Loading...
HomeMy WebLinkAboutCertificate of Architectual ApprovalEXHIBITC Certificate of Architectural Approval Elk Springs Architectural Review Committee o~kr 2..0\'j ·~...a.....-==---......... ....._~~--~~~~~~Titled::_J~:J::__I.:£~:..Z::L!::!....:._J~:s::!.:::.......l::::!.QQ.L......t:::.~~~:!!:::::t:..._~ To be constructed on Lot: Filing: Los Amigos Ranch PUD, Garfield County, Colorado is hereby given by the Elk Springs Architectural Review Committee (ARC) with the following conditions and exemptions: 1 . The General Contractor must meet with the ARC to obtain Contractor Excavation Approval. 2. All revisions required have been made and submissions have been reviewed and approved by the ARC. 3. All Final Submissions have all required professional stamps. 4. All applicable permits, licenses and proof of insurance documents will be required prior to contractor excavation approval. 5. All required fees, deposits, Set Asides/Bonds/Letters of Credit/Cash Deposits (circle one) will be required prior to contractor excay,ation. ~.&£.val. 6. An amount of .:i.Jfi8u . has been Set Aside/Bonded/Given as a Letter of Credit/Placed in Escrow 5circl.:r _. one) to cover the requirements for landscaping and driveway construction on the approved plans. ~ · f.1TY' ~. 7. The highest roof ridgeline must not exceed: in elevation, as indicated on approved plans. All other ridgelines must be within 4" of stated height 8. A maximum number of N ff\ trees will be required, in accordance with Section 5.15.2 of the Design Requirements and Guidelines. I 9. Owner and General Contractor understand and agree that all construction will be in strict compliance with plans approved by the ARC and that any changes to the approved plans must be submitted in writing to the ARC for approval in accordance with Section 3 of the Design Requirements and Guidelines. 10. A Certificate of Compliance must be obtained from the ARC within two years of the Effective Date shown in the Contractor Excavation Approval section of this document, or the date of issuance if excavation approval is not applicable. 11. Other Provisions: NOTE: This Certificate of Architectural Approval is automatically revoked one year from the date ofissue if construction has not commenced. Review of plans by the ARC does not confer compliance with local building codes or other authorities. Approval for conformation with building codes must be sought from the local authorities. This Certificate of Architectural Approval is not effective until: 1. All conditions and exceptions are acknowledged by owner, as evidenced by his/her signature on the original of this document 2. The executed original is returned to the Elk Springs Office. 3. Contractor's Excavation Approval is granted, if applicable. CONTRACTOR EXCAVATION APPROVAL Required before any clearing and excavation can begin. The following Conditions and Requirements have been met: 1. Pre-construction meeting has been held and all conditions of 4,5 and 6 of the Certificate of Architectural Approval have been met 2. All trees to be removed have been re-flagged (if needed). 3. Site and driveway stakes are still in place, or have been restored. 4. Green plastic fencing has been erected as needed. 5. Address sign and Exhibit J have been erected. 6. Toilet facilities are in place. 7. Benchmarks are still in place and visible. Therefore approval is given to begin clearing and excavation. Effective date: .5 N ~ l)...V" Lo l 5 _ Approval ;ssued by, ~ ~ Elk Springs Architectural Revie~,k:ommittee