Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLC0-7-14-3288 Ken Sack/Eagle Springs USDA Meat Processing Plant 482 CR 315 Silt, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC , IPC, IFGC, IFC , IECC, AND THE MANUFACTURERS INSTALLATION SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS. 3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT. 4) ALTERATIONS TO EXISTING STRUCTURE IS TYPE VB CONSTRUCTION, F 1 OCCUPANCY . 5) CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS . FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED FOR FINAL/COMPLETION INSPECTION. 6) COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT (CDPHE) FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION . 7) ENGINEER APPROVAL LETTER FOR EXISTING COOLER CONSTRUCTION IS REQU I RED FOR FINAL/COMPLETION INSPECTION. (SEE LETTER IN FILE) 8) COMPLIANCE LETTER FOR COOLER EQUIPMENT INSTALLATION, SIGNED BY A QUALIFIED MECHANICAL DESIGNER, IS REQUIRED FOR FINAL/COMPLETION INSPECTION. 9) ALL EXPOSED FOAM INSULATION MUST BE COVERED WITH A THERMAL BARRIER AS REQUIRED PER 2009 IBC, CHAPTER 26. 10) ACCESSIBILITY REQUIREMENTS PER 2009 IBC, CHAPTER 11, AND ICC/ANSI A117 .1-2003. 11) PROVIDE EXIT SIGNS EQUIPPED WITH EMERGENCY LIGHTING AT ALL EXIT DOORS . VERIFY EXIT SIGN LOCATIONS PRIOR TO ELECRICAL ROUGH-IN INSPECTION . 12) ELECTRICAL PERMITTING/INSPECTIONS BY THE COLORADO STATE ELECTRICAL BOARD. 13) ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION. 14) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION . 15) GAS PIPING DISCONNECT/RELOCATE REQUIRES A PRESSURE TEST/INSPECTION . 16) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 17) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 18) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR FINAL/COMPLETION APPROVAL. 1'J~r /o ~f UJto'lL f o)1 L~:p Jn-f h-AI'/