Loading...
HomeMy WebLinkAbout2.0 Collateral ReleaseElll lTi'Jl'rlfl Irt l]ll lIAnrI lfflt'll I'ITIllfl lt llftltlli Il lll ReceotionB: 86S515 1atzeit2015 @3;41:38 PM Jean Fllbericoi-ir7-ii-nEc F6erSo.@0 Doc FeerO.@0 GRRFIELD COUNTY co Recitals l. Blue Heron Properties, LLC, a Colorado Limited Liability Company (Blue Heron), entered into a Subdivision Improvements Agreement ("SlA") with the Board of County Commissioners of Garfield County, Colorado ('tsOCC") dated September 21,2015 recorded on September2Z,IOLS at Reception Number 8683I0 in the records of the Garfreld County Clerk and Recorder. Z. Collareral for the public improvements for the SIA_is held by Land Title Guarantee Company pursuant to an EscrowAgreement recorded onCf-T ZO., 2015 at Reception Number E@Ei2-in ttre records of the Carfield County Clerk and Recbrder ("Escrow Agreement"). j. Blue Heron has presented certification to the BOCC from a licensed engineer that a portion of the construction -of I*provements has occurred in accordance with the SIA for Ironbridge Phase III Filing I and requests that the collateral amount be decreased based upon the partial completion. Acknowledqment NOW THEREFORE, ar the request of Blue Heron and in consideration of the premises and the prior agreements contained in the SIA and Escrow Agreement, the BOCC hereby: l. Acknowledges partial satisfaction of the security requirements of the SIA based upon the documentation provided by Blue Heron; 2. Authorizes disbursement of funds from the Escrow Account in the amount of $149,712.50' ACKNOWLEDGMENT OF PARTIAL SATISE'ACTION AND DIRDCTION TO RELEASE FT'NDS REI,ATED TO ESCROW AGREEMENT resulting iri a remaining balance of $641,582.50; and 3. Authorizes and directs Escrow Account to an authorized Title Guarantee ntativepf Blue OF ATTEST: By: to the Board funds held in the TSSIONERS to release D ro/r t f Martin, aa a SEAT Illl tll' J?l,l,Lll'llll r'lLlt I'llll?i'1il[' tlll]IJtJl lll tl'l' Il ll I Reeeotlonfi:869516 10t2cit"o15 03:41 :38 Pt't J€an Rlberico2 ot 1t Rec Fee:SO.OO Doc Fee:0-00 GARFIELD COUNTY C0 An Employec-Owncd ConPuY October I2th,20l5 Kathy Eastley, County Planner Garfield County Building and Planning Department 108 8th Street, Suite 201 Glenwood Springs, CO 81601 Re Ironbridge Phase III, Filing I - Partial Release of Collateral Request Number One (l ) HCE Project No. 2 l4 I 026.00 Dear Kathy On behalf of Blue Heron Properties, LLC the Owner of Ironbridge Phase III, Filing 1, and in accordance with the terms ofthe Subdivision Improvements Agreement by and between the Board of County Commissioners of Garfield County and the Owners, this lefter serves as the first request for partial escrowed collateral release: The contractor has completed Topsoil Stripping, Stockpile and Placement, partial Erosion and Sediment Control and a large portion of the mass Earthwork line items along with purchasing all of the required piping, manholes and grates for the storm sewer system that will be inslalled during this phase of construction. Please see attached Engineers Estimate for percentages completed. High Country Engineering, Inc. (HCE) has been on site as needed to observe the construction ofthe project and certiS that: l. All costs for which the release is being requested have been incurred in connection with the construction and material purchases for the improvements; 2. All wod1 performed and materials supplied are in accordance with the plans and specifications; 3. Allwork has been performed in a workmanlike manner; 4. No funds are being requested for work not completed, or for rnaterials not installed or stored on site: total reiease requested is for $149,712.50 for materials and labor. The contractors' invoices, checks payable and lien releases have been attached for backup to this escrow release. I 5 I 7 Blake Avenue, Suite l0 I Glem,ood Springs, CO 81601 telephone (970) 945-E676 -IG (970) 945-2555 rilr ilr rlr ll I lllltrlllll trllr ll I llt lrlllllrl rrl tlrlll Il lll Receotlon$: 8695f6 loi?o {?ol:"oP;3l i8?oB'o.J'Fi"?Af65'tE..rELD couNry co ,Garfield County Community Developme.-- October l2dn,2}l5 Page2 of2 Please see the enclosed summaries of the materials that have been purchased and are currently on the site awaiting installation. We are requesting the funds in the amount of $149,712.50 be released and considered complete. This leaves $641,582.50 to complete the remainder of the public improvements with the Cor.rnty and $30,000 for revegetation- Please contact me if you have any questions or need additional information. Sincerely, HIGH COUNTRY ENGII\IEERING, INC. Matthew Langhorst, P.E. Project Manager Cc:Eric Foerster - Ironbridge Karl Hanlon - Karp, Neu, Hanlon, PC Cost Estimate Original Total Previously Released lst Collateral Release Funds Remaining Phase III Public Improvements $791,295.00 $0.00 $149,712.50 $641,582.50 Garfield County Revegetation Payment $30,000.00 $0.00 $0.00 $30,000.00 TOTAL $821,295.00 $0.00 $149,712.50 $671.s82.50 _|il fl rr iIJI lfi I itT I l{rr l[rt h {1, l}i I'l['l fl IIJ'hh], I I ll IReception$: 869516lOl?O1.2015 O3:41:38 Pttl Jean Atberico4 ot 11 Rec Fee:90 0o Doc Fee;0.00 GFRFIEL0 cotrNTy co REQUEST FOR PARTTAL RELEASE OF ESCROW FUNDS Board of County Commissioners Garfield County, Colorado c/o Director of Community Development 108 8th Street, Suite 401 Glenwood Springs, CO 81601 RE: lronbridge Subdivision This request is written to formally notiff the BOCC of work completed for the Ironbridge Subdivision. As Owner [or On tZnayiJtt, AvnerJ, we request that the BOCC review the aftached Engineer's Certificate of Partiil Comptetion and approve a reduction in the amount held by Land T-itle Guarantee Company in Eicrow No. 519857 (the "Escrow Funds") in the amount of $ 1491712.50, to a reduc" the Escrow Funds to $ 641,582.50. The local Escrow Account Manager at Land Title Guarantee Company is Bob Rulan, l3l7 Grand Ave.' Suite 200, Glenwood Springs, C0 81601, Phone: giO-gqS-2A10. Attached is the certified original cost estimate and work completed schedule, showing: $ 791,295.00 $ 14i9,712.50 $ 641,582,50 Based on periodic observation and testing, the construction has been completed, to date, in accordance with the intent of the plans and specifications that were reviewed and approved by the BOCC or its representatives and referenced in Paragraph 2 of the Subdivision Improvements Agreement betlveen the BOCC and the Owner. If further information is needed, please contact Matthew Langhorst, at High Country Engineering, Ino. at 97 0'945'867 6. Owner Owner's RepresentativelEngineer APPROVED Name: Office: Engineers Cost Estimate Work Cornpleted. Reduced Face Amount of Escrow Funds or PII}ISE 3- 'InE FILING I$UBDIVISION'IRONB/fJDGE High,C0untry Engingertut, #lEILINGoF,SUMMAR.Y .RTLEASE,cdsrs 15, Updatcd lUl2l15 Escrow 026 Ph lll - HCE JOB NO: 214 1025.00 I - 9.r-1, COSTIJNITCOSTI.JNIT c.Y.$3.50 s5.00 s105,000.00 $30,000.00 s9.50s.Y s.F, 6,000 930 3,000 L.F. $102,070.00 50% s2.95 !J.ll:... l00o/o s11,850.00 975.000.00 89250.00 30.000.00 $ 15,200,00 loJ0o Moutable Cutb & Gutrcr Pcdcsrian Path SignGround Stop,(StrEct, Stockpile aad Sedimenr s406,920.00 s2.00 $25.00 s300.00 s,F, $90.00 $0% io/n in/o $ $ includcs md 10" D.LP,Class 52 WaterMain 1,230 Each l0'Gatc 4 L.F.s2,750.00 I s500.00 EachValvc l" Watcr Scrvicc 20 $rJ00.00 $30,000.00 Encascment Each s2,200.00 0% ...13;3*.9.9 s 1,200.00 s220o.0o Each st.200.00 o% $su3,000,00 includcs L.F $60.00 0%s Oo/oDia, Mrnholc $38J00.00 $ CoBeca to Sewcr Mdholc Each $3,@0.00 Oo/o Sewcr Scrvicc 7)sI,100,00 0%$ 18" ADS-N12 3?5 L.F.935.00 s13,r25.00 50%s $300.00 50%$l 18" ADS Flued End Scction I Each s 1,800.005'Storm I Eact s3,600,00 $3,600.00 5V/" Combination with Grate Inlct s3,000.00 s6,000.00 $ 3,000.00 l lJt2.50 L.F,$8.00 $7,500.00 $ L.F $3, Each TI$4.50 Ges)2,500 1.19.9. fimi$cdInsrallati on Shallow Seryicc s S s 6.Irr5EZ.50 Imralled InBastsucturc Amounl in Escrow: EstiInare f lil HllrIlIE ['+iil,I'Ht, ll[h,'ll'Hl'lli'l l]Ill lJI'hl' ll ll t Receotionfl:869516 1gt2eit2015 o3:41:38 PM Jean elbericos-oa 11 Rec Fee:$0.00 Doc Fee:@.@0 GABFIELD COUNTY CO lof'l iOUANTITYITEM 30,000assificd Excavadon c.Y s &10,400.003,200lonrol Bla:*et; Slopcs Steeper thm 3 : I 34,600.sphalt C.Y $45.00and WallisCross Paas,Class 6 Et s1,800.00Each 320.800.00 s 13,1,450.m $ r 1,000.00 10" End Cop Erch $500.00 0o/"s 2 s6,500.00 $r3.000.00 s Each 0o/o s 2 $4,400.00 $ Scwer I Each tr/o S StubComcst to Existing I $ t" SDR-35 ScwerPiPc 1,400 $&1,000.00 I Erch s4,800.00 il s3,000.00 $24,200.00 $1.1r,600.00 s s300.00 2 Each 5V/o $23,02s.00 s20,000.00 Tcleohono ud Coblc Conduit and Conduit ltrtallatiotr L.F s3.00 s0% 2,500 stt 750.00 s 791,295.00 Escrow Rclease'A.mormt # I UU1.blU NETDISCOUNTDATEAMOUNTACCOUNTNO,tNVolcE' 135,269.06135,269.0615-1499t2912015 ',i t'.'d iT3 ll*[,hB F'? fl D es &T 0.00 OHECK DATE Check 001510 CHECK NO.DISCOUNTS NETPAID ,135,269,06' - VENDOF NAME 9/30/2015 Hobbs Excavating LLC Blue Heron DeveloPment ComPanY 430 honbridge Drive Gleuwood Springs, CO 81601 970.384.0630 @ba nk2S4tO20 tgot @ 0 T DATE ,. i . i, .. PAY *ONE HUNDRED THIRTY-FIVE THOUSAND TWO HUNDRED SIXry.NINE 9t30t2015' , CHECKNO.r:l'. r' 'l TOTHE OBDER OF Hobbs Excavatlng LLC 1760 Gupsum Creek Road Gypium, CO 81637 rionbs ''**-.S n,o0t5 Ior. r:to eoo0o lI!: IolgElLEqLOqF R LSPEIAI NETDISCOUNTAMOTJNTDATEACIOUNT.NO.INVOICE 135,269.06 ;t']);il;o- I il],: i:r,i ,t;r "- J ,.tv 0.00 135,269.06 I i 9t29t2015 15-149 t =ii-..:'- r..-.'?l i'i '.i, !-:T ". ,'j.'- CHEOK DATE cflEcKNo. Gheck 001510 VENDOR NAME 9/30/2015 Hobbs Excavating LLC NETPAID 135,269.06 tll tlrrl' Et'i'{llil,ltl'l,Lrfi I J'il [' ltIHtlI htLr' ! I"'l' I I il ] [,11f'??df#i;t'iif#,":"F!"?ttaa'EB*rrELDcouNTyco DISCOUNTS 001 s10 ,r i: ,'i .; '-(,'l8rr")z i. t n.:,i ' i- BACK 0 01511 NETDISCOUNTAMOUNTDATEACCOUNTNO.tNVO|CE' 73,950.00 ,i ,;? q::{ n"1 * iia' $ fl.} ffi 4s. 0.00 73,950.009/3012015 15-154 CHECK DATE Check 001511 CHECK NO.DISCOUNTS,. .lNrrpeio .' ., .a 1.. r, 73;9s0.00 VENDOE NAME 101112015 Hobbs Excavating LLC ,+: Blue Heion Devel-brprirest Codpany 430 Ironbridde DriYb I , Gleni*ood Spriogs, CO P1691 970.384.0530 23-211V20 -:" ! t" HUNDRED ',i .i PAY *SEVEN.TY..TH.REE THOUSA\D NIITF ,':rorHE Hobus Excavating LLC oRDEH 1760 Guosum Cieek RoadoF cypsumico,81,637 -i L.'lt 1 ,,.1...,1,. i I I I -tl ti, J; I,.1 IIOBBS, ' 'l' '" ' t: iO a0O00 I Itl l0lE8ltEqL0qr' :.,1 1., {. NETDtscouNTAMOUNTDATEACCOUNT NO.tNvolcE -- r rr ;"' i r,l3 f:3 ii rT**\ ,-' -. ':. {;1" 'i.-".i "l'.'t r';r 'r';{ J d-J ,l":t'j fu_"rt_'!-, CHECK OATE CHECK NO,NETPAIDVENDOR NAME lll illPrt' E ll{l l'I,iJl'{[ lll{,| JilJI} lt"liH' II t J lJ# rI il ll tl I i'"f',"'?idid:ti,i:t;'f:lB-'.3"i8"14:6','EERFrELocouNTyco DISCOUNTS ' '001511 I I I tt t I ,I I I I I I I L I II Ir ,i! ,l T, -i.;i .il"" ri I I 1{"$r,.,,###H,"j:il;il:ffi il:J':::::lT'"" Hobbs Excavating and Truoking LLC (Since l?Z8'b,p'rm creekRd Gypsum, CO 81637 lnvoice DATE INVOICE NO. 9BAD0ls l5-154 BILL TO Blue Heron DeveloPcment Co. ,130 Ironbridgc Drivc Gletwood SPlngs, CO 81501 Comments AMOUNTRATEQTYDESCRIPTIONITEM 2,500.00 45,000,00 17,250.00 7,?00.00 1,500,00 2,500.00 4.50 2.875 2.20 1,500.00 10,000 6,000 3,500 +ft\ ;Ida#ll*{ A$ii S APPR -.3t1 DESCRIPIION mobilization cut to IiIl ship topsoil to stock Pile iostall silt fence tracking pad CODE As bid As bid As bid As bid Asbid Total rBBs0.o0Thnnk you, HONSS EXCAVAIING AND TRUCKING ?H+H,+f-'i,*,l#.itll]-.flll}::':..1".'.T-l'ttil,t CONDITIONAL WAIVER AND RELEASE T]PON PROGRESS PAYMENT Upon receipt by the undersigned of a check from Blue Heron Properties LLC in the sum of $731950.00 payable to Hobbs Excavating LLC and whenthe check has beenproperly endorsed and has been paid by the bank upon which it is dra'am, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job of Blue Heron Development Cornpany located in Garfield County, Colorado to the following extent. This release cevers a progress payment for labor, services, equipment or material fumished to Blue Heron Development Company ttuough IBD1LS only and does not cover any retentions retained before or after the release date; extas fumished before the release date for which payment has not been received; extras or items furnished after the release date. Righs based upon work performed or items furnished under a written change order which has been fully expected by the parties prior to the release date are covered by this released unless specifically reserved by the claimant in this release. This release of any mechanics' lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contmct bases upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material covered by the release was not compensated by the progress payment. Before any recipient of this document relies on it, said party should veriff evidence of payment to the undersigned. Dated: October 1,2015 Subcontractor: Hobbs LLC B ReceotionH: 869516 18r3?'??'F"3';31 ;88.EB ri:"P"ll8:6a"3enpreLo couNry co HOBBS EXCAVATINGLLC Since 1973' 1760 G\?SUM CREEK ROAD GYPSUM, CO.81637 q1o - ra * _tfD /{: BILLTO Blue Heron Developement Co. 430 Ironbridge Drive Glenwood Spings, CO 81601 lnvoice DATE INVOICE NO. 8t3U20t5 t5-149 a1o'5>'l':7+-{7 Elil g4 _ 1.qqy lat -i Comments ITEM DESCRIPTION QTY RATE AMOUNT Material- Material- concrcte materials nceded for phase 3 filing I pipe parts for phase 3 liling I f; fi ill " iit l'F -----Pg ;elfr'[' Dtl.1 i.. ;;'1,1;;r,i - frur" Jil-)$t;h- ff.iijijr ; i"."" "'"'"" 125*,znooo ,f',,' i'; rl.i:, ;l.l^i s ,.ii ^--*f-' -- lttf- 23,311.00 I I1,958.05 23,3u.00 1 I 1,958.06 Thank you, HOBBS EXCAVATING A}.ID TRUCKING Total s115,269.06 #L,ti,'+xt'.:i,'!Hh|il"'l'"i'I,,I::::,::'jj',T.''u' CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT Upon receipt by the undersigned of a checlc from Blue Heron Properties LLC in the sum of $135,269.06 payable to Eobbs Excavating LLC aud when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or boud right the undersigned has on the job of BIue Heron Development Company located in Garfield County, Colorado to the following extent. This release covers a progress payment for labor, services, equipment or material furnished to Blue Heron Development Company tbrough 9l30tl5 only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items fumished after the release date. Ngtrts based upon worlc performed or items furnished under a written change order which has been fully expected by the parties prior to the release date are covered by this rcleased unless specifically reserved by the claimant in this release. This release of any mechanics' Iien, stop notice, or bond right shall not otherwise affect the contact rights, including riglts between parties to the contact bases upon a rescission, abandonment, or breach of the contract, or the right of the rmdersigned to tecover compensation for furnished labor, services, equipment, or material covered by this release if that fumished labor, senrices, equipmen! or material covered by the release was not compensated by the progress payrnent. Before any recipient of this document relies on it, said party should verify evidence of palm.ent to the undersigned. Dated: September 30, 2015 Subcontractor: Hobbs Excavating LLC Tifle:fu.-,