HomeMy WebLinkAbout3.0 PC Staff Report 10.09.1991REQUEST:
PC 10/9/91
PROJECT INFORMATION AND STAFF COMMENTS
Eastbank Commercial Center
Preliminary Plan
OWNER: Wayne Rudd and John Stanford
LOCATION: A parcel of land located in
Government Lots 9 and 18, Section
1, T7S, R89W of the 6th P.M.;
located off C.R. 154 just west of the
intersection with Highway 82
opposite the CMC turnoff.
SITE DATA: The site consists of' 3.9 acres.
WATER: Individual well.
SEWER: Individual Sewage Disposal System.
ACCESS: Existing and proposed driveway.
EXISTING AND ADJACENT ZONING: C/L (Commercial Limited).
I. RELATIONSHIP TO THE COMPREHENSIVE PLAN
The subject property is located in District D - Rural Areas with Moderate
Environmental Constraints as designated on the Garfield County Comprehensive Plan
Management Districts Map.
II. DESCRIPTION OF THE PROPOSAL
A. Site Description: The subject property consists of an excavated and graded
building site located west of and below the Highway 82 and C.R. 154
intersection. The site is currently developed with two (2) buildings separated by
a vacant building pad. The remainder of the property is occupied by
landscaping, driveways and parking areas.
B. Project Description: The applicants are proposing to split the subject property
into three (3) lots of 1.06, 1.1 and 1.7 acres in sizes (see enclosed text and plat).
C. Background: In 1990, the applicants obtained a Special Use Permit to allow for
the construction of two (2) buildings intended for storage. The first building was
constructed last year at the north end of the subject property and operated as
"File Finders", an office records storage facility. The second "storage" building
has not been constructed to date. A second generic commercial lease building
was constructed at the south end of the property in early 1991. This building is
currently leased to service commercial and contracting business.
•auif iiiaadoad
agl 01 aigriirnr iCtluouno an satpifiln otaloolo pur auogdaial `sup :satltfiln
-sparpurls uofraaua0 duj •g-1.1 2utsn punoo'Cup aad 0porgan r uo pasrq
oq IUM iellordro uatsap aq,I -spat.puris prow paldope iepuooai gpim aourpa000r
ut pau2isap oq o1 poou pinom iCrmproJ pasodoad aq,I, •spro.z aotaalut aoj
p0gioads uooq anvil sp.repuris owads ON •it.noaddt irid frut,g o1 alisinbaaaad
r sr pa.zinbaz oq pinogs i1u-uod /Crmanup put. luatuasra ur ututrlg0 -amanup
panoiddr iilunoj .io lualuasuo palt.0ipap r lou Si sna •luauzasra ss000r alrnud
lua0rfpr ur rin peal iClunoj ail sassaoor ,Crmanup a ogpou ail, ' g -11•D
opuo iCfloaatp sassaoor `agpug pur pro)J iClunoj 'Cq pa1ULua0d `iCrmanup auO
•uotsintpgns 011101 p0sodoad sputod ssaoor (z) om1 iCilua.uno on aloq,I, :sproji
•a0ururA
r onsind 01 Si uotlrinOaa stip uuouJ Jatlaa Jo LuaoJ 0UO •111fr0H Jo 1uotupardoQ
opraofoJ palruaisap ss0iun a0anos Iralua0 panoaddr ur paiopisuoo
lou Si iiam it.nptntpui uy •aoanos Irapua0 panoaddr ur LuoJJ paptnoad st aalrm
0tpsauiopJl pamoifr are sal:yr z o1 i JO sia0ard •8110m irnpiniput pup •S•Q•S•I g1im
siao.red.zoj saaor (z) om1 jo uinuziuiui r sonnbaa uotlnloSj guiuoZ ogljo O' b0'S
uot1o0S `uotlippr uI -pram Si slsaaa1ui dtgsaaumo OuuaJJip gpim spgjuoo aoj
pnivapod 0111 •paranoostp st tualsiCs aalt.mals1'm pa.zrgs t. Jo ldaouoo 011,1, •JJr1s
of suaaouoo sluasaad luotuauraar stq,1, z par f slot uo pa1rooi 'S•Q'S'I utisixa
ur IuouJ slot (£) 0aag1 ail OOtnaas of ulsodoad air spuroiiddr 0qI, :a0113m01s1M
-sou!' aalrm apnt0ui 01
p0sodoad uooq anrq slu0Luasra ikltftln laxurig -pasodo.zd uooq anr11 sluauraaar
0ouru0lutrut JO 2uurgs iiam oN •uoilran2yuoo 1o1 posodoid ail qpm lurlfdhuoo
s5inpitng alrard0s aaagl 01 do atrpocuu poor uro liuuad aqp `.imo1 •N•M•Q
0111012utpa000y •ielaadoad 0111 uo Ilam pa1ltuuad r /Cflu0aan0 Si =11Z :aa11M
.3
SN2Ig3NO QNV Sgf1SSI 2IOfVYAI 'AI
-( aged uo Ja1laf oos) iClaadoad
loafgns 0111 uo pstxa sparzrq 0!0003 aofrIU oN :Xon.tnS It.otgol000 opraoio3
•s1.11001.100 onpum oN :0JlipitM Jo uotsIAIQ opraol03
•uotlrutureluoo aalt.mpunoag aoJ Irtlu0lod
lump? pauaaouoj •sasn imaaau uoo mourn wo.J 'S'Q'S.i jo uoprutuzrluoo
aoj irtlualod alp lnogr pauaaouo3 Away' jo luauzl.Irdoa opraolo3
•( aged uo 001101 oos) •sasn posodoid aoj
palltuuad iClalrudoaddr st ifam guilsixg :saoanosoj.to rM Jo uotslntu opraofoD
.Q
.3
.d
SINAI/010D A3NTOV MgIAgWf 'III
-urid trials ail sr aures agp iellrr urlsgns st urid
kref tuniaad aqL -ssaoor Jo iCornbapr ail pun aalrm jo iCornbapr `�uiuoz glim
10!UuoO sit pur Lualsies a0lrmapsum paargs oqi papnioui sUJOOuo3 •uotsstuILuoJ
5utuurid 0111 01 uoipr0tiddr urid go10 s r, palltcugns slurottddr aqp `ieln f u1
•iClaadoad 0111 guipinipgns fflr5o1 Jo irog ail sparmol
uotlrogddr urid 11010I'is r paty anrq slur0tfddr aq1 `suaaouoo sJJr1s 01 asuodsaa
11.1 •suotlringaN uorsintpgng 0111 Jo uoiprioin ui spared alrardas (£) aaH111 opui
klaadoad loafgns ail ltids prq .9u1100dr og11rg1 aarmr auuroaq Buis `Xryq u1
• •
Drainage: There is currently a stormwater retention basin on the site.
According to the drainage report, additional retention capacity will be required.
An engineered design and improvement plans will be required prior to the
approval of a final plat.
F. Fire Protection: No specific fire protection improvements are being proposed.
The Carbondale Rural Fire District has not commented on the subdivision
proposal. They have consulted with the Building Department on the design for
both of the existing buildings.
G. Zoning: Because of the lack of a central water system and the parcel size of less
than two (2) acres, the subdivision proposal conflicts with the Zoning
Resolution. Options include obtaining a Variance or a designation of the water
system as a "community system" by the Colorado Department of Health.
V. SUGGESTED FINDINGS
A. That proper publication, public notice and posting were provided as required by
law for the hearing before the Planning Commission; and
B. That the hearing before the Planning Commission was extensive and complete,
that all pertinent facts, matters and issues were submitted and that all interested
parties were heard at the hearing;
C. That the proposed subdivision of land is in general compliance with the
recommendations set forth in the Comprehensive Plan for the unincorporated
area of the County;
D. That the proposed subdivision of land conforms to the Garfield County Zoning
Resolution; and
E. That all data, surveys, analyses, studies, plans and designs as are required by the
State of Colorado and Garfield County have been submitted and, in addition,
have been found to meet all requirements of the Garfield County Subdivision
Regulations.
VI. RECOMMENDATION
Due to the conflict with the Zoning Resolution, staff cannot recommend approval of
this request. However, if the Planning Commission is inclined to recommend approval
then staff recommends that approval be subject to the following conditions:
1. All representations of the applicant, either within the application or stated at the
public hearing before the Planning Commission shall be considered conditions
of approval unless otherwise stated by the Planning Commission.
2. The applicant shall resolve the conflict between lot size and wastewater disposal
method by obtaining a Variance or a designation as a community water system
by C.D. of H. prior to the approval of a Final Plat.
3. The applicant shall establish a Property owner's association. The property
owner's association shall be incorporated in accordance with Colorado Revised
Statutes. The property owner's association shall be responsible for ownership
and maintenance of all common facilities to include, but not limited to; water,
sewer, utility drainage and road facilities. Protective covenants shall be prepared
and reviewed prior to the approval of the Final Plat.
• •
4. The applicants shall prepare and submit a subdivision improvements agreement,
addressing all on and off-site improvements, prior to the approval of a Final
Plat.
5. The applicants shall submit improvements plans for all road, drainage and utility
improvements prior to the approval of a Final Plat.
kid iikk
6. All tilities hall be placed underground.
7. The applicants shall revegetate and/or landscape all disturbed areas of the
property where said activity is not precluded by other encumbrances.
8. The applicant shall submit plans and specifications for additional stormwater
retention facilities as required by the drainage report.
9. All required permits from the Road and Bridge Department shall be obtained
prior to the approval of the Final Plat.
10. All roadways shall be designed and constructed in conformance with design
standards set forth in the County Subdivision Regulations and in place at the
time of submittal of the Final Plat.
11. The protective covenants shall address the prohibition of introducing
contaminants into the wastewater system. This shall also be included as a plat
note.
12. The following plat notes shall be included on the Final Plat:
a) Facilities common to each lot include water, sewerldrainage and utility
improvements. Use and maintenance are regulated by restrictive
covenants.
b) A blanket utility easement encumbers the entire subdivision.
c) Contaminants may not be introduced into the wastewater system.
ROY ROMER
Governor
OFFICE OF THE STATE ENGINEER
DIVISION OF WATER RESOURCES
1313 Sherman Street -Room 818
Denver, Colorado 80203
(303) 866-3581
FAX [303] 866=3589
July 10, 1991
Mr. Andrew McGregor
Garfield County Regulatory Office and Personnel
109 8th Street, Suite 303
Glenwood Springs, CO 81601
RE: Eastbank Commercial Center
NE 1/4, SE 1/4, Section 1, T7S, R89W, 611 PM
Division 5, District 38
JERIS A. DANIELSON
State Engineer
0 ?._,,,vg N
JUL 18 1991 1
GARFIELU uuuNTY
Dear Andrew,
We have reviewed the above referenced proposal for comments on a sketch plan submittal for
the commercial center. Currently there are two existing buildings and one proposed building. The
proposed water supply for the three buildings is an existing well, Permit Number 37778-F.
This well is pennitted for fire protection, commercial purposes and irrigation of not more than
0.08 acres (3,200 square feet) of lawns. If the applicant proposes these uses of the well for the
complex, we can recommend approval of this plan.
Should you have further questions regarding this submittal, please contact this office.
(yldy T. Ki<appington
Water Resource Engineer
JTS(f)/clf:eastbank
cc: Orlyn Bell, Division 5 Engineer
Joe Bergquist, Water Commissioner, District 38
Bruce DeBrine
ROY R. ROMER
GOVERNOR
riejoall
(l1((Dalt 0
D,tt01
of ot-�.lAtf(J
w
T 110
COLORADO GEOLOGICAL SURVEY
DEPARTMENT OF NATURAL RESOURCES
715 STATE CENTENNIAL BUILDING.- 1313 SHERMAN STREET
DENVER, COLORADO 80203 PHONE (303) 866-2611
i''1. !\ J G 27 1991 ,l
L.
August 22, 1991 GA -92-0001
Andrew McGregor
Garfield County Planning Department
109 8th Street, Suite 303
Glenwood Springs, CO 81601
RE: Eastbank Commercial Center
Dear Sir:
lar,t�r L.`i)
JOHN W. ROLD
DIRECTOR
We have reviewed the preliminary plan, drainage report and geologic investigation for this
subdivision. Minor geologic conditions affecting the site include: swelling soils, slope
stability, flooding, and the potential for radon gas.
Site geology consists of thin alluvial fans overlying a thicker gravel terrace. The gravel
sequence is of an undetermined depth, but should be thick and compacted enough for
commercial building structures. Site specific soils testing for foundations should include
swelling soils tests if any clayey material is discovered.
Slope stability problems on site are minimal. Off site there is a moderate rockfall hazard
in the red cliffs across Hwy 82 north of the site. The highway and railroad should intercept
any rock features that project toward this site. South and west of the site, shallow bluffs
over the Roaring Fork River should have setback determinations for buildings. Erosion
from the slope to the river does not endanger this site as it is too far away.
Flood drainage from both the Roaring Fork River and the red cliffs area seem to be
covered in the Drainage Study by Tini Beck. The moderate slope onsite should help
drainage toward the river. Flood information from the Roaring Fork River may be obtained
from the Colorado Water Conservation Board.
No radiation survey was conducted for this site. We recommend testing for radon for all
proposed structures. Radon -reduction building techniques should be implemented if any
radon accumulation is observed.
go 01,
G E O L v u Y
STORY OF THE PAST... KEY TO THE FUTURE
Garfield County Planning Department
August 22, 1991
Page 2
If the recommendations outlined above and those of the consultant geologist are followed,
then we have no objection to the approval of this subdivision.
Sincerely,
l . r1
&Rai
Christopher J. Carroll
Engineering Geologist