Loading...
HomeMy WebLinkAbout2.0 Correspondence20I4 BLAKE AVENUE GARFIELD trtrUNTY PLANNING DEPARTMENT GLENWEOD SPRtNGS, COLORAOO BI60I PHONe 945-El212 Mattingley Subdivision Sketch Plan Concerns: 1. Access across the Silt Bridge is limited. The county is pursud.ng construction of a new bridge, but completion of the bridge is not finalized at this point. Tin Callahan was required to put $1000for each new lot he created into a fund for a new bridge. 3. 2. Water must be available to well permit for the parcel well must pump at least 5 Recouslendations : Approval for exemption from full conditions: 1. That $1000 for each new lot inpact on the Silt Bridge. the possible construction of each lot. The applicant has a domestic and a household wel-1 permit. The domestic serve each new lot. any mortgagee on a parcel parcel of land. No l-etter by the department. subdivision review with the following gallons/minute to County subdivision regulations require that of land must consent to subdivision of that of consent for subdivision has been received 2. That an easement from the domestic without a well- perrr-it and that the hour pump test on the well showing created be given to the The $f000 j-s to be used a new bridge. well be provided county receive a a capacity of at consent from the county for the to assist in to the new lot copy of a 24 least 10 gpm. mortgage regarding t. C""^^0Ja ffi.,r:o olu.#.tt ryrJe L r//fr b l4'-fW od\ Oil 3. That the county receive a letter of the proposed subdivision.