Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLC0-12-15-4011 WPX Energy Rocky Mtn. LLC Water Management Facility Parachute, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC AND MANUFACTURERS SPECIFICATIONS. 2) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS . 3) ALL WORK MUST COMPLY WITH THE CONDITIONS OF THE CURRENT LAND USE PERMIT. 4) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, 2200 PSF . 5) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR . PROVIDE AN APPROVAL REPORT AT FINAL/COMPLETION INSPECTION. 6) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/COMPLETION INSPECTION. 7) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 8) LOCKS, LATCHES AND LANDINGS PER 2009 IBC, SECTION 1008. 9) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR COMPLETION APPROVAL.