-• '•:',l ,--
and maintained in : . - • :`-'z,‘ cf::,;47
• •-.;, ,,`',1",,
Liquids Code).. - . ,! ,;
- ' ' ' - -!toit•
[.,....
,
Water supply for fire protection is a problem as there im currently no, on.iiie wider rupplY.4.2.ii*;!-q..-:
The owner should provide access to Cattle Creek for the fire department and install a
hydrant into the creek for water supply for fire protection. The dry hydrant.will be-requiredf0,447.,.
to be installed ia accordance with NFPA standard 1231 (Water Supplies for Fire,Fighting)-AgtrAti
Additionally, the dry hy
drant should be made available to the fire department for firp:11 tf
, fiefilt,A
purposes in the surrounding area.
„., • .•L•r, '
•
if you have any questions feel fi-ee to contact me at 963-2491. • '
Sincerely,
Ron Leach, Chief
Carbondale & Rural Fire Protection District
co:
Mitch Huer
Po Box 1412, Glenwood Springs Colo. 81601
Pt:
•
f
•
•
•
•
T.91:1:1q4"1.
• 4; :Po,. •
'
I •
i•hp
• •
r( r1
United States Department of the Inte or MAR 30
BUREAU OF LAND MANAGEMENT
Glenwood Springs Resource Area
50629 Highway 6 and 24
P.O. Box 1009
Glenwood Springs, Colorado 81602
March 29, 1994
Mr. Dave Michaelson
Garfield County Planning Department
109 8th Street - Suite 303
Glenwood Springs, Colorado 81601
Dear Mr. Michaelson:
1994
GAR1=1ELD COUNTY
IN REPLY REFER TO:
'1785g
(7-880)
In response to the request for comments regarding the proposed Midland
Subdivision Exemption located south of County Road 113 and east of Highway 82
between Glenwood Springs and Carbondale, I offer the following statements for
your scheduled April 4, 1994 public meeting. The proposed 35.098 acre parcel
borders public lands administered by this office. These statements are
similar to those presented in my December 15, 1993, letter regarding a
previous subdivision proposal of this property.
1. The landowner should be aware of the location of property boundaries to
ensure no encroachment occurs on public land.
2. We are not aware of the location of utilities for power, telephone, etc.
to the property. If utilities are proposed that would cross public land, the
utility company would have to obtain a right-of-way from this office. An
environmental assessment report would be completed as a part of the ROW
permitting process.
3. The adjacent public land is not currently being permitted for livestock
grazing. Public lands are open for hunting and other dispersed recreation
activities. The proponent should be aware that such recreation uses are
allowed on BLM-administered lands.
We appreciate the opportunity to comment on this action. If you have any
questions or need additional information, please contact Jim Byers in this
office at 945-2341.
Sincerely,
Michael S. Mottice
Area Manager