Loading...
HomeMy WebLinkAboutMemo from EngineerALBRIGHT ASSOCIATES To : Tim Boyle From : Jack Albright, PE Date : December 7, 2012 Re : Boyle Garage Memorandum /3-7-12- As z-7-IL As requested, 1 visited the site to observe the structural bolting of the steel frames for the project referenced above on December 6, 2012. The bolts matched the A325, 3/4" diameter specification from the Albright & Associates structural plans. Furthermore, the bolts were installed and tightened to the appropriate specification by the American Institute of Steel Construction. Please contact us if there are any questions regarding the above information. Thank you for the opportunity to work with you on this project. 11005 MI Albright 8 Associates, INC - 970.927.4363 office - 970.927.3039 fox - 402 Park Ave., Unit E - Basalt, CO 81621 - www.albright•associates.com