HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLC0-7-14-3288
Ken Sack/Eagle Springs
USDA Meat Processing Plant
482 CR 315
Silt, Colorado
1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC , IPC, IFGC, IFC , IECC, AND THE
MANUFACTURERS INSTALLATION SPECIFICATIONS.
2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS.
3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT.
4) ALTERATIONS TO EXISTING STRUCTURE IS TYPE VB CONSTRUCTION, F 1 OCCUPANCY .
5) CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS . FIRE DISTRICT
FINAL APPROVAL REPORT IS REQUIRED FOR FINAL/COMPLETION INSPECTION.
6) COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT (CDPHE) FINAL
APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION .
7) ENGINEER APPROVAL LETTER FOR EXISTING COOLER CONSTRUCTION IS REQU I RED FOR
FINAL/COMPLETION INSPECTION. (SEE LETTER IN FILE)
8) COMPLIANCE LETTER FOR COOLER EQUIPMENT INSTALLATION, SIGNED BY A QUALIFIED
MECHANICAL DESIGNER, IS REQUIRED FOR FINAL/COMPLETION INSPECTION.
9) ALL EXPOSED FOAM INSULATION MUST BE COVERED WITH A THERMAL BARRIER AS
REQUIRED PER 2009 IBC, CHAPTER 26.
10) ACCESSIBILITY REQUIREMENTS PER 2009 IBC, CHAPTER 11, AND ICC/ANSI A117 .1-2003.
11) PROVIDE EXIT SIGNS EQUIPPED WITH EMERGENCY LIGHTING AT ALL EXIT DOORS .
VERIFY EXIT SIGN LOCATIONS PRIOR TO ELECRICAL ROUGH-IN INSPECTION .
12) ELECTRICAL PERMITTING/INSPECTIONS BY THE COLORADO STATE ELECTRICAL BOARD.
13) ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION.
14) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION .
15) GAS PIPING DISCONNECT/RELOCATE REQUIRES A PRESSURE TEST/INSPECTION .
16) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12.
17) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008.
18) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR FINAL/COMPLETION APPROVAL.